Quadra-Fire CB1200M-MBK - Manual

Quadra-Fire CB1200M-MBK

Quadra-Fire CB1200M-MBK – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
Page: / 48

Table of Contents:

  • Page 2 – Page 2; and Welcome to the Quadra-Fire Family; SA; SAMPLE SERIAL NUMBER / SAFETY LABEL LOCATION:; Report Number
  • Page 3 – Page 3; TABLE OF CONTENTS; Safety Alert Key:
  • Page 4 – Listing and Code Approvals; A. Appliance Certification; NOTE: Some generator or battery back-up systems
  • Page 5 – ations; Warning! Risk of Fire; Getting Started
  • Page 6 – C. Thermostat Location; WARNING
  • Page 7 – G. Tools And Supplies Needed; Or any such action that may cause a fire hazard.
  • Page 8 – Page 8; Dimensions and Clearances; A. Appliance Dimensions; CL; CL; Figure 8.2 - Top View with Top Vent Adapter
  • Page 10 – Hearth Pad Requirements
  • Page 11 – Do not terminate vent; CAUTION; A. Chimney and Exhaust Connection; INSTALL VENT AT CLEARANCES SPECIFIED BY THE; Substitute or damaged vent components may; B. Venting Termination Requirements; Vent Information; Vent surfaces get HOT, can cause burns if
  • Page 12 – D. Pipe Selection Chart; ALTITUDE IN THOUSANDS OF FEET; Example 1
  • Page 13 – Venting Systems; Illustrations reflect typical installations and are FOR; All minimums listed are to a combustible surface.; Alcove Installation
  • Page 14 – Straight Out; In Canada, where passage through a wall or partition of; Illustration shows venting going in both directions.
  • Page 15 – C. Vertical into Existing Class A Chimney
  • Page 16 – F. Alternate Masonry
  • Page 17 – Mobile Home; pages 9; THE STRUCTURAL INTEGRITY OF THE MANUFAC-; • Any supporting material that would affect the structural; NEVER INSTALL IN A SLEEPING ROOM.; Installation must comply with Manufactured Home and; You must use a Quadra-Fire Outside Air Kit; Never draw outside combustion air from:
  • Page 18 – A. Outside Air Kit Instructions; Rear Installation; Floor Installation; Secure Collar
  • Page 19 – B. Top Vent Adapter Installation; Installing the Top Vent Adapter; C. Rear Vent and Rear Vent to Top Vent
  • Page 20 – D. Optional Brick Set Installation; Note: Figure 20.5 shows the finished shape of the brick; Installed Clip; E. Brick Clip Installation; • Brick may have small wires protruding from
  • Page 21 – Logs are FRAGILE. Use extreme care when handling or; LOCATING PINS; Top Log; Install Logo; Do not open top all the way back so the weight of the; It will damage the; It will be necessary to prop the top up with
  • Page 22 – J. Thermostat Installation; • Do NOT remove grounding prong from plug.; Power Outlet; I. Door Installation; H inge; Rod and nut
  • Page 23 – Operating Instructions; A. Fuel Size And Material; If you; Shelled Field Corn; B. General Operating Information; Thermostat Calls For Heat; Heat Output Controls; Keep combustible materials, gasoline; • Do NOT store flammable materials in the appliance’s; KEROSENE, CHARCOAL LIGHTER FLUID OR; • Keep all such liquids well away from the heater while it
  • Page 24 – set loose at the factory; F. Feed Rate Adjustment Instructions
  • Page 25 – page; H. Frequently Asked Questions; ISSUES; Back side of Firepot; Figure 24.1 - DO NOT LEAVE FIREPOT FLOOR OPEN
  • Page 26 – Troubleshooting; action to be taken.; Symptom; Possible Cause
  • Page 29 – Maintaining & Servicing Your Appliance; C. General Maintenance; Depending on the type of fuel you are burning will dictate; Shock and Smoke Hazard; A. Proper Shutdown Procedure; B. Quick Reference Maintenance Chart; Follow the detailed instructions found in this; Cleaning or Inspection; Frequency; Not properly
  • Page 31 – There are heavy duty vacuum cleaners specifically; Handle glass assembly with care.
  • Page 32 – Cleaning the Top Vent Adapter; There are heavy duty vacuum cleaners specifi
  • Page 33 – Ash Build Up in Firebox; D. High Ash Fuel Content Maintenance; Convection Blower Replacement; The motor is mounted on a removable bracket. Remove the; E. Blower Replacement; is shown in; Figure
  • Page 34 – Exhaust Blower Replacement; G. Igniter Replacement; Igniter; Remove existing blower:
  • Page 35 – H. Glass Replacement; latch, you must remove the door latch first
  • Page 36 – Reference Materials; Heat Output Switch; When describing the location of a component,; Convection Blower
  • Page 37 – Wiring Harness
  • Page 38 – B. Component Locations; Cleaning Rods
  • Page 39 – Service Parts; Classic Bay Freestanding; Beginning Manufacturing Date: April 2009; Part number list on following page.
  • Page 40 – ITEM; e Assembly
  • Page 41 – #10 Firepot Assembly and Associated Parts
  • Page 43 – #39 Feed Motor Assembly
  • Page 45 – ACCESSORIES
  • Page 48 – For the number of your nearest Quadra-Fire dealer; NOTICE; DO NOT DISCARD THIS MANUAL; DO NOT
Loading the manual

R

www.quadrafire.com

7014-179D

December 16, 2011

CLASSIC BAY 1200 PELLET STOVE

O - T L

Tested and

Listed by

Portland

Oregon USA

OMNI-Test Laboratories, Inc.

C

US

Owner’s Manual

Installation and Operation

CB1200M-MBK

Model:

DO NOT DISCARD THIS MANUAL

NOTICE

• Important operating and

maintenance instruc

-

tions included.

Leave this manual with

party responsible for use

and operation.

Read, understand and

follow these instruc

-

tions for safe installa

-

tion and operation.

DO NOT

DISCARD

WARNING

Please read this entire manual

before installation and use of this

pellet fuel-burning room heater.

Failure to follow these instructions

could result in property damage,

bodily injury or even death.

Do not store or use gasoline or other flam

-

mable vapors and liquids in the vicinity of this

or any other appliance.

• Do not overfire - If any external part starts to

glow, you are overfiring. Reduce feed rate.

Overfiring will void your warranty.

• Comply with all minimum clearances to com

-

bustibles as specified. Failure to comply may

cause house fire.

Check building codes prior to installation.

• Installation MUST comply with local, regional, state and national

codes and regulations.

• Consult local building, fire officials or authorities having jurisdic

-

tion about restrictions, installation inspection, and permits.

CAUTION

Tested and approved for wood pellets and shelled

field corn fuel only. Burning of any other type of fuel

voids your warranty.

CAUTION

WARNING

Hot glass will cause burns.

• Do not touch glass until it is cooled

• NEVER allow children to touch glass

• Keep children away

• CAREFULLY SUPERVISE children in same room as

fireplace.

• Alert children and adults to hazards of high

temperatures.

High temperatures may ignite clothing or other

flammable materials.

• Keep clothing, furniture, draperies and other flammable

materials away.

HOT SURFACES!

Glass and other surfaces are

hot during operation AND

cool down.

To obtain a French translation of this manual, please

contact your dealer or visit www.quadrafire.com

Pour obtenir une traduction française de ce manuel,

s’il vous plaît contacter votre revendeur ou visitez

www.quadrafire.com

NOTE

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - Page 2; and Welcome to the Quadra-Fire Family; SA; SAMPLE SERIAL NUMBER / SAFETY LABEL LOCATION:; Report Number

Page 2 7014-179D December 16, 2011 R CB 1200 Pellet Stove and Welcome to the Quadra-Fire Family ! Hearth & Home Technologies welcomes you to our tradition of excellence! In choosing a Quadra-Fire appliance, you have our assurance of commitment to quality, durability, and perfor - mance.This comm...

Page 3 - Page 3; TABLE OF CONTENTS; Safety Alert Key:

R December 16, 2011 7014-179D Page 3 CB 1200 Pellet Stove Section 1: Listing and Code Approvals A. Appliance Certifications ...................... 4 B. Mobile Home Approved ...................... 4 C. Glass Specifications ............................ 4 D. Electrical Rating .............................

Page 4 - Listing and Code Approvals; A. Appliance Certification; NOTE: Some generator or battery back-up systems

Page 4 7014-179D December 16, 2011 R CB 1200 Pellet Stove 1 Listing and Code Approvals A. Appliance Certification C. Glass Specifications E. BTU & Efficiency Specifications This appliance is equipped with 5mm ceramic glass. Replace glass only with 5mm ceramic glass. Please contact your dealer fo...

Other Quadra-Fire Models

All Quadra-Fire Other