Page 2 - Complete this page for quick reference when service is required:; Date of Installation:; Information found on the data label:; Voltage
Complete this page for quick reference when service is required: Taylor Distributor: Address: Phone: Service: Parts: Date of Installation: Information found on the data label: Model Number: Serial Number: Electrical Specs: Voltage Cycle Phase Maximum Fuse Size: A Minimum Wire Ampacity: A E May, 1999...
Page 3 - Table of Contents
Model 220 Table of Contents Table of Contents Section 1 To the Installer 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Installer Safety 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Site P...
Page 5 - Section 1; Installer Safety; Site Preparation
1 Model 220 To the Installer 081208 Section 1 To the Installer The following are general installation instructions. For complete installation details, please see the check out card. Installer Safety In all areas of the world, equipment should be installed in accordance with existing local codes. Ple...
Page 7 - Beater Rotation; Refrigerant
3 Model 220 To the Installer 120806 S Stationary appliances which are not equipped with a power cord and a plug or another device to disconnect the appliance from the power source must have an all-pole disconnecting device with a contact gap of at least 3mm installed in the external installation. S ...
Page 8 - Compressor Warranty Disclaimer
4 Model 220 To the Operator 080911 Section 2 To the Operator The freezer you have purchased has been carefully engineered and manufactured to give you dependable operation. Your Taylor freezer, when properly operated and cared for, will produce a consistent quality product. Like all mechanical produ...
Page 11 - Section 4
7 Model 220 Operator Parts Identification Section 4 Operator Parts Identification ITEM DESCRIPTION PART NO. 1 PAN-DRIP 027503 2 COVER A.-HOPPER-110-220 X24778 3 GASKET-HOPPER COVER 011412 4 PANEL-REAR 031749 5 FUNNEL A.-MIX X35636 6 LOUVER-SIDE L & R 019566 7 PANEL-UPPER SIDE R. 033125 8 PANEL A...
Page 12 - Beater Door Assembly
8 Model 220 Operator Parts Identification Beater Door Assembly ITEM DESCRIPTION PART NO. 1 ROD A.-DRAW X30079 2 HOLDER A.-BEARING X30078 3 O-RING-2-1/8 OD X .139W-#225 020051 4 PISTON-VALVE 030083 5 PIN-HINGE X04329 6 PIN A.-PIVOT X34737 7 DOOR A.-PARTIAL SPOUT X32938 8 CAP A.-COVER X29667 ITEM DESC...
Page 13 - Accessories
9 Model 220 Operator Parts Identification Accessories ITEM DESCRIPTION PART NO. 1 PAIL-MIX 10 QUARTS 013163 2 BRUSH-MIX TANK BODY 3”X7” 023316 3 BRUSH-DRAW VALVE 1-1/2”X3” 014753 4 BRUSH-REAR BRG 1”X2”X14” 013071 ITEM DESCRIPTION PART NO. 5 LUBRICANT-TAYLOR 047518 6 SANITIZER KAY-5 125 PKTS. 041082 ...
Page 14 - Symbol Definitions
10 Model 220 Important: To the Operator Section 5 Important: To the Operator Figure 1 ITEM DESCRIPTION 1 Control Switch (Switch--Rocker) 2 Dial Light (Light--Orange--Round) 3 Temperature Control (Control--Temp.) Symbol Definitions To better communicate in the International arena, the words on many o...
Page 15 - Assembly
11 Model 220 Operating Procedures Section 6 Operating Procedures The Model 220 freezer can produce all flavors of ice cream, including those with fruits and nuts. The freezer is designed for filling pints, quarts or gallons to be placed in a hardening cabinet. The unit has a 10 quart (9.5 liter) mix...
Page 19 - Sanitizing
15 Model 220 Operating Procedures 080911 Step 7 Install the shelf. Choose the level desired and align the grooves in the back of the shelf with the holding collars. Slide the shelf down over the holding collars of the same height on the left and right sides. Figure 20 Sanitizing Step 1 Prepare a pai...
Page 21 - Priming
17 Model 220 Operating Procedures 060425 Priming Step 1 Place the funnel in the mix inlet hole at the rear of the hopper. Turn the funnel to the right or left so that the opening in the funnel does not align with the opening in the mix inlet hole. Figure 29 Step 2 Pour 10 quarts (9.5 liters) of FRES...
Page 23 - Overrun
19 Model 220 Operating Procedures 060425 Step 8 To add fruits and nuts, place the control switch in the “EJECT” position. There are two ways to add fruits and nuts, as follows: Fruits and nuts can be added through the mix hopper funnel assembly. Use the plunger to press the ingredients down into the...
Page 24 - Drawing Product
20 Model 220 Operating Procedures Step 5 If the scale does not have overrun graduations, then weigh one pint (1/2 liter) of mix before freezing. Draw a sample pint (1/2 liter) of frozen product and level it off with a straight edge. Step 6 Place the pint (1/2 liter) of product on the scale and read ...
Page 27 - Section 7; During Cleaning and Sanitizing; Troubleshooting Bacterial Count
23 Model 220 Important: Operator Checklist 051101 Section 7 Important: Operator Checklist During Cleaning and Sanitizing Cleaning and sanitizing schedules are governed by your State or local regulatory agencies and must be followed accordingly. The following check points should be stressed during th...
Page 28 - Winter Storage
24 Model 220 Important: Operator Checklist 080221 Winter Storage If the place of business is to be closed during the winter months, it is important to protect the freezer by following certain precautions, particularly if the building is subject to freezing conditions.Disconnect the freezer from the ...
Page 29 - PROBLEM
25 Model 220 Troubleshooting Guide Section 8 Troubleshooting Guide PROBLEM PROBABLE CAUSE REMEDY PAGE REF. 1. Unit will not run in the “AUTO” position. a. Unit is unplugged. a. Plug in wall receptacle. -- -- b. Circuit breaker is off. b. Turn the breaker on. -- -- c. Unit is off on reset. c. Place c...
Page 31 - Section 9
27 Model 220 Parts Replacement Schedule Section 9 Parts Replacement Schedule PART DESCRIPTION EVERY 3 MONTHS EVERY 4 MONTHS EVERY 6 MONTHS ANNUALLY QTY. Front Bearing X 1 Scraper Blades X 3 Drive Shaft Seal X 1 Funnel O--Ring X 1 Freezer Door O--Ring X 1 Bearing Holder and Valve Piston O--Ring X 2 B...