Pelco C2453M-D (2/06) - Manual
Pelco C2453M-D (2/06) – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 5 – Welcome
- Page 6 – Getting Started; TEST THE HANDHELD TO ENSURE IT IS READY FOR USE
- Page 7 – INSTALL THE MONITOR BATTERIES; Reinstall the battery pack onto the monitor.
- Page 8 – How to Assemble the Remote Monitor Kit
- Page 11 – How to Adjust the Monitor
- Page 13 – PTZ CONTROL MENU
- Page 14 – How to Upload Software; Assemble the remote monitor kit. Refer to
- Page 15 – HOW TO DOWNLOAD SOFTWARE TO THE HANDHELD
- Page 16 – Troubleshooting
- Page 17 – Specifications
- Page 18 – PRODUCT WARRANTY AND RETURN INFORMATION
I N S TA L L AT I O N / O P E R AT I O N
Integrated Positioning
System
Remote Monitor Kit
IPS-RMK
C2453M-D (2/06)
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
C2453M-D (2/06) 5 Welcome Thank you for purchasing Pelco's IPS-RMK, the remote monitor kit designed to assist in the installation and servicing of Spectra III ™ SE/Spectra III, Spectra ® Mini, Esprit ® , or ExSite ™ systems. Use the remote monitor kit to observe video, verify operation of the PTZ co...
6 C2453M-D (2/06) Getting Started Before using the remote monitor kit, do the following: 1. Test the handheld to make sure it is ready for use. 2. Install the batteries for the monitor. TEST THE HANDHELD TO ENSURE IT IS READY FOR USE Batteries and software for the handheld were installed at the fact...
C2453M-D (2/06) 7 INSTALL THE MONITOR BATTERIES The battery pack located on the back of the monitor holds 8 AA or 10 NiCad rechargeable batteries (batteries not included). To install the batteries, do the following: 1. Remove the mointor from the monitor compartment of the IPS-RMK (refer to Figure 1...