Field Controls SK-1 - Manual

Field Controls SK-1

Field Controls SK-1 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
Page: / 12

Table of Contents:

  • Page 2 – INSTALLATION REQUIREMENTS; ROOF PITCH; Figure 1
  • Page 3 – INSTALLATION; Before installation, apply two beads of high temperature; Figure 2
  • Page 4 – SPECIAL VENTING APPLICATION INSTALLATION SHEET; Figure 4
  • Page 5 – STARKAPTM; EXIGENCES D’INSTALLATION; PENTE DE TOIT; Schéma 1
  • Page 6 – Avant l’installation, appliquer deux cordons de scellant de; Schéma 3
  • Page 7 – FEUILLE D’INSTALLATION POUR ÉVENT SPÉCIAL; Schéma 4
  • Page 8 – StarKapTM; REQUISITOS PARA LA INSTALACIÓN; de cualquier ventana o abertura hacia el edificio.; Figura 1
  • Page 9 – INSTALACIÓN; Antes de la instalación, aplique dos gotas de; Figura 3
Loading the manual

STARKAP™ CHIMNEY CAP

Model:

SK-1

The MODEL SK Starkap™ is designed for terminating gas vents or
metal chimneys for gas or oil heating equipment.

English ....... Page 1
Français ..... Page 5
Espanõl ...... Page 8

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - INSTALLATION REQUIREMENTS; ROOF PITCH; Figure 1

Page 2 INSTALLATION REQUIREMENTS 1. Install and secure the vertical vent, gas vent or metal chimney according to manufacturer's instructions or in accordance with NFPA 54 National Fuel Gas code or applicable local codes. The termination of the vertical vent or metal chimney MUST be installed in acco...

Page 3 - INSTALLATION; Before installation, apply two beads of high temperature; Figure 2

Page 3 INSTALLATION 1. Before installation, apply two beads of high temperature silicone sealant or equivalent around the bottom of the storm collar and 1 inch above the end of the Starkap™ body. (See Figure 2) 2. Insert the Starkap™ into the inside of the vent termination pipe, making sure the Star...

Page 4 - SPECIAL VENTING APPLICATION INSTALLATION SHEET; Figure 4

Page 4 SPECIAL VENTING APPLICATION INSTALLATION SHEET This sheet covers the requirements for installation of the Starkap™ for use with attached buildings designed for the purpose of housing heating equipment outside of the living space of the structure. These requirements are based on A.G.A. test re...

Other Field Controls Models

All Field Controls Other