Pelco C3422M-B - Manuals

Pelco C3422M-B – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20

Summary

Page 2 - Preinstallation

2 C3422M-B (3/08) Preinstallation NOTE: This manual is designed to be a reference tool for the installation of your system. For best results and ease of installation, the dome system should be assembled, pressurized, and tested before installation. A Pressurized Spectra ® IV cable harness (supplied ...

Page 5 - Dome Drive

C3422M-B (3/08) 5 7. Install the lower dome: a. Position the lower dome so that the blower duct inside the back box is between the studs attached to the inside of the lower dome. b. Install the V-band around the lower dome and then tighten the fastener of the V-band. c. Test the operation of the uni...

Page 7 - Site Installation

C3422M-B (3/08) 7 Site Installation 1. Feed a fiber optic cable (not supplied) and the supplied wiring harness into the front of the mount and out the back of the mount. Connect the wires as required. Refer to Table B, Table C, and Table D on page 10, and Table E on page 11 for cable and wiring info...

Pelco Manuals