Pelco IPSXM-7 - Manual
Pelco IPSXM-7 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 4 – Important Safety Instructions; RISK OF ELECTRIC SHOCK.
- Page 5 – Getting Started
- Page 6 – Install the Power Module
- Page 7 – Connect Wiring; Configuration of Wire Harness
- Page 8 – DIP Switch Settings; Protocol Settings; Switch Settings for SW3
- Page 9 – Tables
- Page 13 – Specifications; ELECTRICAL
I N S T A L L A T I O N
ExSite
™
Series
Explosionproof
Power Module
C313M-D (8/05)
IPSXM-2 and IPSXM-7
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
4 C313M-D (8/05) Important Safety Instructions 1. Read these instructions. 2. Keep these instructions. 3. Heed all warnings. 4. Follow all instructions. 5. Do not block any ventilation openings. Install in accordance with the manufacturer’s instructions. 6. To reduce the risk of ignition of hazardou...
C313M-D (8/05) 5 Getting Started Thank you for purchasing Pelco’s ExSite ™ Series explosionproof integrated positioning system. This manual includes instructions for installing the power module for the ExSite Series system. For complete system installation instructions refer to the installation manu...
6 C313M-D (8/05) Install the Power Module Attach the power module to the mounting surface. Use only installation methods and materials capable of supporting four times the maximum specified load of the system (220 lb/100 kg). NOTE: If required, install the optional TXB translator, fiber module, or U...