Pelco C2478M-B-ML (2/05) - Manual

Pelco C2478M-B-ML (2/05)

Pelco C2478M-B-ML (2/05) – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
Page: / 28

Table of Contents:

  • Page 4 – Preinstallation; English
  • Page 6 – Site Installation
  • Page 8 – Preinstalación; Español
  • Page 10 – Instalación en la ubicación
  • Page 12 – Português
  • Page 14 – Instalação no local
  • Page 16 – Italiano
  • Page 18 – Installazione in loco
  • Page 20 – Français
  • Page 22 – Installation sur place
  • Page 24 – Vorinstallation; Deutsch
  • Page 26 – Installation vor Ort
Loading the manual

®

I N S T A L L A T I O N

Pressurized
Spectra III

Series

English

Español

Português

Italiano

Français

Deutsch

C2478M-B-ML (2/05)

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 4 - Preinstallation; English

4 C2478M-B-ML (2/05) Preinstallation English 1 Loosen the V-band attached to the back box and let it hang to the side. 2 Prepare the lower dome for installation: a. Remove the O-ring from the lower dome. b. Lightly apply O-ring lubricant (supplied) to the O-ring. c. Reinstall the O-ring in the groov...

Page 6 - Site Installation

6 C2478M-B-ML (2/05) Site Installation English 1 Feed the supplied wiring harness into the front of the mount and out the back of the mount. Connect the wires as required. Refer to Tables A, B, and C for cable and wiring information. Fasten the mount to the mounting surface. Refer to the instruction...

Page 8 - Preinstalación; Español

8 C2478M-B-ML (2/05) Preinstalación Español 1 Afloje la V-band que rodea la caja posterior y deje que cuelgue hacia el lateral. 2 Prepare el domo inferior para la instalación: a. Quite la junta O-ring del domo inferior. b. Aplique sobre la junta O-ring una pequeña cantidad de lubricante para O-rings...

Other Pelco Models

All Pelco Other