Cisco N55M4Q - Manual

Cisco N55M4Q

Cisco N55M4Q – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
Page: / 36

Table of Contents:

  • Page 3 – Installation Guidelines; Before installing the switch, these guidelines must be met:
  • Page 4 – “SFP Module; Equipment That You Supply; Powering the Switch
  • Page 5 – Note; Verifying Switch Operation; “Mounting the Switch” section on; Mounting the Switch; On a Desk or Shelf (without Mounting Screws)
  • Page 7 – Installing the Mounting Screws on Top of a Desk or a Shelf; Remove the screw template from the desk or shelf.
  • Page 8 – Mounting the Switch on Top of a Desk or Shelf; “After Installing the Switch” section on page 2-31
  • Page 9 – Installing the Mounting Screws Under a Desk or Shelf; Remove the screw template from underneath the desk or shelf.
  • Page 10 – Mounting the Switch Under a Desk or Shelf
  • Page 11 – Location of the Mounting Holes on the Switch; Switch
  • Page 12 – Installing the Mounting Screws on the Wall
  • Page 13 – With a Mounting Tray; Mounting Tray with Screws; Caution; Attaching the Tray to the Desk or Shelf
  • Page 14 – Installing the Switch on the Mounting Tray
  • Page 15 – Securing the Mounting Tray to the Switch; Warning; Mounting Tray with a Magnet
  • Page 16 – Place the switch on the mounting tray. See; Placing the Switch on the Mounting Tray; the magnet and switch on a metal wall.
  • Page 17 – Wall-Mounting with a Magnet
  • Page 18 – In a Rack; Attaching Brackets to the Switch, page 2-18; Attaching Brackets to the Switch; attach the second bracket to the opposite side.; Attaching the 19-inch Brackets for Rack-Mounting
  • Page 19 – Attaching the 23-inch Brackets for Rack-Mounting; Mounting the Switch in a Rack
  • Page 20 – On a DIN Rail; DIN rail mount; Attaching the DIN-Mount Tray to the Switch; Place the switch on the DIN rail mount. See; Placing the Switch on the DIN-Mount Tray
  • Page 21 – Securing the DIN-Mount Tray to the Switch; Mounting the Switch on a DIN Rail
  • Page 22 – After you install the switch, see the
  • Page 23 – Removing the Switch from a DIN Rail; Switch Removal
  • Page 24 – Installing a Cover for the Reset Button (Optional); Reset Cover on the Catalyst 2960CPD-8PT-L Switch
  • Page 25 – Installing the Power Cord Retainer (Optional); Inserting the Retainer through the Lanced Loop; AC power cord
  • Page 26 – Sliding the Retainer Through the Latch
  • Page 27 – Sleeve Around the Power Cord; Secure the AC power cord by pressing on the retainer. See; Securing the Power Cord in the Retainer; Sleeve for thin power cords
  • Page 28 – Using the Washer; Washer
  • Page 29 – Attaching the Cable Guard to the Switch; Attach the cables to the switch. See; Cable guard
  • Page 30 – Attaching the Cables to the Switch
  • Page 31 – Securing the Cable Guard to the Desk; After Installing the Switch; “Verifying Switch Operation” section on page 2-5; Installing SFP Modules
  • Page 32 – Installing an SFP Module; Removing SFP Modules; Insert a dust plug into the optical ports of the SFP module.
  • Page 33 – Removing a Bale-Clasp Latch SFP Module; Connecting Devices to the Ethernet Ports; If auto-MDIX is disabled, use the guidelines in
  • Page 34 – Connecting to an Ethernet Port; Connecting to the PoE Ports; Device
  • Page 35 – Where to Go Next; “Management Options”
Loading the manual

C H A P T E R

2-1

Catalyst 3560-C and 2960-C Switch Hardware Installation Guide

OL-23803-02

2

Switch Installation

This chapter describes how to start your switch and how to interpret the power-on self-test (POST) that
ensures proper operation. It also describes how to install the switch.

Read the topics and perform the procedures in this order:

Preparing for Installation, page 2-1

Verifying Switch Operation, page 2-5

Mounting the Switch, page 2-5

Installing a Cover for the Reset Button (Optional), page 2-24

Installing the Power Cord Retainer (Optional), page 2-25

Installing the Cable Guard (Optional), page 2-28

Connecting Devices to the Ethernet Ports, page 2-33

Preparing for Installation

Warnings, page 2-1

Installation Guidelines, page 2-3

Equipment That You Supply, page 2-4

Box Contents, page 2-4

Powering the Switch, page 2-4

Warnings

These warnings are translated into several languages in the

Regulatory Compliance and Safety

Information for the Catalyst 3560-C and the 2960-C Switches

guide.

Warning

Before working on equipment that is connected to power lines, remove jewelry (including rings,
necklaces, and watches). Metal objects will heat up when connected to power and ground and can
cause serious burns or weld the metal object to the terminals.

Statement 43

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 3 - Installation Guidelines; Before installing the switch, these guidelines must be met:

2-3 Catalyst 3560-C and 2960-C Switch Hardware Installation Guide OL-23803-02 Chapter 2 Switch Installation Preparing for Installation Warning For connections outside the building where the equipment is installed, the following ports must be connected through an approved network termination unit wit...

Page 4 - “SFP Module; Equipment That You Supply; Powering the Switch

2-4 Catalyst 3560-C and 2960-C Switch Hardware Installation Guide OL-23803-02 Chapter 2 Switch Installation Powering the Switch • Temperature around the unit does not exceed 113°F (45°C). If the switch is installed in a closed environment or in a multirack assembly, the temperature around it might b...

Page 5 - Note; Verifying Switch Operation; “Mounting the Switch” section on; Mounting the Switch; On a Desk or Shelf (without Mounting Screws)

2-5 Catalyst 3560-C and 2960-C Switch Hardware Installation Guide OL-23803-02 Chapter 2 Switch Installation Verifying Switch Operation Note You can use both the uplink port and the auxiliary power adapter. However, the auxiliary power input takes precedence. Catalyst 3560CPD-8PT-S • Connect a 10/100...

Other Cisco Models

All Cisco Other