Cisco N55M4Q - Manuals

Cisco N55M4Q – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36

Summary

Page 3 - Installation Guidelines; Before installing the switch, these guidelines must be met:

2-3 Catalyst 3560-C and 2960-C Switch Hardware Installation Guide OL-23803-02 Chapter 2 Switch Installation Preparing for Installation Warning For connections outside the building where the equipment is installed, the following ports must be connected through an approved network termination unit wit...

Page 4 - “SFP Module; Equipment That You Supply; Powering the Switch

2-4 Catalyst 3560-C and 2960-C Switch Hardware Installation Guide OL-23803-02 Chapter 2 Switch Installation Powering the Switch • Temperature around the unit does not exceed 113°F (45°C). If the switch is installed in a closed environment or in a multirack assembly, the temperature around it might b...

Page 5 - Note; Verifying Switch Operation; “Mounting the Switch” section on; Mounting the Switch; On a Desk or Shelf (without Mounting Screws)

2-5 Catalyst 3560-C and 2960-C Switch Hardware Installation Guide OL-23803-02 Chapter 2 Switch Installation Verifying Switch Operation Note You can use both the uplink port and the auxiliary power adapter. However, the auxiliary power input takes precedence. Catalyst 3560CPD-8PT-S • Connect a 10/100...

Cisco Manuals