Page 2 - ii
REVISION HISTORY Manual # Date Comments C467M 2/90 Original Version. C467M 3/90 Rev. A. “Scope” section expanded to include warnings. Updated modeland options section. Figure 5 Added. C467M 11/90 Rev. B. Addendum incorporated @ Figure 19 Exploded Assy Diagram.Wiring diagram changes added. Previous F...
Page 3 - prior to installation and operation.; Only use replacement parts recommended by Pelco.; literature accompanying this unit.; RISK OF ELECTRIC SHOCK.; CAUTION; This device is designed to operate at 24VAC power.
Pelco Manual C467M-D (5/95) 1 Please thoroughly familiarize yourself with the information in this manual prior to installation and operation. This symbol indicates that dangerous voltageconstituting a risk of electric shock is present within this unit. CAUTION : TO REDUCE THE RISK OF ELECTRICALSHOCK...
Page 4 - pan rotation, and a position feedback package for; CONDUCTOR AND CABLE; The following are the cable require-; WIRING INSTRUCTIONS
2 Pelco Manual C467M-D (5/95) 2.0 SCOPE The information contained within this manual coversthe SB19/SB1900 Series of Discreet Surveillance En-closures. 3.0 DESCRIPTION The SB19 is a low profile, hemisphere, discreet sur-veillance dome for CCD type cameras designed for easeof installation, relocation...
Page 5 - SB1900 Series Wiring Diagram
Pelco Manual C467M-D (5/95) 3 Figure 1. SB1900 Series Wiring Diagram
Page 6 - When installing the enclo-
4 Pelco Manual C467M-D (5/95) 4.3 MOUNTING INSTRUCTIONS Determine the type of mounting desired. The enclo-sure can be mounted in a hard ceiling, completely re-place a standard 2' x 2' suspended ceiling tile using theAPSB19 optional faceplate, or be inserted through acut-out in a standard 2' x 2' sus...
Page 9 - Replacement Mounting
Pelco Manual C467M-D (5/95) 7 4.3.1.2 Suspended Ceiling Tile Replacement Mounting To mount the enclosure into a suspended ceiling gridwhere the tile is replaced, perform the following steps. 1. Determine the location for mounting the enclosureand remove the appropriate ceiling tile. IMPORTANT: When ...
Page 11 - CONNECTOR ASSEMBLY; Limit Stop Locations
Pelco Manual C467M-D (5/95) 9 12. Attach the faceplate trim to the back box by align- ing the two serrated studs with two of the holes inthe edges of the back box and engaging the studs. 13. Operate the pan/tilt to verify that there are no ob- structions or dragging cables within the back boxor dome...
Page 12 - CARE AND MAINTENANCE; The lower dome of the en-
10 Pelco Manual C467M-D (5/95) 5.0 CARE AND MAINTENANCE Regularly scheduled maintenance will prolong the op-erational life and appearance of the equipment. IMPORTANT: The lower dome of the en- closure is an optical surface. When cleaning theinner surface of the dome and viewing window,treat as caref...
Page 13 - EXPLODED ASSEMBLY DIAGRAM; SB19 Exploded Assembly Diagram
Pelco Manual C467M-D (5/95) 11 6.0 EXPLODED ASSEMBLY DIAGRAM Refer to Figure 7 for an exploded assembly diagram of the SB19 enclosure. Figure 7. SB19 Exploded Assembly Diagram PP ONLYNON SL ONLY * ** EXPASB1900EXPASB1900PP
Page 14 - EXPLODED ASSEMBLY MECHANICAL PARTS LIST
12 Pelco Manual C467M-D (5/95) 7.0 EXPLODED ASSEMBLY MECHANICAL PARTS LIST Item Qty Description Pelco Part Number 1 1 UL, Pad, camera, black .062" thick EH200010004 2 1 PCB assembly, pan/tilt PCB3000100ASSY 3 1 Bushing, 3/8" tilt shaft PT180010001 4 1 Shaft, tilt table PT18004002COMP 5 1 Spr...
Page 16 - continuous; RECOMMENDED CONTROLS
14 Pelco Manual C467M-D (5/95) 8.0 MODELS DD1900 Dome drive unit for SB1900. (UL) DD1900-PP Dome drive unit for SB1900-PP. DD1900-SL Dome drive unit for SB1900-SL.(UL) DD1900SL-PP Dome drive unit for SB1900SL-PP. SB19 Drop ceiling discreet surveillanceenclosure with black opaque lowerdome with less ...
Page 17 - MECHANICAL
Pelco Manual C467M-D (5/95) 15 9.2 MODELS SB1900, SB1900-SL, SB1900-PP AND SB1900SL-PP CM7500 Series Coaxitron Matrix Switcher/ControlSystem rack mount card cage withCPU and power supply. Capable ofup to 64 inputs and up to 4 monitoroutputs. (See C584 product specifi-cation sheet for details). CM850...
Page 18 - SB19 Dimension Drawing
16 Pelco Manual C467M-D (5/95) Pan Speed: 24 ° /sec ± 1 ° Tilt: -90 ° movement from horizontal plane Tilt Speed: 12 ° /sec ± .5 ° Maximum Load: 10 lbs (4.6 kg) Gearing: Chain drive Bearings: Pan Heavy duty ball bearing and Oilitebronze bushing Tilt Oilite bronze bushing Braking: Friction ELECTRICAL ...
Page 20 - Pelco
18 Pelco Manual C467M-D (5/95) Pelco 3500 Pelco Way • Clovis, CA 93612-5699 (559) 292-1981 • (800) 289-9100 FAX (800) 289-9150 or (559) 292-3827 International customers call 1-559-292-1981 or FAX 1-559-348-1120 (Product specifications subject to change without notice.)