Pelco MPT115DT - Manuals

Pelco MPT115DT – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8

Summary

Page 3 - CONNECTOR ASSEMBLY; Contacts cannot be removed from the

Pelco Manual C520M Rev B (6/92) 3 4.0 INSTALLATION 4.1 CONNECTOR ASSEMBLY Installation and/or testing will require you to assemblethe connector parts provided. Fabricate the intercon-necting cable according to the following steps (refer-ence Figure 1). 1. Slide part A of the cable clamp (item 1) ove...

Page 4 - Wiring Diagram

4 Pelco Manual C520M Rev B (6/92) Figure 2. Wiring Diagram FRONT VIEW CONTROL 14-PINPLUG 9-PINPLUG FRONT VIEW 1 3 5 6 7 8 9 1 3 5 6 7 8 14 P/T COMMON LEFT DOWN UP RIGHT SAFETY GROUND PAN/TILT 1 2 3 4 5 6 7 8 9 1 2 3 7 6 5 4 8 9 10 11 12 13 14

Page 5 - When a pan limit is reached, scan direction is

Pelco Manual C520M Rev B (6/92) 5 5.0 OPERATION AND SYSTEM TEST 5.1 MANUAL OPERATION TEST After installing the interconnecting cable between thepan/tilt and control, plug the control into the AC outlet,turn control on, and test operation using the followingprocedures: 1. Move the joystick to the UP ...

Pelco Manuals