Page 2 - Proprietary Notice and Liability Disclaimer; Trademarks; trademarks of their respective trademark owners.
Proprietary Notice and Liability Disclaimer The information disclosed in this document, including all designs and related materials, isthe valuable property of NEC Solutions (America), Inc. and/or its licensors. NEC Solutions(America), Inc. and/or its licensors, as appropriate, reserve all patent, c...
Page 3 - Contents iii; Contents
Contents iii Contents Introduction ........................................................................................................................... 1 Symbols and Conventions ..................................................................................................... 1 Safety Noti...
Page 5 - WARNING; Note
Express5800/1160Xd/1320Xd Installation Procedures 1 Introduction These installation procedures provide information for unpacking and installingthe Express5800/1160Xd/1320Xd Server. Read these procedures in theirentirety before performing the installation to become familiar with thecomponents and the...
Page 6 - Safety Notices
2 Express5800/1160Xd/1320Xd Installation Procedures Safety Notices ! WARNING To avoid a risk of injuries, installation should be performed by trainedtechnical personnel. It takes at least two people to unpack your server and two people tomaneuver the server, after unpacking. Your server is equipped ...
Page 7 - If you Need Help; Contact NEC Technical Support at; Selecting a Site
Express5800/1160Xd/1320Xd Installation Procedures 3 Safety Notices for Users Outside of the U.S.A. and Canada ! PELV (Protected Extra-Low Voltage) Integrity: To ensure the extra- low voltage integrity of the equipment, connect only equipment withmains-protected electrically-compatible circuits to th...
Page 8 - Unpacking the Server; CAUTION
4 Express5800/1160Xd/1320Xd Installation Procedures ! Clean, dust-free, and well ventilated. Front and rear and top ventilatingopenings kept free of obstructions. Away from sources of heat, vibrationor physical shock. ! Isolated from strong electromagnetic fields and electrical noise producedby elec...
Page 9 - Server Stabilizer Kit; Figure 1. Shipping Container; Unpacking Procedure; WARNINGS
Express5800/1160Xd/1320Xd Installation Procedures 5 Figure 1 shows the Model 1160Xd/1320Xd shipping container. The smallercontainer (not shown) includes the following contents: ! Server Stabilizer Kit ! Accessory Box. Figure 1. Shipping Container Unpacking Procedure Note: It is recommended that you ...
Page 10 - Figure 2. Shipping Container Plastic Straps; Lifting upwards, remove the top shipping cover. See Figure 3A.; Figure 3. Removing the Cardboard Covers
6 Express5800/1160Xd/1320Xd Installation Procedures A A Plastic Straps Figure 2. Shipping Container Plastic Straps 3. Lifting upwards, remove the top shipping cover. See Figure 3A. 4. Release the Velcro tapes that secure the front, rear, and side covers of theshipping box. See Figure 3B. 5. Remove t...
Page 11 - Figure 4. Removing the Corner and Top Protectors; Remove the unloading ramp and set it aside. See Figure 5A.; Figure 5. Removing the Unloading Ramp
Express5800/1160Xd/1320Xd Installation Procedures 7 6. Cut the strap or tape securing the corrugated cardboard end pieces protectingthe corners of the server. Remove the four corner protectors and set themaside. Note the positions of the corner protectors that are marked FR (frontright), FL (front l...
Page 12 - Figure 6. Removing the Cardboard Covers
8 Express5800/1160Xd/1320Xd Installation Procedures 11. Four Styrofoam stoppers prevent the server from moving during shipment.Wing nuts secure Styrofoam stoppers, located on both sides of the server aswell as the front and rear of the server, to the shipping pallet. Remove thefour wing nuts and rem...
Page 13 - Figure 8. Rolling the Server Down the Ramp
Express5800/1160Xd/1320Xd Installation Procedures 9 ! WARNING The server weighs approximately 926.0 pounds (420.0Kg). Ifthe server contains optional equipment, it will weigh more.To avoid personal injury, make sure you have anotherperson help you unpack the server and two other personshelp you move ...
Page 14 - Figure 9. Lowering the Leveling Pads
10 Express5800/1160Xd/1320Xd Installation Procedures 18. Once the server is located in its designated position, using an adjustablewrench, lower the leveling pads to secure the server in place.See Figure 9A. A A Leveling Pad Figure 9. Lowering the Leveling Pads 20. At the front of the system. Remove...
Page 15 - Installing the Side Stabilizer Kit; Position a stabilizer bracket on each side of the cabinet.; Figure 11. Installing the Side Stabilizers
Express5800/1160Xd/1320Xd Installation Procedures 11 Installing the Side Stabilizer Kit Note : The Side Stabilizer Kit is included in the Accessory box. 1. Position a stabilizer bracket on each side of the cabinet. 2. Secure each stabilizer bracket to the cabinet with three M4 screws provided.See Fi...
Page 16 - Attaching the Power Cables; Open the rear door of the server and remove any shipping tape.; Figure 12. Attaching the Power Cables; Attaching the LAN Cables
12 Express5800/1160Xd/1320Xd Installation Procedures Attaching the Power Cables 1. Open the rear door of the server and remove any shipping tape. 2. Route the AC cables (customer supplied) under the server and connect themto the AC receptacles. See Figure 12A. A A AC Receptacles Figure 12. Attaching...
Page 18 - Figure 15. Locating the Service Processor Board ETHER Connector
14 Express5800/1160Xd/1320Xd Installation Procedures A ETHER Connector Figure 15. Locating the Service Processor Board ETHER Connector A