Page 3 - Thank you for purchasing the ADAM PTS 2000.; CONTENT
3 Adam Equipment 2010 © Thank you for purchasing the ADAM PTS 2000. For your safety and correct operation, please read the following instructions carefully before using it. CONTENT 1.0 INSTRUCTION ..........................................................................................................
Page 4 - SAFETY; This pallet truck must be operated by trained personnel only.
4 Adam Equipment 2010 © SAFETY • To prevent damage to the scale, please read these operating instructions thoroughly. • When using the pallet truck, please keep the handle in the DRIVE position. • This pallet truck must be operated by trained personnel only. • Check the pallet truck first before usi...
Page 5 - INSTRUCTION; PECIFICATION; Common specifications; ACKING; Spring
5 Adam Equipment 2010 © 1.0 INSTRUCTION 1.1 S PECIFICATION Common specifications Model PTS 2000 Load cell Capacity 2000 kg Resolution 0.5 kg Fork length 1150mm Fork Width (each) 160mm Fork Width (total) 550mm Fork Height 80mm increasing to 195mm Net Weight 110k See the User Manual for the Indicator ...
Page 7 - INSTALLATION; installed following the instructions below:
7 Adam Equipment 2010 © 2.0 INSTALLATION Please follow the installation instructions to ensure correct operation of your PTS. In transportation the handle is removed from the truck, this needs to be installed following the instructions below: 1) Insert the roller pin into the hole of roller rack, se...
Page 9 - AE; Rear view of AE 402 Indicator; pin connector
9 Adam Equipment 2010 © 2.1 AE 402 ASSEMBLY Rear view of AE 402 Indicator Fit the PTS to Indicator cable as shown in the picture below: 5 pin connector fitted here
Page 10 - Indicator using the 7 pin connector.; M4 x 6 Screws
10 Adam Equipment 2010 © The Indicator bracket is fitted to the PTS using 4 x M4 screws as the picture below shows, these should be tightened using the Allen Key supplied . The Indicator cable goes through the hole on the bracket and connects to the Indicator using the 7 pin connector. M4 x 6 Screws...
Page 11 - the two plastic fasteners as shown below:; Plastic fasteners used to
11 Adam Equipment 2010 © The AE 402 indicator is placed into the mounting bracket, and secured using the two plastic fasteners as shown below: Plastic fasteners used to secure Indicator to the bracket.
Page 12 - GK; the bracket using the 4 x M4 screws.; GK mounting plate
12 Adam Equipment 2010 © 2.2 GK INDICATOR ASSEMBLY (USA ONLY) The GK mounting plate is fitted into the runners on the bottom of the GK The display cable is fitted into the GK and the fixing screws are tightened. Using the Allen key attached inside the packing box, secure the GK indicator to the brac...
Page 13 - and the 4 x M4 screws tightened by an Allen key; CALIBRATION; supplied (AE 402 or GK) when further calibration when required.; M4 x 6 screws
13 Adam Equipment 2010 © The 5 pin end of display cable is fitted into the 5 pin connector on the truck and the locking ring is tightened. The bracket should then be fitted to the truck and the 4 x M4 screws tightened by an Allen key 3.0 CALIBRATION The PTS is factory calibrated, please refer to the...
Page 14 - several times to allow air to escape.
14 Adam Equipment 2010 © 4.0 TROUBLEINGSHOOTING No. Problem Cause Solution 1 Forks cannot ascend to the maximum height Inadequate hydraulic oil. Refill oil chamber. 2 Forks can not be raised No hydraulic oil. Dirty oil. Fork bolts too close or screws too tight so that the valve remains open. There i...
Page 16 - ADAM EQUIPMENT
Adam Equipment 2010 © ADAM EQUIPMENT is an ISO 9001:2008 certified global organisation with more than 30 years experience in the production and sale of electronic weighing equipment. Products are sold through a world wide distributor network supported from our company locations in the UK, USA, SOUTH...