Adam Equipment 9618 Revision D - Manual

Adam Equipment 9618 Revision D

Adam Equipment 9618 Revision D – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
57 Page 57
58 Page 58
59 Page 59
60 Page 60
61 Page 61
62 Page 62
63 Page 63
64 Page 64
65 Page 65
66 Page 66
67 Page 67
68 Page 68
69 Page 69
70 Page 70
71 Page 71
72 Page 72
73 Page 73
74 Page 74
75 Page 75
76 Page 76
77 Page 77
78 Page 78
79 Page 79
80 Page 80
81 Page 81
82 Page 82
83 Page 83
84 Page 84
85 Page 85
Page: / 85

Table of Contents:

  • Page 5 – INTRODUCTION
  • Page 7 – UP; AND
  • Page 8 – THE
  • Page 9 – LEVELLING THE ANALYZER
  • Page 10 – LOCATING AND PROTECTING YOUR ANALYZER
  • Page 11 – is identical to your local voltage.
  • Page 12 – All repairs must be done by a trained technician. There are no user; HOT SURFACES; During test the cover of the heating chamber can become very hot,; MATERIALS
  • Page 13 – suitable fume hoods or with other ventilation.
  • Page 15 – KEYPAD; Zero
  • Page 16 – Keys; or
  • Page 17 – NUMERIC ENTRY METHOD
  • Page 18 – PANEL; POWER
  • Page 19 – LOCK
  • Page 20 – OPERATION; OF
  • Page 21 – Heat Control; Single temperature, heat to a set temperature.; Interval
  • Page 22 – Start Criteria
  • Page 23 – PROCEDURE; result; Keat
  • Page 25 – INTERVAL; ON; rapid; USER; rapid; TIME
  • Page 27 – to return to normal weighing; start; PRINT TEST; SUMM
  • Page 28 – key will cause the current
  • Page 29 – STORE
  • Page 30 – TEST
  • Page 33 – PST
  • Page 34 – Text message
  • Page 35 – to zero the weight.
  • Page 37 – SOLID
  • Page 38 – START MASS; ST0RED
  • Page 39 – FINAL
  • Page 42 – RESULTS; key to change the display to select; RESULT ST; RESULT ST; USB
  • Page 43 – STORE OK; CONFIG LD
  • Page 44 – MENUS; to control unauthorised access to the menu system.; SUPERVISOR MENUS; key while in normal weighing gives access to the
  • Page 46 – bold
  • Page 50 – . The analyzer will calibrate to
  • Page 51 – to enter the lower temperature value.
  • Page 52 – to enter the
  • Page 53 – REPORT
  • Page 56 – CONFIG1; LOAD
  • Page 58 – INTERFACE; USB SERIAL HARDWARE
  • Page 59 – INPUT COMMANDS; Basic Input Commands:
  • Page 60 – A typical test report will look as:
  • Page 61 – Print
  • Page 62 – CONFIGURATION
  • Page 63 – ANALYZER SETUP PARAMETERS
  • Page 65 – OUTPUT
  • Page 66 – SPECIFICATIONS & FEATURES; Readability
  • Page 69 – STRUCTURE; WEIGHING
  • Page 75 – PREPARATION
  • Page 76 – KNOW THE MATERIAL
  • Page 77 – NOTES
  • Page 82 – WARRANTY
  • Page 84 – Manufacturer’s Declaration of Conformity
  • Page 85 – ADAM EQUIPMENT
Loading the manual

© Adam Equipment Company 2009

Adam Equipment



PMB Moisture Analyzer




(P.N. 9618, Revision D, June 2009)




Software revisions V1.27 and up





"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 5 - INTRODUCTION

    3 | P a g e © Adam Equipment Company 2009 2.0   INTRODUCTION   Thank you for selecting the PMB Moisture Analyzer. This Instruction Manual will familiarize you with the installation, accessories, trouble-shooting, after sales service information, general maintenance of the analyzer, etc. and will...

Page 7 - UP; AND

    5 | P a g e © Adam Equipment Company 2009 3.0 SET UP 3.1 UNPACKING AND SETTING UP YOUR ANALYZER Remove the analyzer from the packing by carefully lifting it out of the box. Inside the box you will find everything needed to start using the analyzer- 9 AC power cable 9 Pan Support 9 Stainless Stee...

Page 8 - THE

    6 | P a g e © Adam Equipment Company 2009 3.2 ASSEMBLING THE ANALYZER For best performance, let the analyzer warm up for 30 minutes before using. z Locate the analyzer on a solid surface, free from vibration with good ventilation around it. z Place the lower reflector (1) into the base of the we...

Other Adam Equipment Models

All Adam Equipment Other