Page 2 - Operation and Installation Guide | Trademarks; Trademarks; Fire; Burglary; UL
D9412GV2/D7412GV2 | Operation and Installation Guide | Trademarks 2 Bosch Security Systems, Inc. | 5/05 | F01U003641B Trademarks CoBox is a registered trademark of Lantronix ® . Windows ® is a registered trademark of Microsoft Corporation in the United States or in other countries. Molex ® is a re...
Page 4 - Operation and Installation Guide | Contents; Contents
D9412GV2/D7412GV2 | Operation and Installation Guide | Contents 4 Bosch Security Systems, Inc. | 5/05 | F01U003641B Contents 1.0 Introduction ....................................................... 7 2.0 Lightning Strikes .............................................. 8 2.1 Effects ....................
Page 5 - Operation and Installation Guide |
D9412GV2/D7412GV2 | Operation and Installation Guide | . Bosch Security Systems, Inc. | 5/05 | F01U003641B 5 8.5 Wiring Information for Installations Using the Ademco AB-12 Bell/Housing........ 32 9.0 Off-Board Points ............................................. 34 9.1 Point (Zonex) Bus: D9412GV2 T...
Page 6 - Operation and Installation Guide | 1.0 Introduction; Figures; Ground Fault Impedance Specifications 17
D9412GV2/D7412GV2 | Operation and Installation Guide | 1.0 Introduction 6 Bosch Security Systems, Inc. | 5/05 | F01U003641B Figures Figure 1: System Configuration ................................. 9 Figure 2: Enclosure Mounting .................................. 15 Figure 3: Ground Fault Detection ....
Page 7 - Name of Documentation
D9412GV2/D7412GV2 | Operation and Installation Guide | Tables . Bosch Security Systems, Inc. | 5/05 | F01U003641B 7 1.0 Introduction This manual addresses the operation and installation of the D9412GV2 and D7412GV2 Control Panels. Throughout this guide, the words “control panel” refer to both contro...
Page 8 - Operation and Installation Guide | 2.0 Lightning Strikes; Lightning Strikes; Precautions during Installation; Do not run wiring outside the building.
D9412GV2/D7412GV2 | Operation and Installation Guide | 2.0 Lightning Strikes 8 Bosch Security Systems, Inc. | 5/05 | F01U003641B 2.0 Lightning Strikes The control panels are designed to significantly reduce electromagnetic interference and malfunction generally caused by lightning. 2.1 Effects Any e...
Page 9 - Operation and Installation Guide | 3.0 Overview; Configuration and Parts; System Configuration; GV2 Series Control Panel Differences; Features
D9412GV2/D7412GV2 | Operation and Installation Guide | 3.0 Overview . Bosch Security Systems, Inc. | 5/05 | F01U003641B 9 3.0 Overview 3.1 Configuration and Parts Figure 1: System Configuration Use keypads or keyswitches to arm the controlpanel by area. Each control panel can have up to eightareas. ...
Page 11 - Model Title
D9412GV2/D7412GV2 | Operation and Installation Guide | 3.0 Overview . Bosch Security Systems, Inc. | 5/05 | F01U003641B 11 3.2 Accessories Refer to the Bosch Security Systems product catalog for additional information. Table 3: Compatible Accessories Model Title Model Title D122/D122L Dual Battery H...
Page 13 - Model Display
D9412GV2/D7412GV2 | Operation and Installation Guide | 3.0 Overview . Bosch Security Systems, Inc. | 5/05 | F01U003641B 13 The system can route groups of Event Reports to four different destinations. Each report group can be programmed to send reports to one or more destinations. Primary and backup ...
Page 15 - Operation and Installation Guide | 4.0 Installation; Preparation; Run the necessary wiring throughout the premises.
D9412GV2/D7412GV2 | Operation and Installation Guide | 4.0 Installation . Bosch Security Systems, Inc. | 5/05 | F01U003641B 15 4.0 Installation 4.1 Installation Preparation This section contains a general installation procedure and refers to other sections of the document for detailed instructions. ...
Page 16 - Installing the Control Panel; Place the control panel over the inside back of the; Connecting Earth Ground; Do not use; - With S4 closed, control panel detects ground
D9412GV2/D7412GV2 | Operation and Installation Guide | 4.0 Installation 16 Bosch Security Systems, Inc. | 5/05 | F01U003641B 4.4 Installing the Control Panel 1. Place the control panel over the inside back of the enclosure, aligning the large rectangular openings of the mounting skirt with the mount...
Page 17 - Switch S4; Locking the Reset Pin
D9412GV2/D7412GV2 | Operation and Installation Guide | 4.0 Installation . Bosch Security Systems, Inc. | 5/05 | F01U003641B 17 4.5.3 Enabling Ground Fault Detection To configure the D9412GV2 and D7412GV2 Control Panels to enable ground fault detection: 1. Set the silent relay in Area 5 to any value ...
Page 18 - Completing the Installation; Charging the Battery
D9412GV2/D7412GV2 | Operation and Installation Guide | 4.0 Installation 18 Bosch Security Systems, Inc. | 5/05 | F01U003641B 4.6 Completing the Installation If not already complete, make the earth ground connection to Terminal 10 and lock the reset pin in the closed position. 4.6.1 Charging the Batt...
Page 19 - Programming the Control Panel; To clear the event memory and
D9412GV2/D7412GV2 | Operation and Installation Guide | 4.0 Installation . Bosch Security Systems, Inc. | 5/05 | F01U003641B 19 4.7 Programming the Control Panel If the control panel is not already programmed, review the D9412GV2/D7412GV2 Program Entry Guide (P/N: F01U003636). Ensure that all accesso...
Page 20 - Operation and Installation Guide | 5.0 Power Supply; Supply; Primary Power Terminals 1 and 2; AC Power Failure; Secondary Power Terminals; To increase
D9412GV2/D7412GV2 | Operation and Installation Guide | 5.0 Power Supply 20 Bosch Security Systems, Inc. | 5/05 | F01U003641B 5.0 Power Supply 5.1 Primary Power Terminals 1 and 2 5.1.1 Primary (AC) Power Circuit The primary source is a 16.5 VAC, 40 VA, internally-fused transformer (Bosch Security Sys...
Page 22 - - Conduit, required only if external batteries are
D9412GV2/D7412GV2 | Operation and Installation Guide | 5.0 Power Supply 22 Bosch Security Systems, Inc. | 5/05 | F01U003641B Figure 5: Non-Power-Limited Wiring EARTH GROUND COMMON BATTERY NEGATI Maximum Charging Current 1.4 Amps. BATTERY POSITIVE ONLY RELAY A RELAY B RELAY C + AUX PROGRAMMABLEALARM ...
Page 23 - Investigate Low Battery reports immediately:; Discharge Cycle
D9412GV2/D7412GV2 | Operation and Installation Guide | 5.0 Power Supply . Bosch Security Systems, Inc. | 5/05 | F01U003641B 23 5.2.4 Battery Supervision When battery voltage drops to 13.8 VDC, the yellow Charging Status LED illuminates. When the battery voltage drops to 12 VDC to 11.8 VDC, the red L...
Page 24 - LED
D9412GV2/D7412GV2 | Operation and Installation Guide | 5.0 Power Supply 24 Bosch Security Systems, Inc. | 5/05 | F01U003641B Table 8: Charging Status and Low Battery LEDs LED Type Color State Action Charging Status LED Yellow Shows the changing status of the battery. Refer to Figure 6 on page 23 for...
Page 25 - Operation and Installation Guide | 6.0 Power Outputs; Outputs; Protection; BATTERY LOW; Total Available Power
D9412GV2/D7412GV2 | Operation and Installation Guide | 6.0 Power Outputs . Bosch Security Systems, Inc. | 5/05 | F01U003641B 25 6.0 Power Outputs 6.1 Circuit Protection Three Positive Temperature Coefficients (PTCs) protect the control panel from short circuits on the continuous and programmable pow...
Page 26 - NSC current required; Terminal 8
D9412GV2/D7412GV2 | Operation and Installation Guide | 6.0 Power Outputs 26 Bosch Security Systems, Inc. | 5/05 | F01U003641B 6.4.2 Terminals 6 and 7 When activated, Terminals 6 (Relay A) and 7 (Relay B), provide positive (+) 10.2 VDC to 13.9 VDC power output. Use the power at Terminals 6 and 7 to p...
Page 27 - Operation and Installation Guide | 7.0 Telephone Connections; Connections; Ringer equivalence for the control panel: 0.4B; Telephone Cord Connection; Phone Connector, Phone LED, and Operation Monitor LED Locations; - Telephone cord connector
D9412GV2/D7412GV2 | Operation and Installation Guide | 7.0 Telephone Connections . Bosch Security Systems, Inc. | 5/05 | F01U003641B 27 7.0 Telephone Connections 7.1 Registration The Bosch Security Systems D9412GV2/D7412GV2 Control Panels are registered with the Federal Communication Commission (FCC...
Page 28 - Format; Bad Line Might Test OK:; Called Party Disconnect; COMM
D9412GV2/D7412GV2 | Operation and Installation Guide | 7.0 Telephone Connections 28 Bosch Security Systems, Inc. | 5/05 | F01U003641B 7.5 Phone LED (Red) The red Phone LED illuminates when the control panel seizes the telephone line and remains illuminated until the control panel returns the telepho...
Page 29 - Two Phone Lines; Yes; Primary; Comm Fail
D9412GV2/D7412GV2 | Operation and Installation Guide | 7.0 Telephone Connections . Bosch Security Systems, Inc. | 5/05 | F01U003641B 29 7.11 D928 Dual Phone Line Switcher 7.11.1 Description The optional D928 Dual Phone Line Switcher allows the control panel to send reports over two separate telephon...
Page 30 - Phone Cord; Reference source not found.; for phone cord
D9412GV2/D7412GV2 | Operation and Installation Guide | 7.0 Telephone Connections 30 Bosch Security Systems, Inc. | 5/05 | F01U003641B 7.11.3 Installing the D928 Mounting Mount the D928 on the lower right side of the enclosure using the screws provided with the switcher. Wiring The D928 has two flyin...
Page 31 - resistor at the far end of the sensor loop to; Parameters; EOL resistor in; Loop Voltage; Figure 10: On-board Point Sensor Loop Wiring
D9412GV2/D7412GV2 | Operation and Installation Guide | 8.0 On-Board Points . Bosch Security Systems, Inc. | 5/05 | F01U003641B 31 8.0 On-Board Points 8.1 Terminals 11 to 22 Description The control panel provides eight on-board points. Each point functions independently and does not interfere with th...
Page 32 - Point Response Time; Disconnect the wire jumper from Terminal 4 to the
D9412GV2/D7412GV2 | Operation and Installation Guide | 8.0 On-Board Points 32 Bosch Security Systems, Inc. | 5/05 | F01U003641B 8.4 Point Response Time The control panel scans both on-board and off-board point sensor loops every 300 ms. The Debounce program item in the Point Assignment section of th...
Page 33 - - Inner bell box lining
D9412GV2/D7412GV2 | Operation and Installation Guide | 8.0 On-Board Points . Bosch Security Systems, Inc. | 5/05 | F01U003641B 33 Figure 11: Wiring for Installation Using the Ademco AB-12 Bell/Housing 1 2 3 4 5 6 EARTH GROUND COMMON BATTERY NEGATIVE ONLY Maximum Charging Current 1.4 Amps. BATTERY PO...
Page 35 - Off-Board Point Errors; Error Condition; Listings
D9412GV2/D7412GV2 | Operation and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 5/05 | F01U003641B 35 Table 13: Off-Board Point Errors Error Condition Result Additional Information +/- leg of the data expansion bus has a short-circuit to earth ground, with Ground Fault D...
Page 36 - - Zone expansion loop
D9412GV2/D7412GV2 | Operation and Installation Guide | 9.0 Off-Board Points 36 Bosch Security Systems, Inc. | 5/05 | F01U003641B Figure 12: Connecting the D8125 POPEX to the D9412GV2 Control Panel Reset Pin Disable All Except Battery Charging And Programming PERIPHERAL DEVICE CONNECTIONS RED POWER +...
Page 38 - Installing the D8125 POPEX Module; Wiring the D8125 to the Control Panel; AWG
D9412GV2/D7412GV2 | Operation and Installation Guide | 9.0 Off-Board Points 38 Bosch Security Systems, Inc. | 5/05 | F01U003641B 9.3 Installing the D8125 POPEX Module For information on the Multiplex Bus Interface, refer to the D8125 Multiplex Bus Interface Operation and Installation Guide (P/N: 367...
Page 40 - Figure 14: Program Record Sheet; Labels
D9412GV2/D7412GV2 | Operation and Installation Guide | 9.0 Off-Board Points 40 Bosch Security Systems, Inc. | 5/05 | F01U003641B Figure 14: Program Record Sheet EN | 25 bold Point Assignments (001 through 040) POPIT Switch Setting Trans- lation Point # Point Index Area Assign Debounce BFSK/ Relay Cu...
Page 41 - Requirements for Fire Initiation Applications; connectors
D9412GV2/D7412GV2 | Operation and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 5/05 | F01U003641B 41 The D8128D is also suitable for fire supervisory applications, such as indicating circuit supervision (using the D192C/D192G Bell Circuit Supervision Module), sprinkler ...
Page 42 - Switch 5 Settings for Line Termination
D9412GV2/D7412GV2 | Operation and Installation Guide | 9.0 Off-Board Points 42 Bosch Security Systems, Inc. | 5/05 | F01U003641B Table 15: D8128D OctoPOPIT Switch Settings for D9412GV2 and D7412GV2 ZONEX 1 D8128D Address Switches ZONEX 2 Points 9 to 127 1 2 3 4 5 Points 129 to 247 9 to 16 ON ON ON O...
Page 44 - - First address on Zonex Bus 1
D9412GV2/D7412GV2 | Operation and Installation Guide | 9.0 Off-Board Points 44 Bosch Security Systems, Inc. | 5/05 | F01U003641B Figure 16: Connecting D8128D OctoPOPITs to the D9412GV2 Reset Pin Disable All Except Battery Charging And Programming PERIPHERAL DEVICE CONNECTIONS RED POWER + YELLOW DATA...
Page 45 - - First address on Zonex Bus 1
D9412GV2/D7412GV2 | Operation and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 5/05 | F01U003641B 45 Figure 17: Connecting D8128D OctoPOPITs to the D7412GV2 Pin Battery amming E CONNECTIONS POWER + DATA BUS A DATA BUS B COM MON ZONEX OUT 1 ZONEX IN 1 32 31 30 29 28 27 N...
Page 47 - Testing Off-Board Points; If the point assignment switches on a
D9412GV2/D7412GV2 | Operation and Installation Guide | 9.0 Off-Board Points . Bosch Security Systems, Inc. | 5/05 | F01U003641B 47 Figure 19: D8128D OctoPOPIT Sensor Loops COM IN OUT+12V P1 COM P2 P3 COM P4 P5 COM P6 P7 COM P8 1 2 3 4 5 1 - D8128D OctoPOPIT 2 - To control panel 3 - To additional Oct...
Page 48 - OctoRelay; D8129 Restricted for Fire Systems:; Connect OctoRelays in parallel.
D9412GV2/D7412GV2 | Operation and Installation Guide | 10.0 Off-Board Relays 48 Bosch Security Systems, Inc. | 5/05 | F01U003641B 10.0 Off-Board Relays 10.1 D8129 OctoRelay Use the D8129 OctoRelay to add relay outputs to the system in groups of eight. On the D9412GV2, up to 128 OctoRelay outputs (re...
Page 49 - Operation and Installation Guide | 10.0
D9412GV2/D7412GV2 | Operation and Installation Guide | 10.0 Off-Board Relays . Bosch Security Systems, Inc. | 5/05 | F01U003641B 49 Figure 21: D8129 Connections to the D7412GV2 Pin Battery amming E CONNECTIONS POWER + DATA BUS A DATA BUS B COMMON ZONEX OUT 1 ZONEX IN 1 32 31 30 29 28 27 NOT USED 26 ...
Page 51 - points
D9412GV2/D7412GV2 | Operation and Installation Guide | 10.0 Off-Board Relays . Bosch Security Systems, Inc. | 5/05 | F01U003641B 51 10.2.2 Installation Install the D811 in the enclosure with the control panel (Figure 22) or in an adjacent enclosure no more than 1.5 m (5 ft.) from the control panel. ...
Page 53 - Arming Devices; SDI FAILURE; Switch; Keypad Connections; Function
D9412GV2/D7412GV2 | Operation and Installation Guide | 11.0 Arming Devices . Bosch Security Systems, Inc. | 5/05 | F01U003641B 53 11.0 Arming Devices 11.1 Description Keypads, maintained or momentary contact keyswitches, or a combination of the two are used to arm and disarm areas. The control panel...
Page 55 - Maintained Contact
D9412GV2/D7412GV2 | Operation and Installation Guide | 11.0 Arming Devices . Bosch Security Systems, Inc. | 5/05 | F01U003641B 55 11.3 D268/D269 Independent Zone Control, D279A Independent Zone Control Any on-board or OctoPOPIT point can be programmed so that the D268/D269 or D279A Independent Zone ...
Page 57 - Devices; Settings; Printer Switch; Supervision includes:; Module
D9412GV2/D7412GV2 | Operation and Installation Guide | 12.0 SDI Devices . Bosch Security Systems, Inc. | 5/05 | F01U003641B 57 12.0 SDI Devices 12.1 Description D9412GV2 or D7412GV2 Control Panels can support a number of accessory devices from the SDI Bus using Terminals 29 through 32. Some devices ...
Page 58 - DIP Switch Settings
D9412GV2/D7412GV2 | Operation and Installation Guide | 12.0 SDI Devices 58 Bosch Security Systems, Inc. | 5/05 | F01U003641B 12.4.1 Access Using Wiegand style cards or tokens, the D9210B can allow access for up to 996 cards or tokens on the D9412GV2, and up to 396 on the D7412GV2. User access author...
Page 59 - - Address DIP switches
D9412GV2/D7412GV2 | Operation and Installation Guide | 12.0 SDI Devices . Bosch Security Systems, Inc. | 5/05 | F01U003641B 59 Figure 27: DX4020i DIP Switch Settings SER Rx Tx BUS Rx Tx LED ENABLE DB9 GND ENABLE P1 P6 P2 P3 1 2 4 8 16 32 64 128 ON 1 2 3 4 5 6 7 8 1 2 4 8 16 32 64 128 ON 1 2 3 4 5 6 ...
Page 60 - Switch is not used; - SDE Address 88 switch settings
D9412GV2/D7412GV2 | Operation and Installation Guide | 12.0 SDI Devices 60 Bosch Security Systems, Inc. | 5/05 | F01U003641B 12.6.3 Address Settings The DX4020 has specific DIP switch settings for SDI Address 88 when using the DX4020 for Remote Programming Software (RPS) or enhanced communications i...
Page 61 - Programmer and Accessory; Figure 30: Reset Pin; panel operation; Programmer Access Reports; Prog Access OK; Connector; Figure 31: Programmer and Accessory; - Accessory connector
D9412GV2/D7412GV2 | Operation and Installation Guide | 13.0 Programmer and Accessory Connections . Bosch Security Systems, Inc. | 5/05 | F01U003641B 61 13.0 Programmer and Accessory Connections 13.1 Programmer Connector Refer to the D5200 Operation Manual (P/N: 74-06176-000) for complete information...
Page 62 - Operation and Installation Guide | 14.0 Faceplates; Faceplate; - Ground fault detect enable
D9412GV2/D7412GV2 | Operation and Installation Guide | 14.0 Faceplates 62 Bosch Security Systems, Inc. | 5/05 | F01U003641B 14.0 Faceplates 14.1 D9412GV2 Faceplate Figure 32: D9412GV2 Faceplate EARTH GROUND COMMON BATTERY NEGATIVE ONLY BATTERY POSITIVE ONLY RELAY A RELAY B RELAY C + AUX POWER CLASS ...
Page 64 - Appendix A: System Wiring Diagrams, Issue A
D9412GV2/D7412GV2 | Operation and Installation Guide | Appendix A: System Wiring Diagrams, Issue A 64 Bosch Security Systems, Inc. | 5/05 | F01U003641B Appendix A: System Wiring Diagrams, Issue A A.1 D9412GV2 Control Panel Figure 34: D9412GV2, Power Supply Side D1640 16.5 V, 40 VA 60 Hz Transformer ...
Page 65 - Figure 35: D9412GV2, Input Points and Peripheral Devices; typical burglar alarm applications.
D9412GV2/D7412GV2 | Operation and Installation Guide | Appendix A: System Wiring Diagrams, Issue A . Bosch Security Systems, Inc. | 5/05 | F01U003641B 65 Figure 35: D9412GV2, Input Points and Peripheral Devices P105BL D125B Sw. Aux Pwr Zone B Zone A Pnl Common Pnl Common Loop B- Loop A- Loop B+ Loop...
Page 66 - - Up to 8 supervised keypads
D9412GV2/D7412GV2 | Operation and Installation Guide | Appendix A: System Wiring Diagrams, Issue A 66 Bosch Security Systems, Inc. | 5/05 | F01U003641B Figure 36: D9412GV2, SDI Devices PERIPHERAL DEVICE CONNECTIONS RED POWER + YELLOW DATA BUS A GREEN DATA BUS B BLACK COMMON ZONEX OUT 1 ZONEX IN 1 N....
Page 68 - Figure 38: D7412GV2, Input Points and Peripheral Devices
D9412GV2/D7412GV2 | Operation and Installation Guide | Appendix A: System Wiring Diagrams, Issue A 68 Bosch Security Systems, Inc. | 5/05 | F01U003641B Figure 38: D7412GV2, Input Points and Peripheral Devices Sw. Aux Pwr Zone B Zone A Pnl Common Pnl Common Loop B- Loop A- Loop B+ Loop A+ Earth Groun...
Page 69 - - Up to 8 supervised
D9412GV2/D7412GV2 | Operation and Installation Guide | Appendix A: System Wiring Diagrams, Issue A . Bosch Security Systems, Inc. | 5/05 | F01U003641B 69 Figure 39: D7412GV2, SDI Devices + - EARTH GROUND COMMON BATTERY NEGATIVE ONLY Maximum Charging Current 1.4 Amps. BATTERY POSITIVE ONLY RELAY A RE...
Page 70 - Appendix B: Point Address Charts; Place the labels on the base of the POPIT. Do
D9412GV2/D7412GV2 | Operation and Installation Guide | Appendix B: Point Address Charts 70 Bosch Security Systems, Inc. | 5/05 | F01U003641B Appendix B: Point Address Charts B.1 Zonex 1, Points 9 to 127 (D9412GV2); Zonex 1, Points 9 to 75 (D7412GV2) Place the labels on the base of the POPIT. Do not ...
Page 72 - Operation and Installation Guide | Specifications; Specifications
D9412GV2/D7412GV2 | Operation and Installation Guide | Specifications 72 Bosch Security Systems, Inc. | 5/05 | F01U003641B Specifications Table 27: Specifications Primary: Terminals 1 and 2 16.5 VAC 40 VA class 2 plug-in transformer (D1640) Voltage Input (Power Supply) Secondary: Terminals 4 and 5 S...
Page 73 - Notes
D9412GV2/D7412GV2 | Operation and Installation Guide | Specifications . Bosch Security Systems, Inc. | 5/05 | F01U003641B 73 Notes