Toro 476 - Installation Manual
Toro 476 – Installation Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – Mounting the Lift Arms
- Page 3 – Mount the other end of the link to the hydraulic; Installing the Lift Bail; Secure the lift bail housing to the lift bail with a; Insert the lift bail thru the holes in the lift arm and
- Page 4 – Installing the Drawbar
- Page 5 – Transport Strap Storage; Mount the valve control lever to the valve spool
- Page 7 – Transport Operation
- Page 8 – Schematics
- Page 12 – The Toro Total Coverage Guarantee
Form No. 3364-476 Rev A
5 to 7 Conversion Kit
Reelmaster Transport Frame
Model No. 33452—Serial No. 310000001 and Up
Installation Instructions
Installation
Installing the Hydraulic
Fittings
1. Park the machine on a level surface and lower the
cutting units to the ground.
2. Block the wheels to assure the frame is secure to
work on.
3. Disconnect the hydraulic hose couplers from the
tractor.
4. Relieve the pressure in the Transport Frame hydraulic
system, by slowly cracking the connections between
the hydraulic couplers and the hydraulic hoses
(Figure 1). Use extreme caution, when cracking the
connections, so oil is not directed toward the skin or
eyes. Wrap the connections with a rag to help catch
any oil that may escape.
Figure 1
1.
Hydraulic couplers
2.
Hydraulic hoses
5. With the couplings loose, cycle each valve section to
relieve any pressure between the valve section and
the hydraulic cylinder.
6. Carefully remove the 4 plugs from the top of the two
outboard valve sections (Figure 2).
Figure 2
1.
Valve section
2.
Plug
7. On the new 90 degree fittings, lubricate the O-ring
seals with oil and install the fittings into the valve
sections. Position the fittings as shown in Figure 3.
Figure 3
1.
40 degrees
Mounting the Hydraulic
Cylinders
1. Mount a cylinder rest to the underside of the front
cross channel with 2 bolts (1/2 x 1-1/2 inch), tapered
washers, and locknuts as shown inFigure 5.
© 2010—The Toro® Company
8111 Lyndale Avenue South
Bloomington, MN 55420
Register at www.Toro.com.
Original Instructions (EN)
Printed in the USA
All Rights Reserved
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Other Manuals for Toro 476
Summary
2. Mount the butt cap end of the hydraulic cylinder to the front cross channels with a cylinder shaft, 2 tubespacers, and 2 cotter pins (3/16 x 1-3/4 inch) asshown in Figure 5. 3. Apply #2 Permatex to the threads of the new elbow fittings and install the fittings to the hydrauliccylinder. Position t...
Figure 6 1. Lift arm 4. Link 2. Front cross channel 5. Shaft 3. Lift bail pin 6. Mount the other end of the link to the hydraulic cylinder with 2 larger flat washers, flat washers, lockwashers (3/8 inch), and bolts (3/8 x 1 inch) as shownin Figure 6. Position the larger flat washers betweenthe link ...
Figure 9 1. Lift arm 2. Lift bail Installing the Drawbar 1. Align the mounting holes in the drawbar with the mounting hole in the lift bail housing. Wheninstalling the drawbar, the offset hole in the drawbarshould be positioned up and the lift bail stop shouldbe on the top of the drawbar (Figure 10 ...