Siemens TC12 - User Manual

Siemens TC12

Siemens TC12 – User Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
57 Page 57
58 Page 58
59 Page 59
60 Page 60
61 Page 61
62 Page 62
63 Page 63
64 Page 64
65 Page 65
66 Page 66
67 Page 67
68 Page 68
69 Page 69
70 Page 70
71 Page 71
72 Page 72
73 Page 73
74 Page 74
75 Page 75
76 Page 76
77 Page 77
78 Page 78
79 Page 79
80 Page 80
81 Page 81
82 Page 82
83 Page 83
84 Page 84
85 Page 85
86 Page 86
87 Page 87
88 Page 88
89 Page 89
90 Page 90
91 Page 91
92 Page 92
93 Page 93
94 Page 94
95 Page 95
96 Page 96
97 Page 97
98 Page 98
99 Page 99
100 Page 100
101 Page 101
102 Page 102
103 Page 103
104 Page 104
105 Page 105
106 Page 106
107 Page 107
108 Page 108
109 Page 109
110 Page 110
111 Page 111
112 Page 112
113 Page 113
114 Page 114
115 Page 115
116 Page 116
117 Page 117
118 Page 118
119 Page 119
120 Page 120
121 Page 121
122 Page 122
123 Page 123
124 Page 124
125 Page 125
126 Page 126
127 Page 127
128 Page 128
129 Page 129
130 Page 130
131 Page 131
132 Page 132
133 Page 133
134 Page 134
135 Page 135
136 Page 136
137 Page 137
138 Page 138
139 Page 139
140 Page 140
141 Page 141
142 Page 142
143 Page 143
144 Page 144
145 Page 145
146 Page 146
147 Page 147
148 Page 148
149 Page 149
150 Page 150
151 Page 151
152 Page 152
153 Page 153
154 Page 154
155 Page 155
156 Page 156
157 Page 157
158 Page 158
159 Page 159
160 Page 160
161 Page 161
162 Page 162
163 Page 163
164 Page 164
165 Page 165
166 Page 166
167 Page 167
168 Page 168
169 Page 169
170 Page 170
171 Page 171
172 Page 172
173 Page 173
174 Page 174
175 Page 175
176 Page 176
177 Page 177
178 Page 178
179 Page 179
180 Page 180
181 Page 181
182 Page 182
183 Page 183
184 Page 184
185 Page 185
186 Page 186
187 Page 187
188 Page 188
189 Page 189
190 Page 190
191 Page 191
192 Page 192
193 Page 193
194 Page 194
195 Page 195
196 Page 196
197 Page 197
198 Page 198
199 Page 199
200 Page 200
201 Page 201
202 Page 202
203 Page 203
Page: / 203

Table of Contents:

  • Page 3 – SAFETY WARNING
  • Page 6 – TABLE OF CONTENTS
  • Page 9 – FIGURES; FIGURE 1 - SYSTEM DIAGRAM FOR DIGITAL OUTPUT RACK CONNECTION TO A
  • Page 10 – TABLES
  • Page 11 – INTRODUCTION; DOCUMENTS
  • Page 12 – ISSUE STATE AND AMENDMENTS; Section added on LMU Commissioning.; Issue 3 - Significant changes for this issue listed below
  • Page 16 – Instation
  • Page 17 – Digital Output Rack
  • Page 19 – Figure 2 - System Connection for two ITU Racks
  • Page 20 – TC12 Installation, Commissioning & Maintenance Handbook; INSTATION; Note; Instation Cabinet and PC without racks; Temperature and humidity requirements; The ITU will work over:
  • Page 21 – Figure 3 - TC12 Cabinet - External Dimensions
  • Page 22 – Safety Notes on TC12 Instation
  • Page 29 – SAFETY NOTE; TC 12 INSTATION PC INSTALLATION
  • Page 31 – If there is more than one IMD card in the PC, care should be taken to
  • Page 32 – U Rack, Radial System
  • Page 33 – Audio 1 Signal
  • Page 35 – Figure 7 - PSU Board Layout
  • Page 36 – Figure 8 - PSU Board Switch Settings
  • Page 37 – Setting the Voltage Range of the PSU; Ensure that the PCB is fitted the correct way around i.e. the Mains
  • Page 38 – ALWAYS; be fitted before any connectors are attached to the PCB and; NEVER; be removed whilst any cables are connected to the PCB.; Connector PL2
  • Page 39 – Connector PL1; : Once installed the 24-way cables should be tagged with a number 1-4; Connector PL3
  • Page 40 – Figure 10 - Modem PCB Layout
  • Page 41 – SWITCH NUMBER; WITH EQUALIZER
  • Page 42 – Switch positions 7 and 8; SETTING FOR UK
  • Page 44 – Transformer Board Connector PL2
  • Page 45 – Figure 11 - Transformer PCB Layout; System
  • Page 46 – Figure 13 - Digital Output PCB Layout
  • Page 47 – Switch S1 PCB Address
  • Page 49 – Connector PL4
  • Page 54 – Safety Tests on the TC12 Instation; Comark Insulation Meter 1905 (or similar capable of 1000 V).
  • Page 55 – voltages generated by the Test Instrument.; be repeated unnecessarily as the mains filters may be damaged.; WARNING; tests have been completed.
  • Page 56 – Commissioning Procedure after Power Up; Switch on and check all power LEDs on the PSU and Modem PCBs are lit.
  • Page 57 – Modem PCB
  • Page 58 – Figure 16 - Modem and PSU PCB Status LEDs; Effect of Incorrect Switch Settings on the PSU PCB; S2 - Audio Alarm Configuration Switch
  • Page 59 – Effect of Incorrect Switch Settings on the Modem PCB; SW1 - Mode Select Switch; WARNING - FOR UK USAGE THE OUTPUT POWER MUST NOT BE SET TO
  • Page 60 – Effect of Incorrect Switch Settings on the Transformer PCB; IMD Interrupt Vector switch DS2 incorrectly set.
  • Page 61 – associated PCB they must be replaced in pairs.
  • Page 64 – Meanings of the graphics
  • Page 68 – Details on bad packets from Ethernet
  • Page 69 – Internal Power Supply Fuse on the PSU PCBs
  • Page 70 – Figure 17 - Master Switch Panel Fuses; Master Switch and RCD.; date the; into the equipment. The replacement date is therefore; after; the date on the label.; Power Supply Tests
  • Page 72 – OUTSTATION
  • Page 74 – Figure 18 - OUTSTATION PCB LAYOUT; Figure 19 - OUTSTATION PCB and DAUGHTER BOARD LAYOUT
  • Page 77 – OPERATION
  • Page 78 – THRESHOLD
  • Page 79 – Ferrite Core
  • Page 82 – Note. When pushing the connectors into PL2 and PL4 the OTU PCB must
  • Page 86 – Figure 27 - Freestanding Outstation Inputs
  • Page 88 – RED LAMP MONITORING; is not approved by the Department of; 4 are unused, as they do not line up with any of the 50 pins on plug PL1.; - LMU Input 24 (pins 47 and 48) is internally connected to the ZXO input; End Connector Socket Positions not used; Connector Viewed from the BACK; Figure 28 - LMU Input Connector
  • Page 89 – Table 6 - Outstation Processor PCB - PL1
  • Page 92 – Voltage Monitoring Transformer
  • Page 93 – Ferrite Clamp
  • Page 94 – For export lamp monitoring only:; Total voltage sensors
  • Page 96 – Safety Tests on the TC12 Outstation
  • Page 97 – Commissioning Procedure after Power Up; If the system fault LED lights on power up (see section 3.4.1 for LED; Checking OTU Output wiring:
  • Page 98 – Checking OTU Input wiring:; handbook for instructions.; Commands to enable handset access and reset Outstation; Enable write access to OTU data. This is required to change any
  • Page 102 – MUST; be on either bit 0 or bit 4 of a reply byte.; NOT; available for use with the GOL command.
  • Page 103 – GOL; Comment: The command has two index fields:; GAQ; To specify the time in seconds that a configured queue unit input
  • Page 106 – Fault Flag and Data displays; Displays Fault Flags and data as text. (This is available on PB392
  • Page 114 – allowable; are allowed before a dim change fault is indicated.
  • Page 121 – Controller
  • Page 123 – Test / Maintenance Commands
  • Page 125 – High Occupancy Commands
  • Page 127 – GRH
  • Page 129 – on the Freestanding OTU is not approved by
  • Page 137 – Figure 29 - Phases in Stages for Example 6; Phase H is a Pedestrian phase of Type 1 appearance.; is not approved for use on the free-standing
  • Page 140 – TCSU TC12 OTU Commissioning Procedure; Reset OTU and select TCSU default configuration data.
  • Page 142 – indicate that a reply message
  • Page 143 – Figure 30 - Outstation PCB Status LEDs
  • Page 146 – L N E
  • Page 148 – TC12 INSTATION TEST SET; Mains voltage and frequency ranges
  • Page 157 – USING THE TEST SET FOR FAULT FINDING ON TC12 SYSTEM
  • Page 158 – ELSE; The line can be given an identifier
  • Page 164 – USING THE TEST SET AS A MONITOR FOR THE INSTATION PC
  • Page 165 – USING THE TEST SET AS HANDSET
  • Page 166 – MAINTENANCE OF INSTATION TEST SET; mains lead
  • Page 167 – TC12 OUTSTATION TEST SET; Mains voltage and frequency ranges
  • Page 168 – USING THE OUTSTATION TEST SET; : THE SPECIAL TEST CABLES MUST ALWAYS BE USED WHEN; plugs; provide the; sockets; provide
  • Page 169 – Figure 32 - Outstation Test Set Front Panel
  • Page 170 – Figure 33 - Outstation Test Set Connections; a) Normal Equipment connection OTU to Controller
  • Page 175 – Checking that OTU Outputs are working
  • Page 177 – OVERVIEW
  • Page 178 – Mains voltage and frequency ranges; Integral OTU; Temperature and Humidity Requirements; The OTU will work over the temperature range -15 to 75
  • Page 180 – Figure 34 - Integral OTU PCB Layout and Switch Settings; /4 Wire Select Switch
  • Page 181 – Warning - for use in the UK the power level must; is set to
  • Page 182 – Switch; Warning - For use in the UK the power level must not be set to greater
  • Page 184 – Connection of SCOOT Detector Inputs to an Integral TC12 OTU
  • Page 185 – Figure 35 - LMU Input Connector; to
  • Page 186 – Current Transformers; Sign
  • Page 188 – Number of switched sign drives
  • Page 189 – Commissioning Procedure after Power Up
  • Page 190 – Subsection No
  • Page 191 – ENO command
  • Page 201 – Effect of Incorrect Switch Settings on the OTU PCB
Loading the manual

TC12 Installation, Commissioning & Maintenance Handbook

666/HE/43100/000

Page i

Issue 10

SIEMENS TRAFFIC CONTROLS
Sopers Lane
POOLE
Dorset
BH17 7ER

SYSTEM: TC12




TC12

Installation, Commissioning

and Maintenance Handbook




PREPARED:

A Pickering

FUNCTION:

Engineer


This document is electronically held and approved in Meridian










© Siemens plc. 1997 - 2004 All rights reserved.


The information contained herein is the property of Siemens plc. and is supplied without
liability for errors or omissions. No part may be reproduced or used except as
authorised by contract or other written permission. The copyright and the foregoing
restriction on reproduction and use extend to all media in which the information may be
embodied.

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 3 - SAFETY WARNING

TC12 Installation, Commissioning & Maintenance Handbook 666/HE/43100/000 Page iii Issue 10 SAFETY WARNING In the interests of health and safety, when using or servicing this equipment the following instructions must be noted and adhered to: Only skilled or instructed personnel with relevant tech...

Page 6 - TABLE OF CONTENTS

TC12 Installation, Commissioning & Maintenance Handbook 666/HE/43100/000 Page vi Issue 10 TABLE OF CONTENTS 1 INTRODUCTION ................................................................................................. 1 1.1 PURPOSE ................................................................

Page 9 - FIGURES; FIGURE 1 - SYSTEM DIAGRAM FOR DIGITAL OUTPUT RACK CONNECTION TO A

TC12 Installation, Commissioning & Maintenance Handbook 666/HE/43100/000 Page ix Issue 10 6.3.1 General ........................................................................................................ 169 6.3.2 Configuring the Integral OTU PCB ...............................................

Other Siemens Models