Page 2 - The quick way to start with the TPS400 Mining Programs.; The quick way to start
TPS400 Mining Manual-1.0.0en 2 To use equipment in the permitted manner, please refer to thedetailed safety instructions in the TPS400 User Manual (Englishversion). The quick way to start with the TPS400 Mining Programs. The quick way to start © 2003 Leica Geosystems AG Heerbrugg, ® All rights reser...
Page 4 - Symbols used in the sequence; Contents
TPS400 Mining Manual-1.0.0en 4 Contents Introduction ................................................ 5 How to use this manual ............................... 5 Symbols used in the sequence of operation .................................................. 5 Peg Survey ....................................
Page 5 - Introduction; How to use this manual; Navigation keys
TPS400 Mining Manual-1.0.0en Introduction 5 Introduction How to use this manual This manual describes the basicoperation of the TPS400 Miningfield programs. It shall be usedtogether with a TPS400instrument. For detailed description aboutthe whole functionality of theTPS400 instrument please referto ...
Page 6 - Peg Survey; point
TPS400 Mining Manual-1.0.0en Peg Survey 6 Peg Survey Mining_z01 Introduction The application "Peg Survey" isused to establish a forward peg(point). It is used to control theintermediate horizontal anglebetween backsight and foresightpoints. It also checks thehorizontal distances and heightso...
Page 7 - Before starting Peg Survey; • Station coordinates
TPS400 Mining Manual-1.0.0en Peg Survey 7 Before starting Peg Survey Data uploading using "MiningEditor" • Station coordinates (East, North, Height,Grade elevation) • Backsight point coordinates (East, North, Height,Grade elevation) • Tolerances, sequence, number of sets • Job definition Upl...
Page 8 - Start and execution Peg Survey
TPS400 Mining Manual-1.0.0en Peg Survey 8 Start and execution Peg Survey > Step 3 Choose "Start" bypressing [F4], thenenter point number(PtID) andinstrument height(hi) for the station.The sign for theinstrument height(hi) is normallynegative. > Step 4 [SET] Set Point number(PtID) andin...
Page 9 - Error messages; One Set; Two Sets; • The point number entered is
TPS400 Mining Manual-1.0.0en Peg Survey 9 Error messages Number of sets: One set means to measure twotimes the backsight point andtwo times the foresight point inboth faces. The meaning of set isdescribed: Mining_z02 One Set The user must completethe number of sets aspreset in the tolerancesetting. ...
Page 10 - BFFB; Proceeding Peg Survey; Set 1 of total 3
TPS400 Mining Manual-1.0.0en Peg Survey 10 Sequence: It defines the measuringsequence. Options:• BFFB Backsight-Foresight-Foresight-Backsight • BFBF Backsight-Foresight-Backsight-Foresight • BBFF Backsight-Backsight-Foresight-Foresight [OK] Leaves this dialogand proceed to thenext dialog. Proceeding...
Page 11 - Proceeding Peg Survey, continued; or
TPS400 Mining Manual-1.0.0en Peg Survey 11 Proceeding Peg Survey, continued > Step 7 Enter a desiredforesight pointnumber (PtID). [OK] Saves the foresightpoint number andproceed to themeasure dialog. Sample dialog: > Step 5 Enter the reflectorheight (hr) for thebacksight point, ifrequired. >...
Page 13 - Results; Height residual
TPS400 Mining Manual-1.0.0en Peg Survey 13 Results Sample dialog: Tolerances dialog: • dHz: Residual on thehorizontal angle • dHD: Residual on thehorizontal distance • dH: Height residual • TolHz, TolHD, TolH: Tolerances horizon-tal angle, horizontaldistance and height • Set No: Set number [PAGE] Sa...
Page 15 - Saving data; Coordinates foresight point:; Easting
TPS400 Mining Manual-1.0.0en Peg Survey 15 Results, continued [OK] Quits the program. [EXIT] Terminates themeasurement andreturns to the start-up menu. The following result data arestored in the internal memory: Result: mHz: Averageintermediatehorizontal anglebetween backsightpoint and foresightpoin...
Page 16 - Front Line Peg; there is
TPS400 Mining Manual-1.0.0en Front Line Peg 16 Front Line Peg Introduction The application "FLP" is used tomark a new line peg (Front linepeg). This application is similarto "Peg Survey" and there is only one set of measurementrequired . For a more detail explanation of"FLP",...
Page 17 - Grades
TPS400 Mining Manual-1.0.0en Grades 17 Grades Mining_z04 Introduction "Grades" application is used tomark gradelines along the sidewalls of the mines (tunnels). Itallows users to input the slopegradient and an offsetconcerning the grade point. Itcomputes the stake out heightdifference. The p...
Page 18 - Start and execution Grades
TPS400 Mining Manual-1.0.0en Grades 18 Start and execution Grades Menu dialog of "FLP": Sample dialog: If the slope gradient(station until foresightpoint) is the same likethe slope gradient(backsight point untilstation) then continuedirect with > Step 3 . You can start Grades either bysel...
Page 19 - Start and execution Peg Survey, continued; Slope gradient explained:; Height difference explained:; Set the
TPS400 Mining Manual-1.0.0en Grades 19 Mining_z06 Start and execution Peg Survey, continued Mining_z05 150 1 H New Gradeline > Step 1 Enter the slopegradient(proportion e.g.1:150). Slope gradient explained: Gradeline > Step 2 Enter the heightdifference. Height difference explained: H: Current ...
Page 20 - Gradeline Marking
TPS400 Mining Manual-1.0.0en Grades 20 Gradeline Marking Sample dialog: > Step 4 Enter a desired pointnumber (PtID). > Step 5 Aim at target pointand measure. [MEASURE] or [DIST]/[REC] Measurement istriggered and storedin the internalmemory. [PREV] Returns to the startof "Grades"applica...
Page 23 - Offset
TPS400 Mining Manual-1.0.0en Offset 23 Offset Introduction "Offset" application is generallyused to obtain sections of thetunnels for volume computationas well as mapping of thetunnels. It allows users to inputoffset value (left, right, up anddown) and computes aftermeasurement the actualcoo...
Page 24 - Start and execution Offset
TPS400 Mining Manual-1.0.0en Offset 24 Start and execution Offset Menu dialog of "FLP": Sample dialog: > Step 1 Enter a desired pointnumber (PtID) andthe offset value. > Step 2 Using for the offsetdefinition. (Left, Up, Right, Down) (Left, Down, Right, Up) You can start Offset either b...
Page 25 - Start and execution Offset, continued; Definition of offset explained:
TPS400 Mining Manual-1.0.0en Offset 25 Start and execution Offset, continued Definition of offset explained: Mining_z10 Up Down Right Left > Step 3 Aim at target pointand measure. [MEASURE] or [DIST]/[REC] Measurement istriggered and storedin the internalmemory. [EXIT] Leaves theapplication Offse...
Page 27 - Setting out; Polar setout
TPS400 Mining Manual-1.0.0en Setting out 27 Setting out This program calculates therequired elements to stakeoutpoints from coordinates ormanualy entered angles,horizontal distances andheights. Setting out differencescan be displayed continuously. Setting out coordinates frommemoryProcedure: Select ...
Page 28 - Orthogonal setout; dEast
TPS400 Mining Manual-1.0.0en Setting out 28 Orthogonal setout The position offset betweenmeasured point and setout pointis indicated in a longitudinal andtransversal element. dLength: Longitudinal offset:positive if nominalpoint further away. dTrav.: Transversal offset,perpendicular toline-of-sight:...
Page 29 - Tie Distance; Tie Distance
TPS400 Mining Manual-1.0.0en Tie Distance 29 Tie Distance The application Tie Distance computes slope distance,horizontal distance, heightdifference and azimuth of twotarget points measured online , selected from the Memory or entered using the Keypad . The user can choose betweentwo different metho...
Page 31 - Mining Editor; Installation on the PC
TPS400 Mining Manual-1.0.0en Mining Editor 31 Mining Editor Introduction "Mining Editor" (PC ProgramPackage) is a Windows-basedprogram used for the dataexchange between the TPS400Series and the PC. Installation on the PC The installation program for the"Mining Editor" can be found on...
Page 32 - Creating fixpoint files; Program content, continued; Practical Examples
TPS400 Mining Manual-1.0.0en Mining Editor 32 • Define and uploadTolerances Defining tolerances, editingtolerances (passwordprotected), uploadingtolerances • Creating fixpoint files Creating and editing offixpoint files (Coordinates) Program content, continued Practical Examples The following pages ...
Page 33 - Save the created coordinate list:; Define tolerances; Create a new password:
TPS400 Mining Manual-1.0.0en Mining Editor 33 First Example (Creating fixpoint files, define tolerances, uploading) Creating fixpoint files > Step 1 Open a new file: File ! ! ! ! ! New > Step 2 Enter point number, coordinates,backsight reference point, gradeelevation. > Step 3 Save the crea...
Page 34 - a) Select a tolerance type
TPS400 Mining Manual-1.0.0en Mining Editor 34 First Example (Creating fixpoint files, define tolerances, uploading), continued > Step 5 a) Select a tolerance type (Primary, Secondary,Tertiary). b) Enter the values for: • Horizontal Angle Limit• Horizontal Distance Limit• Height Limit Upload Fixpo...
Page 35 - Second Example (Importing of fixpoints in ASCII format); Process import fixpoint files; File
TPS400 Mining Manual-1.0.0en Mining Editor 35 Second Example (Importing of fixpoints in ASCII format) Process import fixpoint files The "Mining Editor" allows to importfixpoint files in ASCII format. > Step 1 File ! ! ! ! ! Open > Step 2 ASCII-File search and select. > Step 3 Open t...
Page 36 - Leica Geosystems AG
Leica Geosystems AG CH-9435 Heerbrugg (Switzerland) Phone +41 71 727 31 31 Fax +41 71 727 46 73 www.leica-geosystems.com Printed in Switzerland - CopyrightLeica Geosystems AG, Heerbrugg,Switzerland 2003Original text 734337-1.0.0en Leica Geosystems AG, Heerbrugg,Switzerland, has been certified asbein...