Ingersoll Rand IRN100-200H-2S - Manual

Ingersoll Rand IRN100-200H-2S

Ingersoll Rand IRN100-200H-2S – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
57 Page 57
58 Page 58
59 Page 59
60 Page 60
61 Page 61
62 Page 62
63 Page 63
64 Page 64
65 Page 65
66 Page 66
67 Page 67
68 Page 68
69 Page 69
70 Page 70
71 Page 71
72 Page 72
73 Page 73
74 Page 74
75 Page 75
76 Page 76
77 Page 77
78 Page 78
79 Page 79
80 Page 80
81 Page 81
82 Page 82
83 Page 83
84 Page 84
85 Page 85
86 Page 86
87 Page 87
88 Page 88
89 Page 89
90 Page 90
91 Page 91
92 Page 92
93 Page 93
94 Page 94
95 Page 95
96 Page 96
97 Page 97
98 Page 98
99 Page 99
100 Page 100
Page: / 100

Table of Contents:

  • Page 2 – WARRANTY
  • Page 4 – IF IN DOUBT CONSULT SUPERVISION.
  • Page 5 – TABLE 1; GENERAL INFORMATION SECTION
  • Page 7 – PURCHASE ORDER DETAILS; ROTARY SCREW AIR COMPRESSOR; Record the serial number and model number of your unit here.
  • Page 8 – SAFETY INSTRUCTIONS; DANGER; SAFETY PRECAUTIONS
  • Page 9 – Avoid bodily contact with compressed air.; Materials; WARNING; AVOID INGESTION, SKIN CONTACT AND; Consult a physician if compressor lubricant is inhaled.; Transport
  • Page 11 – NOTICE; To obtain satisfactory compressor operation and; Refer to the Instruction / Operators Manual before; Can contain carbon monoxide or other; Do not breathe this air.; Hazardous voltage. Can cause severe injury or; Disconnect power before servicing.; Rotating fan blade. Can cause severe injury.; Do not operate with covers removed.
  • Page 12 – Lift only from base channels; Relieve pressure before removing filter plugs/caps,; Air discharge; CAUTION; Use only SSR ULTRA COOLANT; Use only Ingersoll Rand SSR H-1F food grade coolant.; Lift here; Do not touch. Allow to cool before servicing.
  • Page 13 – Replace filter element after first 150 hours of; Rotation; WARNING HIGH VOLTAGE; Air
  • Page 14 – Before starting this air compressor unit the shipping; IMPORTANT
  • Page 15 – GRAPHIC FORM AND MEANING OF ISO SYMBOLS; Prohibition / Mandatory
  • Page 20 – READ THIS; transportation company.; Ingersoll Rand Company; UNPACKING AND HANDLING
  • Page 21 – For technical information see section 8.0.; LOCATION IN PLANT; Ensure that the correct tie down points are used.
  • Page 22 – DISCHARGE AND CONDENSATE PIPING; The drain line must slope downward from; For low volume systems that may not include a; Do not use the compressor to support the discharge pipe.
  • Page 23 – soll Rand Distributor or Air Center.; The compressor and drive should be properly grounded
  • Page 24 – Fuse Type; Fast Acting Class−J, T or Semiconductor type,; Example of voltage imbalance calculation
  • Page 25 – WATERCOOLED UNITS; should
  • Page 28 – OUTDOOR SHELTERED INSTALLATION
  • Page 29 – GENERAL INFORMATION; TECHNICAL INFORMATION-SINGLE STAGE; Heater Circuit; Fuse type
  • Page 30 – General
  • Page 33 – Fuse type
  • Page 35 – KEY
  • Page 36 – X−X
  • Page 44 – Revision B
  • Page 46 – Revision A
  • Page 48 – Revision C
  • Page 50 – PROCESS AND INSTRUMENTATION DIAGRAM N250−300H TWO STAGE
  • Page 54 – LABEL
  • Page 55 – COLORS
  • Page 57 – COLOR
  • Page 67 – OPERATING INSTRUCTIONS; Prior to starting; Refer to diagram T5716 above.; Initial check sequence
  • Page 68 – PRIOR TO STARTING
  • Page 69 – INTELLISYS CONTROLS; Pressing this button will activate the start sequence.
  • Page 71 – CURRENT STATUS SCREEN; CURRENT STATUS items
  • Page 73 – OPERATOR SETPOINTS
  • Page 74 – stage compressors will always blowdown when signaled to stop.
  • Page 76 – Scheduled start; SENSOR CALIBRATION; SENSOR CALIBRATION Items
  • Page 78 – ENERGY STATUS MESSAGES; AVERAGE PACKAGE kW HOURS −
  • Page 79 – SERVICE WARNINGS
  • Page 81 – MAINTENANCE PROMPTS
  • Page 82 – MAINTENANCE CHART; Maintenance Schedule
  • Page 83 – first 50 hours; of; MAINTENANCE PROCEDURES; vented to atmosphere before beginning any work.
  • Page 85 – ROUTINE MAINTENANCE
  • Page 86 – COOLANT DRAIN
  • Page 87 – Clean and inspect all parts prior to reinstallation.; SEPARATOR TANK SCAVENGE SCREEN/ORIFICE
  • Page 89 – Once the screw is removed,
  • Page 90 – Aircooled machines
  • Page 93 – not be covered by the terms of any warranty agreement
Loading the manual

OPERATION AND MAINTENANCE MANUAL

C.C.N. : 54731245

DATE : DECEMBER 2007

REV. : J

IRN37−160K−CC

IRN50−200H−CC

IRN75−160K−2S

IRN100−200H−2S
IRN250−300H−2S

TM

Ensure that the operator reads and understands the
decals and consults the manuals before maintenance
or operation.
Ensure that the Operation and Maintenance manual
is not removed permanently from the machine.
Ensure that maintenance personnel are adequately
trained, competent and have read the Maintenance
Manuals.

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - WARRANTY

AIR COMPRESSOR GROUP BONDED WARRANTY & REGISTERED START UP WARRANTY The Company warrants that the equipment manufactured by it and delivered hereunder will be free of defects in material and workmanship for a period of twelve months from the date of placing the Equipment in operation or eighteen...

Page 4 - IF IN DOUBT CONSULT SUPERVISION.

IRN37 - 160K - CC & IRN50 - 200H -CC & IRN75 - 160K - 2S & IRN100 - 200H - 2S & IRN 250 - 300H - 2S http://air.irco.com 2 2.0 FOREWORD Machine models represented in this manual may be used in various locations worldwide. Machines sold and shipped into European community countries req...

Page 5 - TABLE 1; GENERAL INFORMATION SECTION

IRN37 - 160K - CC & IRN50 - 200H & IRN75 - 160K - 2S & IRN - 100 - 200H - 2S & IRN 250 - 300H - 2S http://air.irco.com 3 WARNING The use of the machine in any of the situation types listed in table 1:− Is not approved by Ingersoll Rand, May impair the safety of users and other person...

Other Ingersoll Rand Models