Daikin LRYEQ-AY - User Manual

Daikin LRYEQ-AY

Daikin LRYEQ-AY Air Conditioner – User Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
Page: / 28

Table of Contents:

  • Page 2 – LR
  • Page 4 – CONTENTS; -1 Safety Precautions; WARNING; Installation manual
  • Page 5 – DANGER: RISK OF EXPLOSION; -2 Special Notice of Product; CAUTION
  • Page 6 – To fix the fluorinated greenhouse gases label; -3 Disposal Requirements; BEFORE INSTALLATION; -1 Standard Supplied Accessories; Note; -2 Example of System Configuration; RXXX
  • Page 7 – -3 Indoor Unit Constraints (Refrigeration and; Restrictions; SELECTION OF LOCATION; Installation Space Examples; Capacity class; When installed as a single unit
  • Page 8 – • Ensure the base is high enough that intakes are not clogged by; HANDLING THE UNIT; Decide on the transportation route.
  • Page 9 – PLACING THE UNIT; REFRIGERANT PIPING; To Piping Work Contractors
  • Page 10 – -1 Selection of Piping Material and Size; • Use the following type of refrigerant piping.
  • Page 11 – -2 Selection of Refrigerant Branching
  • Page 12 – Precautions when knocking out knock holes
  • Page 15 – Expansion Valve Selection; To Electric Engineering Contractors
  • Page 16 – -1 Example of Wiring Entire System; • Be sure to connect the power wiring to the power wiring terminal; -2 To Open the Electrical Component Box of the; Capacity for operation output : 0.5A or less at AC 220 to 240V.
  • Page 17 – -3 Procedure for Incoming Wiring; -4 Procedure for Power Supply Wiring; Procedure for Power Supply Wiring
  • Page 18 – Operation output wiring connections
  • Page 19 – -5 Procedure for Wiring Inside Units; When routing high-voltage wiring (power supply wiring, earth; INSPECTION AND PIPE INSULATION; • Vacuum drying
  • Page 20 – -2 Thermal Insulation Work; -3 Checking of Device and Installation Conditions; Insulation material
  • Page 21 – CHECKS AFTER WORK COMPLETION; Control box; RUN switch; DO NOT MOVE; ON
  • Page 23 – MAINTENANCE AND SERVICE; • This product must fill the refrigerant in the field.
Loading the manual

INSTALLATION MANUAL

LRYEQ16A7Y1

CONVENI-PACK

4PEN448939-1A.book Page 1 Monday, September 5, 2016 7:12 PM

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - LR

Daikin Europ e N.V . CE - DECLARA TION-OF-CONF O RMIT Y CE - KONFORM ITÄTSE RKLÄRUNG CE - DECLARA TION-DE-CONF O RMIT E CE - CONFORM ITEIT SVERKL ARING CE - DECLARACION-DE-CONFORMIDAD CE - DICHIARAZI O NE -DI-CONFORMIT A CE - ΔHΛΩΣ Η ΣΥ Μ ΜΟΡΦΩ ΣΗΣ CE - DECL ARAÇÃO-DE-CONFORM IDADE CE - ЗАЯВ ЛЕНИЕ-О...

Page 4 - CONTENTS; -1 Safety Precautions; WARNING; Installation manual

Installation manual 1 LRYEQ16A7Y1 CONVENI-PACK 4P448939-1A – 2016.07 CONTENTS 1. FIRST OF ALL ......................................................................... 1 1-1 Safety Precautions............................................................ 11-2 Special Notice of Product ...................

Page 5 - DANGER: RISK OF EXPLOSION; -2 Special Notice of Product; CAUTION

LRYEQ16A7Y1 CONVENI-PACK 4P448939-1A – 2016.07 Installation manual 2 • Do not allow children to climb on the outside unit and avoid placing objects on the unit. Injury may result if the unit becomes loose and falls. • Be sure to earth the CONVENI-PACK. Do not earth the unit to a utility pipe, lightn...

Other Daikin Air Conditioners Models

All Daikin Air Conditioners