York YMB-HW - Manuals

York YMB-HW – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8

Summary

Page 2 - INSTALLATION; FIG. 1 – UNIT NOMENCLATURE; • Engineering Guide, Direct Drive YMB Models; MODEL; HW

YORK INTERNATIONAL 2 FORM 115.20-NOM4 (105) 3 YORK INTERNATIONAL INSTALLATION FORM 115.20-NOM4 (105) TABLE OF CONTENTS FIG. 1 – UNIT NOMENCLATURE �� � �� ��� ���� ��� ������� � � ��� ��� �� � ���� ����� � ���� ����� � ���� ����� � ���� ��� ���� ����� ���� ����� ���� �������� � � � ���������� �������...

Page 4 - FIG. 4 – STANDARD LOW VOLTAGE WIRING

YORK INTERNATIONAL 4 FORM 115.20-NOM4 (105) INSTALLATION 5 YORK INTERNATIONAL INSTALLATION FORM 115.20-NOM4 (105) FIG. 2 – YMBE WIRING CONNECTIONS, 15 & 20 KW FIG. 4 – STANDARD LOW VOLTAGE WIRING FIG. 5 – T200 THERMOSTAT W/CONTROLLER OPTION ��� ������� � �� � �� ��� ������� � �� � �� ��� �������...

Page 6 - PIPING; (see table 3 for connection; PIPING PRECAUTIONS

YORK INTERNATIONAL 6 FORM 115.20-NOM4 (105) INSTALLATION 7 YORK INTERNATIONAL FORM 115.20-NOM4 (105) PIPING The supply and return piping must be adequately sized to meet the design water flow requirements as specified for the specific installation (see table 3 for connection sizes). All chilled wate...

York Manuals