Page 2 - Brookhaven Direct Vent Gas Fireplace; PLEASE READ THE INSTALLATION & OPERATING INSTRUCTIONS; Table of Contents
Brookhaven Direct Vent Gas Fireplace 2 10009459 PLEASE READ THE INSTALLATION & OPERATING INSTRUCTIONS BEFORE USING APPLIANCE. Thank you and congratulations on your purchase of a CFM Corporation fireplace.IMPORTANT: Read all instructions and warnings carefully before starting installation. Failure...
Page 3 - OFF; PLEASE REVIEW THE FOLLOWING CAREFULLY; Locating Your Fireplace; Installation & Operating Instructions
10009459 3 Brookhaven Direct Vent Gas Fireplace This gas appliance should be installed by a qualified installer in accordance with local building codes and with current CSA-B149.1 Installation codes for Gas Burning Appliances and Equipment. For USA Installations follow local codes and/or the current ...
Page 4 - Framing Dimensions; 0DVT Fireplace Dimensions; Fireplace specifications and framing dimensions.
Brookhaven Direct Vent Gas Fireplace 4 10009459 Ref. 20DVT A 20” (508 mm) B 29 ¹⁄₂ ” (749 mm) C 13 ¹⁄₂ ” (343 mm) D 19 ³⁄₄ ” (502 mm) E 14 ³⁄₄ ” (375 mm) F 15” (381 mm) G 1 ¹⁄₂ ” (38 mm) H 4 ¹⁄₄ ” (108 mm) I 6 ³⁄₄ ” (171 mm) J 32 ¹⁄₂ ” (826 mm) K 8” (203 mm) Framing Dimensions L 31 ³⁄₄ ” (806 mm) M ...
Page 5 - Clearance to Combustibles; Combustible mantel leg minimum installation.; Hearth; Mantel Chart; Combustible mantel minimum installation.; Mantel Shelf
10009459 5 Brookhaven Direct Vent Gas Fireplace Top of Unit to Ceiling ................................ 32” (813 mm)Front of Unit to Combustibles ................... 36” (914 mm) Appliance Top of Standoff .........................................0” (0 mm) Bottom ........................................
Page 6 - DO NOT; Certified To; Vented Gas Fireplace Heaters
Brookhaven Direct Vent Gas Fireplace 6 10009459 Framing and Finishing Check fireplace to make sure it is levelled and properly positioned. To mount the appliance:1. Choose the location.2. This unit comes with four (4) flanges pre-mounted on both sides of the fireplace to allow two different drywall thi...
Page 7 - INSTA VENT FREE; Typical gas supply installation.; Attach the wire to the ON/OFF switch and install; Remote switch wiring diagram for R models.; If vent termination is installed in an accessible loca-; General Venting; There must not be any obstruction
10009459 7 Brookhaven Direct Vent Gas Fireplace FP297A INSTA VENT FREE UVHB26 GAS SUPPLY 7/1/98 FP297A 1/2” Gas Supply 1/2” NPT x 1/2” Flare Shut- off Valve 3/8” Flex Line (From Valve) Fig. 5 Typical gas supply installation. The fireplace valve must not be subjected to any test pressures exceeding 1/...
Page 8 - General Venting Information - Termination Location; Canadian Installations
Brookhaven Direct Vent Gas Fireplace 8 10009459 V V V V V V V X X X D E B B B C B M B A J K F L VENT TERMINATION AIR SUPPLY INLET AREA WHERE TERMINAL IS NOT PERMITTED H I ����� ������ Operable Operable Fixed Closed V B CFM145aDV Termin Location5/01/01 Rev. 12/05/01 sta INSIDE CORNER DETAIL V A G N N...
Page 9 - Termination clearances.; General Information Assembling Vent Pipes; Canadian Installations:; Flex Vent Pipes; Apply high temperature sealant to 4” and 7” pipes.; Termination Clearances; of Caps
10009459 9 Brookhaven Direct Vent Gas Fireplace Fig. 7a Termination clearances. General Information Assembling Vent Pipes Canadian Installations: Venting system must be installed in accordance with the current CSA-B149.1 installation code. USA Installations: The venting system must conform with loca...
Page 10 - How to Use the Vent Graph; Horizontal dimension from the outside face of the; ertical dimension from the fl; Twist Lock Pipes
Brookhaven Direct Vent Gas Fireplace 10 10009459 The vent chart should be read in conjunction with the following vent installation instructions to determine the relationship of the vertical and horizontal dimensions of the vent system.1. Determine the height of the center of the horizontal vent pipe...
Page 11 - If a 90° elbow is fitted directly on top of the fireplace; Maximum horizontal run with no rise.; According to the vent graph (Page 10) the; Total angular variation = 270°; Maximum elbow usage.; Vertical Sidewall Installation; When using flex vent, the opening will have to; Combustible Walls
10009459 11 Brookhaven Direct Vent Gas Fireplace Horizontal plane means no vertical rise exists on this portion of the vent assembly. • The maximum number of 90° elbows per side wall installation is three (3). (Fig. 11) • If a 90° elbow is fitted directly on top of the fireplace flange, the maximum hor...
Page 12 - Vent Opening for Combustible Wall; Locate vent opening on wall.
Brookhaven Direct Vent Gas Fireplace 12 10009459 VO584-100Vent Opening2/99 djt Vent Opening for Combustible Wall 9 ³⁄₈ ” (240 mm) 9 ³⁄₈ ” (240 mm) Fireplace Hearth Framing Detail Opening for Noncombustible Wall 7 ¹⁄₂ ” (190 mm) VO584-100 Fig. 15 Locate vent opening on wall. ZCS101 Zero Clearance Sle...
Page 13 - Vertical Sidewall Installation; Install spacer springs.; Install the 4” flex then 7” flex to the termination.; Below Grade Installations
10009459 13 Brookhaven Direct Vent Gas Fireplace STEP 7 Apply high temperature sealant to 4” (102 mm) and 7” (178 mm) collars or the termination one inch away from the end. Guide the vent termination’s 4” and 7” collars into their respective vent pipes. Double check that the vent pipes overlap the c...
Page 14 - Below grade installation.
Brookhaven Direct Vent Gas Fireplace 14 10009459 3. Install vent system. See Page 12, Steps 2 through 5.4. Ensure a watertight seal is made around the vent pipe coming through the wall. 5. Apply high temperature sealant caulking (supplied) around the 4” and 7” snorkel collars. 6. Slide the snorkel i...
Page 15 - Minimum termination to roof clearance.; Proceed to plumb for additional openings through the
10009459 15 Brookhaven Direct Vent Gas Fireplace 1234 1234 1 + 2 + 3 + 4 = 270° FP1179 Fig. 24 Maximum elbow usage. FP1029attic insulation shieldfirestop spacers1/28/00 djt Joist Attic Insulation Shield Ceiling Installation Upper Floor 11” (279mm) Firestop Spacer Nails (4) Fig. 26 Place firestop spac...
Page 16 - Elbow; Vent components; Vent Components; Vent components; Venting Components; Venting Components; vent components
Brookhaven Direct Vent Gas Fireplace 16 10009459 Starter Kit - Model 7TDVSK - Sidewall Venting (Twist Lock Pipe) Model 7FDVSK - Sidewall Venting (Flex Vent Pipe) Models 7TDVTK/TV - Hot Touch Termination Kits Model 7TDVTVTK/TV - Cool Touch Termination KitStarter Kit - Model 7TDVSKV - Vertical Venting...
Page 17 - Glass Information; Care must be taken to avoid breakage of the glass.; Operating Instructions; Cast Front Panel; Remove; Window Frame Assembly Removal; Unlock the frame window by pulling the handle of the; Window frame assembly removal.
10009459 17 Brookhaven Direct Vent Gas Fireplace Glass Information Only glass approved by CFM Corporation should be used on this fireplace. • The use of any non-approved replacement glass will void all product warranties. • Care must be taken to avoid breakage of the glass. • Do not operate appliance...
Page 18 - Place ember material on top of burner. Scatter the; Installation of Logs; LOGS; Log Rear; Log Identification Chart
Brookhaven Direct Vent Gas Fireplace 18 10009459 6. Place the log front (J12). Place the two underside holes of the log over the two pin studs of the bracket on the left and right sides of the front burner hous-ing. (Fig. 32) 7. Place ember material on top of burner. Scatter the ember material over ...
Page 19 - Large Lava Rock; Flame adjustment knob for SIT valve.; Flame adjustment knob for Honeywell valve.; LO; Honeywell Valve; Flame & Temperature Adjustment; Correct pilot flame appearance.; SIT Pilot; Inspecting the Venting System; Correct burner flame appearance for the 20DVT.
10009459 19 Brookhaven Direct Vent Gas Fireplace Large Lava Rock The large bag of lava rock provided with this fireplace must be placed on the firebox base around the sides of the burner assembly and on the tray beneath the grate. Under no circumstances should this large lava rock be placed on any par...
Page 20 - FOR YOUR SAFETY READ BEFORE LIGHTING; WHAT TO DO IF YOU SMELL GAS; To Turn Off Gas To Heater; Lighting and Operating Instructions; Lighting Instructions; Euro SIT
Brookhaven Direct Vent Gas Fireplace 20 10009459 3. Open louvre assembly bottom.4. Push in gas control knob slightly and turn clock- wise to “OFF”. Do not force. 5. Close control access panel. 1. STOP! Read the safety information above. 2. Turn off all electrical power to the fireplace.3. For MN/MP/T...
Page 21 - SIT NOVA 820 MILLIVOLT VALVE; Troubleshooting the Gas Control System; SYMPTOM
10009459 21 Brookhaven Direct Vent Gas Fireplace NOTE: Before troubleshooting the gas control system, be sure external gas shut off is in the “On” position. SIT NOVA 820 MILLIVOLT VALVE Troubleshooting the Gas Control System WARNING: REMOVE GLASS FRONT BEFORE DOING ANY GAS CONTROL SERVICE WORK. SYMP...
Page 22 - Fuel Conversion Instructions; Conversions must be completed by qualified personnel; Remove mounting screws, pressure regulator tower; SIT; Burner Orifice Conversion; Burner housing assembly.
Brookhaven Direct Vent Gas Fireplace 22 10009459 Fuel Conversion Instructions To convert the 20DVT unit for use with a different gas follow these instructions. Before proceeding, turn control knob on valve to “ OFF ” and turn gas supply OFF . Turn OFF any electricity that may be going to the applian...
Page 23 - Gas Conversion; Remove pilot orifice.; Pilot Orifice Conversion; Turn the gas supply valve and gas valve on and test; Back burner housing.
10009459 23 Brookhaven Direct Vent Gas Fireplace CO106a DV360/580 Gas Conversion Pilot2 1/28/00 djt Fig. 42 Remove pilot orifice. CO106a Snap Ring Index Tab Allen Wrench CO105aDV360/580Gas ConversionPilot1/28/00 djt Fig. 41 Remove pilot hood. CO105a Pilot Hood Pilot Bracket Pilot Orifice Conversion 1....
Page 24 - Burner and Burner Compartment; Cleaning the Standing; If repair is necessary, it should be per-; Maintenance
Brookhaven Direct Vent Gas Fireplace 24 10009459 Burner and Burner Compartment It is important to keep the burner and the burner compartment clean. At least once per year the logs and lava rock/ember material should be removed and the burner compartment vacuumed and wiped out. Remove and replace the...
Page 25 - Burner Housing Assy
10009459 25 Brookhaven Direct Vent Gas Fireplace CFM Corporation reserves the right to make changes in design, materials, specifications, prices and discontinue colors and products at any time, without notice. 20DVT 1 1a 1b 2 3 4 5 7a,b 8a,b 12 13 9 14 10 16 17 18 20 21 22 24 945920DVT parts5/06 19 1...
Page 26 - Fuel Conversion Kits
Brookhaven Direct Vent Gas Fireplace 26 10009459 20DVT (continued) 7a. Orifice Pilot - Natural 10002268 7b. Orifice Pilot - Propane 10002269 8a. Pilot Assy. SIT - RN 10002264 8b. Pilot Assy. SIT - RP 10002265 9. Pilot Tubing w/Fittings SIT 10001296 10. Remote Switch Wire Assy. 20010345 11. Manifold Tu...
Page 27 - Remote Controls; Model; Ceramic Refractory Panels; Installation Instructions; Optional Trim Kits; MUST BE; Optional Cabinet; Rear ceramic panel placement.; Optional Accessories Available
10009459 27 Brookhaven Direct Vent Gas Fireplace Remote Controls Optional remote control units are available to control different functions of the appliance. Model Functions Controlled RC1 ON/OFF RC2 ON/OFF and Temperature IMTFK Wall mounted thermostat control Ceramic Refractory Panels NOTE: The cer...
Page 31 - IF WARRANTY SERVICE IS NEEDED...; ) Contact your supplier. Make sure you have your warranty,; LIMITED LIFETIME WARRANTY; PRODUCT COVERED BY THIS WARRANTY
10009459 31 Brookhaven Direct Vent Gas Fireplace BASIC WARRANTY CFM Corporation (hereinafter referred to collectively as the Company) warrants that your new Vermont Castings or Majestic Gas Fireplace/ Stove is free from manufacturing and material defects for a period of one year from the date of pur...
Page 32 - Efficiency Ratings; EnerGuide Ratings; CFM Corporation
Efficiency Ratings EnerGuide Ratings D.O.E. Model Fireplace Efficiency (%) Steady State (%) (AFUE%) 20DVTRN 60.1 80 64 20DVTRP 60.1 81 64 410 Admiral Blvd. • Mississauga, Ontario, Canada L5T 2N6 800-668-5323 • www.cfmcorp.com CFM Corporation