Honeywell ADVBLE - Manuals
Honeywell ADVBLE – Manual, User Manual in PDF format online.
Manuals:
Manual Honeywell ADVBLE
Summary
ADVANCED CONTROLLER - MOUNTING INSTRUCTIONS 2 31-00553-02 3. DIMENSIONS NOTE: All the dimensions are in inches (mm). For wiring adapter dimension drawing please refer the Comfortpoint Niagara Advanced Plant Controller Product Datasheet -31-00583 and Optimizer Advanced Controller Product Datasheet -3...
3 ADVANCED CONTROLLER - MOUNTING INSTRUCTIONS 31-00553-02 4. MOUNTING PRECAUTIONS The controllers and wiring adapter support both horizontal and vertical DIN rail mounting on a vertical surface. Do not mount on a horizontal surface. DIN Rail end stop 5. MOUNTING THE CONTROLLER ON A WALL OR PANEL DIN...
4 ADVANCED CONTROLLER - MOUNTING INSTRUCTIONS 31-00553-02 6. Hold the controller in an orientation such that the red clip is facing downwards and towards the DIN rail. Controller DIN Rail Red Clip 7. Mount the controller onto the DIN rail and push all red clips in to secure it in place. 8. Connect t...
ADVANCED CONTROLLER - MOUNTING INSTRUCTIONS 5 31-00553-02 10. Insert the screws into the bottom hole and fasten them with a screwdriver. Screw Panel/Wall Controller Anchor 11. Connect the terminal wires, and Ethernet cables. 12. Replace the terminal covers. 13. Replace the Protective Cover if no IO ...
6 ADVANCED CONTROLLER - MOUNTING INSTRUCTIONS 31-00553-02 Installing the Local Antennas Directly to the Controller (Non-Metal Enclosure) 1. Insert the local antennas into the SMA connectors. 2. Tighten by turning the base of the antenna clockwise. Local Antenna SMA Connector SMA Connector 9. ANTENNA...
ADVANCED CONTROLLER - MOUNTING INSTRUCTIONS 7 31-00553-02 10. MOUNTING THE WIRING ADAPTER ON THE DIN RAIL NOTE: Use the Wiring Adapter to extend 24 VAC/ VDC power and comms to the next DIN rail or to 24 VAC/VDC power and comms to a remote IO module. 1. Remove the adapter cover by pulling out the cov...
8 ADVANCED CONTROLLER - MOUNTING INSTRUCTIONS 31-00553-02 12. REMOVING THE CONTROLLER FROM THE DIN RAIL 1. Switch off the power supply. 2. Remove the Terminal Covers and Protective Cover if applicable. 3. Disconnect all the controller’s communication and power supply terminals. 4. Hold the controlle...
ADVANCED CONTROLLER - MOUNTING INSTRUCTIONS 9 31-00553-02 SPECIFICATIONS OF THE CONTROLLER POWER CONSUMPTIONCONTROLLER POWER CONSUMPTION CURRENT CONSUMPTION 24 VAC 24 VDC 24 VAC 24 VDC N-ADV-134-H Max. 36 VA Max. 13 W 1500 mA 540 mA N-ADV-133-H-BWA N-ADV-133-H-BWE N-ADV-133-H-BWW Max. 38 VA Max. 14 ...
10 ADVANCED CONTROLLER - MOUNTING INSTRUCTIONS 31-00553-02 WARNING Electrical Shock Hazard. Can cause severe injury, death, or property damage. Disconnect the power supply before beginning installation to prevent electrical shock and equipment damage. More than one power supply may have to be discon...
By using this Honeywell literature, you agree that Honeywell will have no liability for any damages arising out of your use or modification to, the literature. You will defend and indemnify Honeywell, its affiliates and subsidiaries, from and against any liability, cost, or damages, including attorn...
User Manual Honeywell ADVBLE
Summary
Advanced Plant Controller Installation Instruction and Commissioning Guide 2 TABLE OF CONTENT General Safety Information ...................................................................................... 7 Safety Information as per EN61010-1 (EN60730-1 certification is under process) ..............
ADVANCED PLANT CONTROLLER 7 31-00584-02 GENERAL SAFETY INFORMATION • When performing any work (installation, mounting, start-up), all manufacturer instructions and in particular the Installation and Commissioning Instructions (31-00584-02) are to be observed. • The Niagara Advanced Plant Controllers...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 8 REGULATIONS FCC Regulation This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: 1. This device may not cause interference. 2. This device must accept any inte...
ADVANCED PLANT CONTROLLER 9 31-00584-02 • This device requires significant technology engineering expertise to understand the tools and relevant technology unavailable to the average consumer. Only a person professionally trained in the technology is competent. • This device is not directly marketed...
ADVANCED PLANT CONTROLLER 10 31-00584-02 TECHNICAL INFORMATION Trademark • Spyder™ is a trademark of Honeywell International Inc. • BACnet® is a registered trademark of ASHRAE Inc. • Sylk™ is a trademark of Honeywell International Inc. Product Description N-ADV-133-H-B-W, N-ADV-133-H-B, N-ADV-133-H,...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 11 Default IP Address NOTE: NOTE: Based on Ethernet port selection the IP address will change. See “Advanced Plant Controller Interface” on page 22. For RNDIS IP address,See “RNDIS Driver” on page 45. The WIFI IP ...
ADVANCED PLANT CONTROLLER 12 31-00584-02 NIAGARA LICENSE Advanced Controller should have the Niagara license before use. The license determines the number of points the controller can monitor and the duration of a software update agreement. Get the Advanced Controller Niagara License and Certificate...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 13 NIAGARA HELP DOCUMENTS Niagara installed PC will have a library of Niagara documentation as a part of installation. User can access these documents in two ways. • To access the Niagara Help system • To access t...
ADVANCED PLANT CONTROLLER 14 31-00584-02 To access the Niagara Help documents Niagara documents are stored in the “C drive” while installing the Niagara software. You can check the document by navigating to below drive folder. Figure 4. Niagara Help document folder NOTE: NOTE: The folder name may ch...
ADVANCED PLANT CONTROLLER 15 31-00584-02 POWER SUPPLY Transformers Honeywell Transformers A transformer can power the Advanced Plant Controller. When determining total current consumption and selecting the appropriate transformer, consider the number of connected modules, accessories, and field devi...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 16 Example 1: Power Supply via Controller Using Panel Module • 24 V actuator connected to an analog output module. • Actuator less than 100 m away from the controller. Figure 5. Power supply of field devices via P...
ADVANCED PLANT CONTROLLER 17 31-00584-02 WIRING AND SET-UP General Safety Considerations • When connecting the Advanced Plant Controller, VDE, National Electric Code (NEC) or equivalent, and any local regulations concerning grounding must be observed. • Only qualified electricians may carry out elec...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 18 Connecting Power Supply Connect the power supply to the power supply terminals of the Advanced Plant Controller. See “Power supply” on page 15. The factory default controller must be powered ON for a minimum of...
ADVANCED PLANT CONTROLLER 19 31-00584-02 Cable Specifications Power Supply Cable Specifications The length of the power supply cable includes the length of the cables to connected modules. NOTE: NOTE: The supply voltage must, in any case, be at least 19.2 VAC (24 VAC -20%). Field Device Power Supply...
ADVANCED PLANT CONTROLLER 20 31-00584-02 EARTH GROUNDING Advanced Plant Controller and SELV To avoid the distribution of noise or earth ground potential differences over networks or other connections, the Advanced Plant Controller is designed to comply with SELV. Furthermore, SELV offers the greates...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 21 Functional EMC Grounding • Use a cable as short as possible for grounding: min 1.5 mm 2 (16 AWG). • For connection details, refer to the following example. EXAMPLE Connecting a single transformer with multiple ...
ADVANCED PLANT CONTROLLER 22 31-00584-02 INTERFACES The Advanced Plant Controller can communicate with a wide range of devices and systems with its interfaces and is configurable for a variety of protocols. Figure 9. Advanced Plant Controller Interface HMI LED HMI LED indicates the connection status...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 23 Wi-Fi LED LEDs indicate the transmission and reception of Wi-Fi. Applicable only for the controller N-ADV-133-H-B-W and N-ADV-133-H-B. Default mode Green Blinking every 100ms After Controller Power Cycle Enhanc...
ADVANCED PLANT CONTROLLER 24 31-00584-02 RING LED The Advanced Plant Controller is built with a Ring LED to indicate the operational status of the controller. When a controller restarts successfully, the Ring LED operates in the following pattern: • Two blinks with a reduced delay between the blinks...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 25 GENERAL INFORMATION ON THE RS485 STANDARD RS485 LEDs These LEDs indicate the transmission and reception of data by the three RS485 interfaces. Default mode: User has not added the ledplatformService to the plat...
ADVANCED PLANT CONTROLLER 26 31-00584-02 BACnet MS/TP Enhanced mode Yellow Solid Some devices are down in Database Red Solid All devices are down in Database Green Solid At least 1 device added in Database and some IO points to Point database in Fast Ping Frequency Green Solid At least 1 device adde...
ADVANCED PLANT CONTROLLER 28 31-00584-02 Modbus Table 17. Behavior and meaning of RS485 LEDs for Modbus protocol Mode Color (All RS485) Status Description Default mode NO OFF Port Configured NA NA Port Configured and Discovery Green Continuous blink at 100ms rate based on Ping Frequency Port Configu...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 29 Mbus Enhanced mode Green Solid At least 1 device added in Database and some IO points to Point database in Slow Ping Frequency Green Solid After Station Restart Green Solid After Controller Reboot Green Solid A...
ADVANCED PLANT CONTROLLER 30 31-00584-02 According to the RS485 standard (TIA/EIA-485: “Electrical Characteristics of Generators and Receivers for Use in Balanced Digital Multipoint Systems”), only one driver communicating via an RS485 interface may transmit data at a time. Further, according to U.L...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 31 For information on wire gauge, max. Permissible cable length, possible shielding and grounding requirements, and the maximum number of devices connected to a bus refer to standard EIA-485. Communication Baud Ra...
ADVANCED PLANT CONTROLLER 32 31-00584-02 Connection to Buses NOTE: NOTE: - The communication rate across each communication interface depends on the given communication protocol. - RS485-4 is only applicable to N-ADV-134-H controller. - * The N-ADV-133-H series and N-ADV-134-H series controller can ...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 33 TERMINATOR SWITCH Terminators: The RS-485 bus must be terminated at each end with a resistor matched to the cable characteristic impedance (i.e. ±1%, ¼ Watt, range 100 to 130 ohms). If the RS485 of Advanced Pla...
ADVANCED PLANT CONTROLLER 34 31-00584-02 Service Button/Service Alarm LED The Advanced Plant Controller has a physical service button to reset the device to factory default. Figure 11. Service Button In most cases, a factory reset can be achieved while keeping power on to the Advanced Plant Controll...
ADVANCED PLANT CONTROLLER 36 31-00584-02 Abort/Fail Factory reset: There are two cases when the factory reset will get abort/fail. Case 1: The factory reset will fail/abort when the Service button is pressed more than 15 seconds (Service button is not released). Figure 13. Abort/Fail Factory Reset o...
ADVANCED PLANT CONTROLLER 37 31-00584-02 TERMINAL ASSIGNMENT Table 22. Terminal assignment Type Term inal Signal Description N-AD V-134-H N-AD V-133-H-B-W N-AD V-133-H-B-W N-AD V-133-H N-AD V-112-H RS485-1 1 GND1 GND for RS485 interface 1 2 RS485-1(-) (-) for RS485 interface 1 3 RS485-1(+) (+) for R...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 38 CONTROLLER TERMINAL Figure 15. Controller Terminals Power & Com Port RJ11 RS485_H Communication and power supply (5Vdc) Interface for HMI Table 22. Terminal assignment (Continued) Type Term inal Signal Desc...
ADVANCED PLANT CONTROLLER 39 31-00584-02 FLOW CHART OF COMMISSIONING AND SETUP WORK FLOW To commission the controller, follow any one of the work flow explained in the two work flow. • Work Flow 1 • Work Flow 2 Work Flow 1 Follow the below mandate process for commissioning the Advanced Plant Control...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 40 Table 23. Links of Flow chart for Work Flow 1 Mandatory Steps Optional Steps “Installation” on page 11. Refer Mounting Instructions - 31-00553 “Connecting Power Supply” on page 18. • “Power supply” on page 15. ...
ADVANCED PLANT CONTROLLER 41 31-00584-02 Work Flow 2 Follow the below mandate process for commissioning the Advanced Plant Controller. Refer the table for Optional process and follow the recommended step. NOTE: NOTE: In the flow chart the mentioned steps are topics or headings not a process. So for ...
ADVANCED PLANT CONTROLLER 43 31-00584-02 Open an Existing Platform (Controller Platform) Open the Controller platform with the controller IP address. See “Open an Existing Platform” on page 56. Open a New Platform See “Open a New Platform” on page 52. Commission See “Commissioning the Advanced Plant...
ADVANCED PLANT CONTROLLER 44 31-00584-02 CONNECT THE NIAGARA-INSTALLED PC In order to access (with a laptop or computer) the controller via Ethernet/IP for the first time, the default passwords are used. For IP connections, you may employ any one of the following two options: Option 1: USB 2.0 Devic...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 45 Front USB/Ethernet interface All models of the Advanced Plant controller are equipped with a USB 2.0 Device interface at the front, which is an Ethernet over the USB connection. After connecting the controller ...
ADVANCED PLANT CONTROLLER 46 31-00584-02 How to Enable RNDIS driver in the Advanced Plant Controller The permanent IP address of this USB interface is 192.168.255.241 (Controller). Procedure: 1. Power up the Controller. Connect the Advanced Plant Controller to computer with the USB cable. Figure 19....
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 47 3. Double click on Remote NDIS Compatible Device (Ethernet X is an example, can be changed based on your Ethernet port number) Ethernet X Status dialogue box appears. Click Properties . Figure 21. Ethernet Stat...
ADVANCED PLANT CONTROLLER 48 31-00584-02 5. Internet Protocol Version 4 (TCP/IPv4) dialogue box appears. Select Use the following IP address . Configure the IP address of your computer. Type the IP address in the IP address section exam - ple,.192.168.255.XX. Replace the XX with the desired number e...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 49 To connect to the Niagara-installed PC using Ethernet port: 1. Ensure that the Advanced Plant Controller is powered OFF. See “Power supply” on page 15. 2. Connect the PC (Niagara Installed) to the Advanced Plan...
ADVANCED PLANT CONTROLLER 50 31-00584-02 3. Power up the Advanced Plant Controller. See “Power supply” on page 15. NOTE: NOTE: After powering up the Advanced Controller to check the communication, ping the controller with the Default IP Address from the PC. Go to the command prompt and type "pin...
ADVANCED PLANT CONTROLLER 51 31-00584-02 GETTING STARTED Configuring the Advanced Plant Controller is a mandatory step to avail of the feature and use the plant controller. Before configuring the Advanced Plant Controller, connect the plant controller to BACnet and connect your supervisor's workstat...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 52 Open a New Platform To open and connect to a platform of controller follow below procedure or user can open and connect to local platform in the computer and then copy the station to the controller later See “C...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 56 12. Platform created and below window will be displayed. Figure 35. Host and Platform Window Host ID (IP address) with Platform is created. 13. Proceed with Commissioning the Advanced Plant Controller . Open an...
ADVANCED PLANT CONTROLLER 57 31-00584-02 3. Click OK . The Authentication dialogue is displayed: Figure 37. Authentication Dialogue Box 4. Enter the credentials Username and Password for the Advanced Plant Controller. NOTE: NOTE: Use your Platform credentials which are given while creating the Platf...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 58 Commissioning the Advanced Plant Controller The commissioning process is a necessary step for the new controller or existing controller after completing the changes in the Niagara workbench. The first time Adva...
ADVANCED PLANT CONTROLLER 59 31-00584-02 2. Commissioning dialogue box displayed. Select the options based on the commissioning requirement and click Next . For new controller select only set enabled runtime profile and Sync with my local system date and time . Figure 39. Commissioning Dialogue Box ...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 60 4. Click Next . Licensing dialogue box is displayed. Figure 41. Commissioning Dialogue Box for License 5. Click Add to select a license.See “Niagara License” on page 12. Figure 42. Select File Dialogue Box 6. N...
ADVANCED PLANT CONTROLLER 61 31-00584-02 7. Click OK . Figure 43. Licensing Dialogue Box 8. Commissioning dialogue box for Enable Runtime Profiles is displayed. Figure 44. Enable Runtime Profiles Dialogue Box NOTE: NOTE: Based on the commissioning wizard selected options (Step 2), the commissioning ...
ADVANCED PLANT CONTROLLER 63 31-00584-02 13. Click Next. After displaying a “Analyzing” messages the wizard will show a list of software that will be installed: Figure 46. Software Installation Dialogue Box NOTE: NOTE: If required, you can review the list of software items that will be installed on ...
ADVANCED PLANT CONTROLLER 67 31-00584-02 27. Commissioning the Advanced Plant Controller Finished! IMPORTANT: The Advanced Plant Controller will go through reboot cycles three times during the commissioning process. Do not turn Off Power to the controller during this time - Doing So May cause errors...
ADVANCED PLANT CONTROLLER 69 31-00584-02 Copy a Station using Station Copier Once you have created a station it must be copied to the Advanced Plant Controller using the following procedure. To copy a station: 1. Make a platform connection to the Advanced Plant Controller - See “Open an Existing Pla...
ADVANCED PLANT CONTROLLER 71 31-00584-02 7. Wait until the message 'Transfer complete' appears. 8. Click Close Window . The Open Application Director dialogue box is displayed: Figure 61. Open Application Director Dialogue Box 9. Click Yes and the application director is displayed with the station t...
ADVANCED PLANT CONTROLLER 73 31-00584-02 Configure TCP/IP Settings The initial configuration of the Advanced Plant Controller Ethernet ports can be performed as part of the commissioning wizard - See “Commissioning the Advanced Plant Controller” on page 58. If this step was skipped, or if the settin...
ADVANCED PLANT CONTROLLER 75 31-00584-02 Import Licenses into License Manager The License Manager lets you install (import) licenses and certificates to a remote platform, sourced either from your Workbench PC or the Niagara licensing server. You can also view the contents of licenses and certificat...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 76 Change Date and Time Platform Administration for a Windows-based platform is different from the same for a controller. Change Date/Time from the Platform Administration to sync with system time. 1. Go to Platfo...
ADVANCED PLANT CONTROLLER 77 31-00584-02 INSTALL ADDITIONAL DRIVERS If you have purchased additional 3rd party drivers that you did not install when the Commissioning was done, they must be installed before they can be used. If the driver is an additional purchase not included in your original licen...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 78 SETUP AND CONFIGURING ADVANCED PLANT CONTROLLER To configure the Advanced Plant Controller or update the controller, services need to be enabled. Enable HonPlantControllerService IMPORTANT: Follow step 1 to ste...
ADVANCED PLANT CONTROLLER 79 31-00584-02 3. Select the module honPlantController from the list or type the module name in the input field to open the pal - ette, and then click OK . To select multiple modules, hold the Ctrl key on the keyboard and select the required modules. This adds the selected ...
ADVANCED PLANT CONTROLLER 81 31-00584-02 7. Open a Station - See “Open the Station” on page 72. , if the station is already created or create a station See “Set up a Station” on page 67. NOTE: NOTE: After opening the station Commission the controller - See “Commissioning the Advanced Plant Controlle...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 82 Figure 81. Property Sheet Window The HonPlantControllerService is enabled. Setup HMI PIN. Refer HMI Driver Guide - 31-00590. Drop2 V1.2 31JAN24
ADVANCED PLANT CONTROLLER 83 31-00584-02 Enable LED Behavior The status of the Advanced Plant Controller and its feature status are shown with the different color indication. To identify the status visually, user should enable the LED behavior. To enable the LED behavior in th Advanced Plant Control...
ADVANCED PLANT CONTROLLER 85 31-00584-02 6. Drag & Drop the Ledplatformservices to PlatformServices . Figure 84. Drag and Drop Services Led behavior enabled! Repeating the Commissioning is not required. Drop2 V1.2 31JAN24
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 86 Email setup Configuring a system to send and receive email involves adding the email-related components to the Services container and configuring EmailRecipient components. Email components are available in the...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 88 Configuring the EmailRecipient Two EmailRecipient components send email from the system. One is in the email palette. This component manages alarms that are configured to be sent via email. The second is in the...
ADVANCED PLANT CONTROLLER 89 31-00584-02 Securing email Niagara supports secure outgoing and incoming email using TLS (Transport Layer Security). Prerequisites: The EmailService is in your Services container with both IncomingAccount and OutgoingAccount components. If not, add the EmailService compo...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 90 RSTP Configuration The Rapid Spanning Tree Protocol (RSTP) configures the Port State of each Bridge Port in the Bridge Local Area Network. RSTP is faster than STP in terms of convergence when topology changes o...
ADVANCED PLANT CONTROLLER 91 31-00584-02 Figure 89. RSTP Configuration Properties Table 28. RSTP Parameters Property Description Override Platform Config On Startup Allows the user to control how and when the RSTP configuration should be copied to the platform. • Always : The RSTP configuration in t...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 94 Switch Port Configuration The Advanced Plant Controller (N-ADV-133 series & N-ADV-134-H) has a 3-port Ethernet IP switch. The Switch Port Configuration property sheet allows the user to configure the ports....
ADVANCED PLANT CONTROLLER 95 31-00584-02 2. In the Override Platform Config box specify whether the Ethernet port configuration in the station overwrites the Ethernet port configuration in the platform. • Always - The Ethernet port configuration from the station will be copied to the platform each t...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 96 Figure 93. Switch Port Configuration Properties Table 29. Switch Port Configuration Property Property Description Enable Switch Port 1(left) is read only and always enabled, this prevents the port from being di...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 98 MAC Address Filter Enables/Disables MAC addresses filtering. • Enabled - Only devices whose MAC address listed in the Allowed MAC Address property will be able to communicate with the controller. • Disabled(def...
ADVANCED PLANT CONTROLLER 99 31-00584-02 Once the changes to the Switch Port Configuration are saved in the property sheet, the switch configuration will be saved in controller platform. Cable Diagnostics Read only. Displays the cable diagnostics status for all the four cable pairs. • Pair Status - ...
ADVANCED PLANT CONTROLLER 101 31-00584-02 NOTE: NOTE: If the Config Status of switch port configuration enters the fault state because of changes made by user, the changes will not be written to the platform. Once the Config Status returns to OK state i.e. configuration errors are corrected, all the...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 102 Whether these devices can communicate successfully with the Advanced Plant Controller depends on the configuration of MAC Address Filter and allowed MAC Addresses. When the MAC Address Filter set to Enable, on...
ADVANCED PLANT CONTROLLER 103 31-00584-02 After the aging time (300s ~ 360s), if there is no communication between the devices and the Advanced Plant Controller. The devices MAC address in the daisy chain connection will disappear from the Connected Device MAC Address list. Figure 99. Switch Port Co...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 104 HMI Device Configuration Advanced Plant Controller supplies power to HMI device. HMI device is connected to the Advanced Plant Controller with an RJ11 cable and configured by enabling the HMI device service in...
ADVANCED PLANT CONTROLLER 105 31-00584-02 BACNET NETWORK BACnet (Building Automation Control network) is a data communication protocol developed by ASHRAE (American Society of Heating, Refrigerating, and Air Conditioning Engineers) for managing building automation devices. The BACnet driver uses the...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 106 Enable Routing Enable the routing in both workbench and controller. NOTE: NOTE: Routing can be possible from Controller to Controller or Workbench to Controller. Enable Routing in the Advanced Plant Controller...
ADVANCED PLANT CONTROLLER 109 31-00584-02 Add MS/TP Devices in the Advanced Plant Controller 1. Add the MS/TP devices to the Advanced Plant controller to one of the RS485 (RS485-1, RS485-2, RS485-3, RS485-4 or RS485-R). See See “Connection to BACnet MSTP Buses with Shielding as Return path” on page ...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 110 5. The devices will appear in the Discovery section. Figure 9. BacnetNetwork Banet Device Manager view 6. Drag and drop the devices to the Database . NOTE: NOTE: The Network number (Example: 7722 in the figure...
ADVANCED PLANT CONTROLLER 111 31-00584-02 Tuning the BACnet properties When the BACnet network is added in the Advanced Plant Controller, the controller BACnet properties will be default state. Tune the properties helps to increase the performance and reduce the load in controller. Before tuning som...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 112 Tuning Local Device Property Configure the Apdu Timeout and Number Of Apdu Retries based on the application size and number of devices connected to the network to enhance the performance of the controller. 1. ...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 114 CONFIGURING PORTS TO ENABLE WEB SERVER FUNCTION The Advanced Controller provides webserver functionality, e.g., for using the Niagara Supervisor. In order to use webserver functions, the http and https standar...
ADVANCED PLANT CONTROLLER 115 31-00584-02 2. Expand the Http port, Https Port options, and Enable “ true ” the options. Figure 102. Enable Http and Https Options Figure 103. Http Port and Https Port Options 3. Change Http Port to 444 and the Https Port to 81 (The values are provided as an example). ...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 116 WIFI CONFIGURATION Introduction The Advanced Plant Controller platform feature an integrated IEEE 802.11 module for enabling wireless Ethernet communications to or from the platform. Refer to the “Ordering Inf...
ADVANCED PLANT CONTROLLER 117 31-00584-02 2. Click Honeywell Controller Wireless Configuration from the drop down list. Figure 105. Platform Administration Options 3. Select wifi from the Honeywell Wireless Configuration window. Figure 106. Honeywell Wireless Configuration Window Drop2 V1.2 31JAN24
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 118 4. Expand the WiFi Enabled and enable “ true ” the option. Figure 107. Honeywell Wireless Configuration Window 5. Expand the Country of Operation and select your region. Figure 108. Honeywell Wireless Configur...
ADVANCED PLANT CONTROLLER 119 31-00584-02 Configuring WiFi Access Point mode This procedure describes the steps to configure the controller WiFi subsystem to run in Access Point mode. This configuration can be used either as a network for WiFi enabled field bus devices, or to provide browser or Work...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 120 Configure Access Point Dhcp Server Settings From the Honeywell Controller Wireless Configuration window change the Access Point Dhcp Server Setting parameters. Figure 110. Honeywell Wireless Configuration Wind...
ADVANCED PLANT CONTROLLER 121 31-00584-02 Follow the below procedure to configure the Access Point Dhcp Server Settings : 1. In the DHCP Server Settings pane, in the Client Range Low field, enter the lowest IP address for the range. NOTE: NOTE: The adapter IP should be in the same subnet, but not in...
ADVANCED PLANT CONTROLLER 123 31-00584-02 5. Click the Pairwise Cipher Suites dropdown list and select an encryption suite appropriate for the devices con - necting to this network. 6. To configure a Whitelist , click the Enable Whitelist checkbox and then click the Whitelist button to enter MAC add...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 124 WiFi Access Point for local tool connections In this configuration, the controller Access Point feature is turned on temporarily to provide a browser or Workbench with access to the platform and/or station run...
ADVANCED PLANT CONTROLLER 125 31-00584-02 FIRMWARE UPDATE USING DISTRIBUTION FILE INSTALLER 1. Check the firmware version installed in your Advanced Controller as follows: Open Engineering Tool, go to the Platform - See “Open a Platform” on page 51. Double click on Platform Administration , and chec...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 126 3. Click Choose Directory from below options. Figure 116. Distribution File Installer Window 4. Change Directory dialog box will display. Figure 117. Change Directory Dialogue Box Drop2 V1.2 31JAN24
ADVANCED PLANT CONTROLLER 127 31-00584-02 5. Expand Supervisor version > sw as show in below figure. Figure 118. Change Directory Dialogue Box NOTE: NOTE: Supervisor version may change based on your workbench version and brand. Expand current Supervisor work - bench version which is open. 6. Doub...
ADVANCED PLANT CONTROLLER 129 31-00584-02 9. Distribution File Installer dialog box will be displayed. Click Finish . Figure 122. Distribution File Installer Dialogue Box 10. Installing Distribution dialogue box will be displayed. The software will be installed and the device will reboot. CAUTION CA...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 130 13. After a successful update, the Platform Administration should show the new firmware version in the Niagara Runtime field: Figure 123. Update Successful Drop2 V1.2 31JAN24
ADVANCED PLANT CONTROLLER 131 31-00584-02 CleanDist file Installation The number of Advanced controller CleanDist files has been enhanced to now four CleanDist files. These CleanDist files allow each user to individually clean up the respective controller according to the individual requirements. Fo...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 132 3. Click Choose Directory from below options. Figure 126. Distribution File Installer Window 4. Change Directory dialog box will display. Select cleanDist . Figure 127. Change Directory Dialogue Box Drop2 V1.2...
ADVANCED PLANT CONTROLLER 133 31-00584-02 5. CleanDist files will appear on the Distribution file Installer window as shown in below figure. Select one file (clean1/clean2/clean3/clean4) as per the requirement and click Install . Figure 128. Distribution File Installer Window NOTE: NOTE: Each file h...
ADVANCED PLANT CONTROLLER 135 31-00584-02 ENABLE/DISABLE USB BACKUP AND RESTORE The USB backup and restore function is enabled by default. If this function is required or not required, it must be disabled or enabled. To enable/disable USB backup & restore: 1. Make a platform connection to the Ad...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 136 USB BACKUP AND RESTORE USING SHELL COMMAND Prerequisites: • USB backup and restore support only FAT32 and FAT32X file systems. NTFS is not supported. • Need a USB flash drive with enough memory (Currently, the...
ADVANCED PLANT CONTROLLER 137 31-00584-02 3. Open the shell command view from the Serial Port or Network Port use PuTTY. NOTE: NOTE: Serial line: Check Device Manager from PC/Laptop for communication port (USB port). Speed: 115200 4. Enter the platform User name and password to open the system start...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 138 6. List of options will display. Type the number in “Enter choice:” based on your choice and click Enter . Figure 135. System Shell window NOTE: NOTE: Below actions will trigger based on the choice: Start USB ...
ADVANCED PLANT CONTROLLER 139 31-00584-02 Creating a USB backup To create a USB backup follow above process first See “Enable/Disable USB Backup and Restore” on page 135. and See “USB Backup and Restore using shell command” on page 136. 1. Select and type '1'(Start USB Backup) to auto begin USB Back...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 140 Restoring from a USB backup Restoring from a USB backup returns the controller to the state it was in when the system made the backup. You may restore to a controller other than the one on which the backup was...
ADVANCED PLANT CONTROLLER 141 31-00584-02 4. From the prompt asking if the backup files passphrase is the same as the system passphrase for the controller, type Y (yes) or N (no). NOTE: NOTE: - If Yes, then the system passphrase entered in the earlier step is used to decode the backup. - If No, you ...
ADVANCED PLANT CONTROLLER 142 31-00584-02 AUTOMATIC RESETTING FUSE The 24V~ and 24V0 terminals at RS485-R Interface have an automatic resetting fuse protection. The table below provides a maximum quantity of each IO module type that can be powered from the 24V~ and 24V0 terminals at RS485-R Interfac...
ADVANCED PLANT CONTROLLER 143 31-00584-02 CONNECTION EXAMPLES Connection to Panel Bus I/O Modules Powered by a Separate Transformer This configuration allows the Advanced Plant Controller and the Panel Bus I/O modules to be installed in (several) different wiring cabinets – as long as the max. Permi...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 144 CONNECTION VIA RS485 INTERFACE R Figure 140. Connection (L > 3 m) of RS485 interface R to a Panel Bus NOTE: NOTE: — * The 24V~ and 24V0 terminals at the RS485-R Interface have an automatic resetting fuse pr...
ADVANCED PLANT CONTROLLER 145 31-00584-02 Connection to Panel Bus I/O Modules Powered by the Same Transformer as the Advanced Plant Controller This configuration is suitable for connecting Panel Bus I/O modules located in the same wiring cabinet as the Advanced Plant Controller. CONNECTION VIA RS485...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 146 CONNECTION VIA RS485 INTERFACE R Figure 142. Connection (A + C < 3 m) of RS485 interface R to a Panel Bus NOTE: NOTE: — * The 24V~ and 24V0 terminals at RS485-R Interface have an automatic resetting fuse pr...
ADVANCED PLANT CONTROLLER 147 31-00584-02 Connection to BACnet MSTP Buses with Shielding as Return path Figure 143. Connection (L > 3 m) of RS485 interfaces 1, 2, or 3 (RS485 interface 1 shown) to a BACnet Bus NOTE: NOTE: — Always power the Advanced Plant Controller with a transformer separate to...
ADVANCED PLANT CONTROLLER 151 31-00584-02 Connection to Modbus Modules with Shielding as Return path Figure 147. Connection (L > 3 m) of RS485 interfaces 1, 2, or 3 (RS485 interface 1 shown) to a Modbus NOTE: NOTE: — N = max. 32 unit loads. Always power the Advanced Plant Controller and connected...
ADVANCED PLANT CONTROLLER 153 31-00584-02 Connection to Modbus devices with Shielding as Return path (non-isolated) Figure 149. Connection (L > 3 m) of RS485-R to a Modbus NOTE: NOTE: — N = max. 32 unit loads. Always power the Advanced Plant Controller and connect Modbus modules with sep - arate ...
ADVANCED PLANT CONTROLLER 155 31-00584-02 Connection to a I/O Module Powered by the Separate Transformer Figure 151. Connection (L > 3 m) of RS485-R to a I/O Module-IO Bus NOTE: NOTE: — For communication cable lengths, transmission speeds, and termination, See “General Safety Information” on page...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 156 Connection to a I/O Module Powered by a Same Transformer Figure 152. Connection (L < 3 m) of RS485-R to a I/O Module Bus NOTE: NOTE: — * The 24V~ and 24V0 terminals at the RS485-4 Interface have an automati...
ADVANCED PLANT CONTROLLER 157 31-00584-02 Connection to M-Bus via Level Converter Figure 153. Connection to M-Bus via Level Converter TX 5V GND Iso lation B ar rier RX 5V_ IS O COM R S- 4 85+ RS-4 8 5- 110VAC/230VAC 24V AC 24V AC 110VAC/ 230VAC F1 F2 V+ V- Connection Via RS485 1, 2, 3 R T Terminator...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 158 Connection to HMI Figure 154. Connection of RJ11 interface to a HMI device NOTE: NOTE: Maximum length of RJ11 cable is (L) 3m. RJ11 Customized RJ11 Cable, Length : 3m Advanced Plant Controller 5V Electrics Fus...
ADVANCED PLANT CONTROLLER 159 31-00584-02 MIGRATING AN EXISTING STATION TO ADVANCED CONTROLLER The station which is present in EagleHAWK controller can be migrated to the Advanced Plant Controller using the Niagara workbench. After migration the HMI has to be configured manually from Niagara work be...
ADVANCED PLANT CONTROLLER 161 31-00584-02 TROUBLESHOOTING Troubleshooting with LEDs of RS485 Interfaces 1, 2, 3 Troubleshooting with the Ethernet Interface LEDs Table 35. Advanced Plant Controller Tx and Rx LEDs of RS485 Interfaces 1,2, and 3 Case LED Behavior Meaning Remedy 1 Green (ON) - Solid Bus...
ADVANCED PLANT CONTROLLER INSTALLATION INSTRUCTION AND COMMISSIONING GUIDE 31-00584-02 162 Troubleshooting with Controller configuration Table 37. Advanced Plant Controller Troubleshooting Case Problem Meaning Remedy 1 Station is not running after USB restore. USB restore version is not compatible w...
ADVANCED PLANT CONTROLLER 163 31-00584-02 TECHNICAL LITERATURE Table 35. Technical Literature Title Product Literature Number ComfortPoint Niagara Advanced Plant Controller Product Datasheet 31-00583 Optimizer Advanced Product Datasheet 31-00631 Mounting Instruction 31-00553 Drop2 V1.2 31JAN24
™ ® U.S. Registered Trademark ©2024 Honeywell International Inc. 31-00584-02 Rev. 01-24 Honeywell | Building Automation 715 Peachtree Street, N.E., Atlanta, Georgia, 30308, United States. https://buildings.honeywell.com/us/en The material in this document is for information purposes only. The conten...
Honeywell Manuals
-
Honeywell DT8050A
Installation Manual
-
Honeywell DT8050A
Manual
-
Honeywell DT8050A
User Manual
-
Honeywell DT8050
Manual
-
Honeywell DT8050
User Manual
-
Honeywell TPFIT25WK
User Manual
-
Honeywell TPFIT25AWK
User Manual
-
Honeywell TPFIT32WK
User Manual
-
Honeywell TPFIT32AWK
User Manual
-
Honeywell 24DX47
User Manual
-
Honeywell 24DX47
Manual
-
Honeywell TPFIT50PWK
User Manual
-
Honeywell TPFIT50WK
User Manual
-
Honeywell TPFIT50AWK
User Manual
-
Honeywell TPFIT50APWK
User Manual
-
Honeywell 00010
User Manual
-
Honeywell ADVBLEWIFI
Manual
-
Honeywell ADVBLEWIFI
User Manual
-
Honeywell HAC-8I
User Manual
-
Honeywell RTA 50E
User Manual