Fujitsu C122-E119EN - Manuals
Fujitsu C122-E119EN – Manual in PDF format online.
Manuals:
Manual Fujitsu C122-E119EN
Summary
Preface This manual describes the specifications and installation location requirements of PRIMEQUEST 1000 series installation. The manual is intended for system administrators. For details on the regulatory compliance statements and safety precautions, see the PRIMEQUEST 1000 Series Safety and Regu...
- Trademarks Organization of this manual This manual is organized as follows. CHAPTER 1 Installation Information Chapter 1 provides various useful information on PRIMEQUEST 1000 series installation. The informationincludes device configuration details, device outline drawings, installation specifica...
Title Description Manual code SPARC Enterprise/ PRIMEQUEST Common Installation Planning Manual Provides the necessary information and concepts you should understand for installation and facility planning for SPARC Enterprise and PRIMEQUEST installations. C120-H007EN PRIMEQUEST 1000 Series Hardware I...
Title Description Manual code The Fujitsu Technology Solutions manuals server http://manuals.ts.fujitsu.com/index.php?id=0 MegaRAID SAS Device Driver Installation Provides technical information on using array controllers. Refer to the manual from the SVS-DVD2 supplied with the product or from the fo...
Formal product name Abbreviation Microsoft® Windows Server® 2008 Standard Windows Windows Server 2008 Microsoft® Windows Server® 2008 Enterprise Microsoft® Windows Server® 2008 Datacenter Microsoft® Windows Server® 2008 R2 Standard Microsoft® Windows Server® 2008 R2 Enterprise Microsoft® Windows Ser...
Notes on notations - In this manual, the Management Board and MMB firmware are abbreviated as "MMB." - In this manual, IOBs and GSPBs (LIOBs and LGSPBs within partitions) are collectively referred to as IO Units. - Screenshots contained in this manual may differ from the actual product scree...
- The PDF file of this manual is intended for display using Adobe® Reader® in single page viewing mode at 100% zoom. - The PRIMEQUEST 1800E2/1800E model supports only 200 V power supply. Trademarks - Microsoft, Windows, and Windows Server are trademarks or registered trademarks of Microsoft Corporat...
* The label is affixed at either location. Warning label location (PRIMEQUEST 1800E2/1800E rear) Warning label location (PRIMEQUEST 1800E2/1800E rear) (IOBs removed) PRIMEQUEST 1000 Series Hardware Installation ManualPreface ix C122-H004-07EN
Warning label location (PCI_Box) Notes on Handling the Product Adding optional products For stable operation of the PRIMEQUEST 1000 series server, use only a Fujitsu certified optional product as an added option. Note that the PRIMEQUEST 1000 series server is not guaranteed to operate with any optio...
- Unpacking an optional Fujitsu product, such as an optional adapter, delivered to the customer Modifying or recycling the product Modifying this product or recycling a secondhand product by overhauling it without prior approval may result in personal injury to users and/or bystanders or damage to t...
https://www-s.fujitsu.com/global/contact/computing/PRMQST_feedback.html Warranty If a component failure occurs during the warranty period, we will repair it free of charge in accordance with the terms of the warranty agreement. For details, see the warranty. Before requesting a repair If a problem o...
Contents CHAPTER 1 Installation Information .................................................................................................................. 1 1.1 Device Configuration Details .............................................................................................................
B.4 Cable Connector .................................................................................................................................... 86 Index .............................................................................................................................................
Figures Warning label location (PRIMEQUEST 1800E2/1800E rear) ............................................................................. ix Warning label location (PRIMEQUEST 1800E2/1800E rear) (IOBs removed) .................................................. ix Warning label location (PCI_Box) ....
FIGURE A.17 Outline drawing of the 19-inch rack Model 1624 (base/without stabilizer) ................................ 73 FIGURE A.18 Outline drawing of the 19-inch rack Model 1624 (expansion/with stabilizer) ............................ 74 FIGURE A.19 Outline drawing of the 19-inch rack Model 1624 (...
Tables TABLE 1.1 Device names and configuration details .......................................................................................... 2 TABLE 1.2 PRIMEQUEST 1800E2 installation specifications ........................................................................... 6 TABLE 1.3 PRIMEQU...
CHAPTER 1 Installation Information This chapter provides various useful information on PRIMEQUEST 1000 series installation. The information includes device configuration details, device outline drawings, installation specifications, and various layout diagrams. 1.1 Device Configuration Details ........
1.1 Device Configuration Details TABLE 1.1 Device names and configuration details lists device names and configuration details. TABLE 1.1 Device names and configuration details Device name Description of configuration Size (height) PRIMEQUEST 1800E2/1800E Can accommodate up to 4 system boards (up to...
1.2 Outline Drawings of the Devices This section provides outline drawings of each device. - 1.2.1 PRIMEQUEST 1800E2/1800E outline drawings - 1.2.2 PCI_Box outline drawings 1.2.1 PRIMEQUEST 1800E2/1800E outline drawings This section includes outline drawings of the PRIMEQUEST 1800E2/1800E (front, re...
PRIMEQUEST 1800E2/1800E (top view) FIGURE 1.3 PRIMEQUEST 1800E2/1800E (top view) PRIMEQUEST 1800E2/1800E (right side view) FIGURE 1.4 PRIMEQUEST 1800E2/1800E (right side view) 1.2.2 PCI_Box outline drawings This section includes outline drawings of the PCI_Box (front, rear, top, and right side views...
FIGURE 1.5 PCI_Box front view PCI_Box rear view FIGURE 1.6 PCI_Box rear view PCI_Box top view FIGURE 1.7 PCI_Box top view PCI_Box right side view FIGURE 1.8 PCI_Box right side view PRIMEQUEST 1000 Series Hardware Installation ManualCHAPTER 1 Installation Information 5 C122-H004-07EN
1.3 Installation Specifications This section lists the installation specifications of each device. - 1.3.1 PRIMEQUEST 1800E2 installation specifications - 1.3.2 PRIMEQUEST 1800E installation specifications - 1.3.3 PCI_Box installation specifications 1.3.1 PRIMEQUEST 1800E2 installation specification...
Item Description Maximum power consumption/ apparent power Operating Input voltage: 200 V 4.00 kW / 4.21 kVA Standby Input voltage: 200 V 95 W / 126 VA Power factor (*10) 0.95 or more Rush current [A] (Inrush time) (*11) 20 or less Leakage current [mA] (*12) 3.5 or less *1 The dimensions do not incl...
- A = Number of mounted SBs (1 to 4) - B = Number of mounted IO Units (1 or 2) - C = Number of mounted expansion power supply units (0 to 2) *3 If the intake air temperature is high (but within the normal temperature range), the fan enters high-speed mode even when operation is normal. *4 Condensati...
1.4 Installation Area This section shows the installation area and service areas of the PRIMEQUEST 1000 series and PCI_Box. The diagrams assume that the devices are mounted in Fujitsu 19-inch racks. The actual installation and service areas may vary depending on the 19-inch rack with the mounted dev...
1.5 Cooling and Exhaust Air Flows in the Devices This section shows the cooling and exhaust air flows in each device. - 1.5.1 Cooling and exhaust air flows in the PRIMEQUEST 1800E2/1800E - 1.5.2 Cooling and exhaust air flows in the PCI_Box Note An important consideration in the planning for installa...
1.5.2 Cooling and exhaust air flows in the PCI_Box No. Description (1) Air intake (2) Exhaust air (3) Exhaust vent FIGURE 1.13 Cooling and exhaust air flows in the PCI_Box PRIMEQUEST 1000 Series Hardware Installation ManualCHAPTER 1 Installation Information 15 C122-H004-07EN
1.6 Installation Environment This section describes matters regarding the installation environment of equipment. - 1.6.1 Dust - 1.6.2 Corrosive gases - 1.6.3 Seawater (salt damage) 1.6.1 Dust Airborne dust Ensure that airborne dust does not exceed 0.15 mg/m 3 in computer rooms. Most computers are de...
1.7 Security Actions For details on security actions, see "CHAPTER 8 Security Actions" in the SPARC Enterprise/PRIMEQUEST Common Installation Planning Manual (C120-H007EN). PRIMEQUEST 1000 Series Hardware Installation ManualCHAPTER 1 Installation Information 18 C122-H004-07EN
CHAPTER 2 Connection Information This chapter describes the cables used with the PRIMEQUEST 1000 series and provides an overview of cable connections. 2.1 Overview of Connections ........................................... 20 2.2 Signal Cable Connections .......................................... 23...
2.1 Overview of Connections This section describes an overview of connections for the PRIMEQUEST 1000 series. 2.1.1 Overview of Connections (PRIMEQUEST 1800E2) FIGURE 2.1 Overview of device connections (PRIMEQUEST 1800E2) shows an overview of device connections for the PRIMEQUEST 1800E2. FIGURE 2.1 ...
Number in Figure 2.1 Component Description *3 GSPB PRIMEQUEST 1800E2 Up to 2 units can be mounted. *4 MMB PRIMEQUEST 1800E2 Up to 2 units can be mounted. *5 PCI_Box PRIMEQUEST 1800E2 Up to 2 units can be connected. 2.1.2 Overview of Connections (PRIMEQUEST 1800E) FIGURE 2.2 Overview of device connec...
2.2 Signal Cable Connections This section provides a cable connection diagram and a list of signal cables. The section also describes dos and don'ts on cable preparation. - 2.2.1 Basic interfaces and peripheral devices (PRIMEQUEST 1800E2) - 2.2.2 Basic interfaces and peripheral devices (PRIMEQUEST 1...
- The numbers in parentheses ( ) correspond to the cable numbers in TABLE 2.3 Cables (for the basic interfaces and peripheral devices) (PRIMEQUEST 1800E2) . - For a 10GBase-CR cable, use the 10GBase-CR (TWINAX) cable specified for the connected switch product. List of cables Determine the length of ...
No. Name Model name Commercially available types Length CBL-MLLC40 40 m CBL-MLLC50 50 m CBL-MLLD1A Sold separately: 100 m (with cable insulation) Dual LC connector - Dual LC connector 100 m (7) Multimode Fibre Channel cable CBL-MLSB02 Sold separately: Select from lengths of 2, 5, and 15 m. Dual LC c...
FIGURE 2.4 Interface cable connections (for the basic interfaces and peripheral devices) (PRIMEQUEST1800E) Remarks The numbers in parentheses ( ) correspond to the cable numbers in TABLE 2.4 Cables (for the basic interfaces and peripheral devices) (PRIMEQUEST 1800E) . List of cables Determine the le...
No. Name Model name Commercially available types Length CBL-MLSC40 40 m CBL-MLSC50 50 m CBL-MLSA1A Sold separately: 100 m (with cable insulation) Dual LC connector - Dual SC connector 100 m (8) SAS cable PG-CBLA014/ PG-CBLA015/ PG-CBLA016 Sold separately: Select from lengths of 2, 4, and 6 m. miniSA...
FIGURE 2.6 External interface connectors in the PRIMEQUEST 1800E2/1800E main unit (rear view) MMB external interfaces in detail FIGURE 2.7 MMB external interfaces in detail IOB external interfaces in detail PRIMEQUEST 1000 Series Hardware Installation ManualCHAPTER 2 Connection Information 29 C122-H...
FIGURE 2.8 IOB external interfaces in detail GSPB external interfaces in detail FIGURE 2.9 GSPB external interfaces in detail PCI_Box external interfaces in detail PRIMEQUEST 1000 Series Hardware Installation ManualCHAPTER 2 Connection Information 30 C122-H004-07EN
2.3 Power Cable Connections This section shows diagrams of the input power distribution for the PRIMEQUEST 1000 series main unit and the PCI_Box. - 2.3.1 Power cable connections of the PRIMEQUEST 1800E2/1800E - 2.3.2 Power cable connections of the PCI_Box 2.3.1 Power cable connections of the PRIMEQU...
FIGURE 2.12 Redundant power supply configuration (primary power feed, redundant power supply) *1 Power cables (AC#0 to AC#2) are connected to PSUs (PSU#0 to PSU#2) on a one-to-one basis. *2 This change to the power supply configuration requires a redundant power supply (200 V), which must be prepare...
2.3.2 Power cable connections of the PCI_Box This section shows diagrams of the input power distribution for the PCI_Box. Remarks Use the same power configuration for the PCI_Box as that for the main unit, which is either a redundant configuration or dual power feed configuration. 200 to 240 V stand...
FIGURE 2.15 200 to 240 V redundant power supply configuration (primary power feed, redundant powersupply) *1 Power cables (AC#0 to AC#1) are connected to PSUs (PSU#0 to PSU#1) on a one-to-one basis. *2 This change to the power supply configuration requires a redundant power supply (200 V) for the PC...
2.4 Input Power Connection Specifications This section lists the specifications of input power connections. - 2.4.1 PRIMEQUEST 1000 series main unit - 2.4.2 PCI_Box - 2.4.3 Connections between the power distribution box and distribution panel 2.4.1 PRIMEQUEST 1000 series main unit TABLE 2.5 Power ca...
2.6 Shutoff Characteristic of the Customer's Distribution Panel(Only When Connected to the Power Distribution Box) To protect the device when it is connected to the customer's distribution panel through a power distribution box, the breaker of the device (or the power distribution box) must trip bef...
FIGURE 2.20 Distribution panel breaker characteristics PRIMEQUEST 1000 Series Hardware Installation ManualCHAPTER 2 Connection Information 42 C122-H004-07EN
CHAPTER 3 Notes on Carrying In andInstalling the Product This chapter provides notes on carrying in and installing the PRIMEQUEST 1000 series server. 3.1 Elevator Load Conditions ........................................... 44 3.2 Earthquake Preparedness Measures ......................... 45
3.1 Elevator Load Conditions The rack with the device mounted is wider than the average computer. Therefore, to use an elevator to carry in the rack, the rack may need the side boards or doors removed before loading on the elevator. When using an elevator to carry in the rack, see the elevator load ...
3.2 Earthquake Preparedness Measures The purpose of the earthquake preparedness measures is to prevent the computer from falling and breaking, and to ensure operator safety as well as quick system recovery. To prevent damage to the computer system from an earthquake, Fujitsu provides an earthquake c...
APPENDIX A Racks This appendix provides various information on the mounting racks for the PRIMEQUEST 1000 series and PCI_Box. A.1 Rack Mounting ........................................................... 48 A.2 Rack Mounting Requirements ................................... 51 A.3 Fujitsu 19-inch Rac...
A.1 Rack Mounting The PRIMEQUEST 1000 series (including peripheral devices) has been developed and its operation guaranteed with the basic assumption that it is mounted in a Fujitsu 19-inch rack. The requirements in A.1.1 Arrangements for installation work must be satisfied for safe use of a unit mo...
(2) Select a rack. For a rack to be fixed in place, select one that comes without a stabilizer. See "(3) Select a fixed construction" below. For a rack not to be fixed in place, be sure to select one that comes with a stabilizer. See TABLE A.1 Arrangements for installation work . Note For a ...
A.2 Rack Mounting Requirements This section describes rack mounting requirements. - A.2.1 Requirements for mounting in a Fujitsu 19-inch rack - A.2.2 Requirements for mounting in a rack manufactured by another company Note When mounting in the rack, do not hold the cabinet by the handle of a fan. No...
TABLE A.2 Recommended racks for mounting Fujitsu 19-inch rack Depth (mm) Open area ratio Model 2742 1050 80% Model 2737 1050 80% Model 2724 1050 80% Model 2642 1050 80% Model 2624 1050 80% Model 2616 1050 75% Model 1740 1050 80% Model 1640 1050 80% Model 1624 1050 80% TABLE A.3 PRIMEQUEST 1000 serie...
Procedure for removing cable holders (Model 1740) Remove the cable holders by using a Phillips screwdriver. No. Description (1) M5 screw (2) Cable holder (3) Phillips screwdriver FIGURE A.4 Removing a cable holder (Model 1740) Procedure for removing cable holders (Model 1640/Model 1624) Remove the c...
No. Description (1) Cable holder (2) Machine screw (SEMS w/washer screw M5 x 12) FIGURE A.5 Removing a cable holder (Model 1640/Model 1624) A.2.2 Requirements for mounting in a rack manufactured by another company When mounting the PRIMEQUEST products in a rack manufactured by another company, custo...
The device is mounted in a rack using a rack mounting kit (supplied with the PRIMEQUEST 1000 series server). Therefore, the following conditions regarding distance must be satisfied. One condition is the allowable spacing between posts. The second condition is the length from the inside of the front...
FIGURE A.7 Conditions regarding rack posts A: Space for attaching the device front panel: 483 mm (19.0 in.) or more B: Distance between holes on the left and right device mounting posts (common to the front and rear posts): 465 mm (18.3 in.) C: Distance between the left and right posts (common to th...
A.3 Fujitsu 19-inch Racks This section shows the types, outline drawings, and bottom view drawings of Fujitsu 19-inch racks. - A.3.1 Types of 19-inch rack - A.3.2 Outline drawings of 19-inch racks - A.3.3 Bottom view drawings of 19-inch racks Remarks For the outline drawings and dimensions of the mo...
Item No. Model name Product name Width (*1) Depth (*1) Height (*1) Total weight capacity (*2)(*3) Rack weight (*2) Total rack weight (*2) Remarks (expansion/ with stabilizer) (slim) 12 19R-162B2 19-inch rack Model 1624 (expansion/ without stabilizer) (slim) 600 (23.6) 1050 (41.3) 1264 (49.7) 480 (10...
19-inch rack Model 1624 (expansion/without stabilizer) No. Description (1) Top view (2) Rear view (3) Right side view (4) Front view FIGURE A.19 Outline drawing of the 19-inch rack Model 1624 (expansion/without stabilizer) A.3.3 Bottom view drawings of 19-inch racks This section provides bottom view...
APPENDIX B UPC Interface This appendix describes the UPC interface that can be used with the PRIMEQUEST 1000 series. B.1 Overview .................................................................... 82 B.2 Signal Cable .............................................................. 83 B.3 Connection ...
B.1 Overview The CVCF provides a stable power supply to the system even in the event of a power abnormality or major power outage. Through a connection between the CVCF and a UPC port on the main unit with a signal cable, the CVCF can notify the main unit of abnormal power conditions when it detects...
B.2 Signal Cable For the signal cable, use a shielded-pair cable that satisfies the following specifications. - Direct current resistance (round trip/one pair): 400 W/km or lower - Cable length: up to 10 m (33 ft.) PRIMEQUEST 1000 Series Hardware Installation ManualAPPENDIX B UPC Interface 83 C122-H...
B.3 Connection of Main Unit and CVCF and Signal Line Definitions This section shows the connection of the main unit and CVCF. This section also provides definitions of the signal lines. The figure below is a connection diagram of the main unit and CVCF. FIGURE B.2 Connection of the main unit and CVC...
B.4 Cable Connector This section describes the connector type and the correspondence between the UPC interface and the signal cable pins. Connector type D-SUB9 male connector (receptacle: female) Pin assignment The figure below shows the UPC interface and pin assignment of the signal cable. Unused p...
Fujitsu Manuals
-
Fujitsu P42VCA12
Manual
- Fujitsu S500M Manual
-
Fujitsu C1410
Manual
- Fujitsu FI-6140Z Manual
-
Fujitsu P50XHA40U
Manual
-
Fujitsu D1931
Manual
-
Fujitsu PDS5003W
Manual
-
Fujitsu M4099D
Manual
-
Fujitsu P63XHA40U
Manual
-
Fujitsu B6220
Manual
-
Fujitsu M3093DE
Manual
-
Fujitsu ETERNUS DX8000 series
Manual
-
Fujitsu FTP-641MCL352
Manual
-
Fujitsu YV2.4X2.5A-2
Manual
-
Fujitsu FS-1008MU
Manual
- Fujitsu T731 Manual
-
Fujitsu FTP-627MCL113
Manual
-
Fujitsu ETERNUS4000
Manual
-
Fujitsu FMWCC42
Manual
-
Fujitsu FTP-607 Series
Manual