Fujitsu C122-E119EN - Manual

Fujitsu C122-E119EN

Fujitsu C122-E119EN – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
57 Page 57
58 Page 58
59 Page 59
60 Page 60
61 Page 61
62 Page 62
63 Page 63
64 Page 64
65 Page 65
66 Page 66
67 Page 67
68 Page 68
69 Page 69
70 Page 70
71 Page 71
72 Page 72
73 Page 73
74 Page 74
75 Page 75
76 Page 76
77 Page 77
78 Page 78
79 Page 79
80 Page 80
81 Page 81
82 Page 82
83 Page 83
84 Page 84
85 Page 85
86 Page 86
87 Page 87
88 Page 88
89 Page 89
90 Page 90
91 Page 91
92 Page 92
93 Page 93
94 Page 94
95 Page 95
96 Page 96
97 Page 97
98 Page 98
99 Page 99
100 Page 100
101 Page 101
102 Page 102
103 Page 103
104 Page 104
105 Page 105
106 Page 106
107 Page 107
108 Page 108
109 Page 109
Page: / 109

Table of Contents:

  • Page 3 – Preface; installation. The manual is intended for system administrators.; Errata and addenda for the manual; The; For Safe Operation; How to use this manual; location for quick reference.; About this product; Organization and Notation of This Manual; This section describes the following topics:
  • Page 4 – Getting Started Guide
  • Page 5 – Related manuals
  • Page 7 – Abbreviations
  • Page 8 – Notation; italics; Notation for the CLI (command line interface); Command syntax; Remarks
  • Page 9 – Alert messages in the text; List of important alert items; Product operating environment; Note
  • Page 10 – Trademarks; in the United States and/or other countries.; Safety Precautions; This manual does not contain important alert items.; Warning labels; Never remove the warning labels.
  • Page 11 – * The label is affixed at either location.
  • Page 12 – Notes on Handling the Product; Adding optional products; - Newly installing or moving equipment
  • Page 13 – the customer; Modifying or recycling the product; system. Malicious third parties can restore this data.; Support and service; Product and service inquiries; the PRIMEQUEST 1000 series, use the Fujitsu contact line.; Fujitsu contact line
  • Page 14 – Revision History
  • Page 15 – Contents
  • Page 16 – Index
  • Page 17 – Figures
  • Page 18 – FIGURE B.2 Connection of the main unit and CVCF
  • Page 19 – Tables
  • Page 21 – This chapter provides various useful information on PRIMEQUEST
  • Page 22 – Device Configuration Details; TABLE 1.1 Device names and configuration details
  • Page 23 – Outline Drawings of the Devices; This section provides outline drawings of each device.
  • Page 24 – PCI_Box outline drawings
  • Page 25 – PCI_Box right side view
  • Page 26 – Installation Specifications; PRIMEQUEST 1800E installation specifications; PRIMEQUEST 1800E2 installation specifications; TABLE 1.2 PRIMEQUEST 1800E2 installation specifications
  • Page 27 – PRIMEQUEST 1800E installation specifications; TABLE 1.3 PRIMEQUEST 1800E installation specifications
  • Page 29 – PCI_Box installation specifications; TABLE 1.4 PCI_Box installation specifications
  • Page 31 – Installation Area; APPENDIX A Racks
  • Page 34 – Cooling and Exhaust Air Flows in the Devices; Cooling and exhaust air flows in the PRIMEQUEST 1800E2/1800E; Description
  • Page 35 – Cooling and exhaust air flows in the PCI_Box
  • Page 36 – Installation Environment; Dust; Airborne dust; Corrosive gases; TABLE 1.5 Tolerable limits for corrosive gases
  • Page 38 – Security Actions; SPARC
  • Page 39 – This chapter describes the cables used with the PRIMEQUEST 1000
  • Page 40 – Overview of Connections; Overview of Connections (PRIMEQUEST 1800E2); FIGURE 2.1 Overview of device connections (PRIMEQUEST 1800E2)
  • Page 41 – Overview of Connections (PRIMEQUEST 1800E)
  • Page 43 – Signal Cable Connections; External interface connectors in detail; Basic interfaces and peripheral devices (PRIMEQUEST 1800E2); lists the; Cable connection diagram (PRIMEQUEST 1800E2)
  • Page 44 – TABLE 2.3 Cables (for the basic interfaces; List of cables
  • Page 45 – Basic interfaces and peripheral devices (PRIMEQUEST 1800E); Cable connection diagram
  • Page 46 – The numbers in parentheses ( ) correspond to the cable numbers in; Name
  • Page 48 – External interface connectors in detail; MMB external interfaces in detail
  • Page 49 – FIGURE 2.7 MMB external interfaces in detail; IOB external interfaces in detail
  • Page 50 – FIGURE 2.8 IOB external interfaces in detail; GSPB external interfaces in detail; FIGURE 2.9 GSPB external interfaces in detail; PCI_Box external interfaces in detail
  • Page 52 – Power Cable Connections; Dual power feed configuration
  • Page 53 – *3 The power distribution box must be prepared separately.; FIGURE 2.13 Dual power feed configuration
  • Page 54 – Power cable connections of the PCI_Box; configuration or dual power feed configuration.
  • Page 55 – 00 to 240 V dual power feed configuration
  • Page 58 – Input Power Connection Specifications; PRIMEQUEST 1000 series main unit; TABLE 2.6 Power cable specifications of the PCI_Box
  • Page 61 – Distribution panel breaker characteristics
  • Page 62 – FIGURE 2.20 Distribution panel breaker characteristics
  • Page 63 – CHAPTER 3; This chapter provides notes on carrying in and installing the
  • Page 64 – Elevator Load Conditions; TABLE 3.1 Elevator load conditions
  • Page 65 – Earthquake Preparedness Measures; prevents the device from falling by fixing it in place.)
  • Page 67 – A.2 Rack Mounting Requirements
  • Page 68 – Rack Mounting; installation work; Arrangements for installation work; TABLE A.1 Arrangements for installation work
  • Page 70 – during maintenance of any device mounted in the rack.; base or expansion rack.
  • Page 71 – Rack Mounting Requirements; This section describes rack mounting requirements.; Requirements for mounting in a Fujitsu 19-inch rack; Recommended racks for mounting
  • Page 72 – Rack mounting requirements; TABLE A.4 Rack mounting requirements
  • Page 76 – Procedure for removing cable holders (Model 1740)
  • Page 77 – the following structural requirements.; Conditions of rack depth
  • Page 78 – FIGURE A.6 Conditions of rack depth; Conditions regarding rack posts
  • Page 79 – FIGURE A.7 Conditions regarding rack posts; Other conditions; - Cooling of devices mounted in the rack
  • Page 80 – Fujitsu 19-inch Racks; Types of 19-inch rack
  • Page 82 – Outline drawings of 19-inch racks
  • Page 95 – Bottom view drawings of 19-inch racks
  • Page 101 – B.3 Connection of Main Unit and CVCF and Signal Line
  • Page 102 – Overview
  • Page 103 – Signal Cable
  • Page 104 – Connection of Main Unit and CVCF and Signal Line Definitions
  • Page 106 – Cable Connector; Connector type
Loading the manual

C122-H004-07EN

PRIMEQUEST 1000 Series

Hardware Installation Manual

FUJITSU LIMITED

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 3 - Preface; installation. The manual is intended for system administrators.; Errata and addenda for the manual; The; For Safe Operation; How to use this manual; location for quick reference.; About this product; Organization and Notation of This Manual; This section describes the following topics:

Preface This manual describes the specifications and installation location requirements of PRIMEQUEST 1000 series installation. The manual is intended for system administrators. For details on the regulatory compliance statements and safety precautions, see the PRIMEQUEST 1000 Series Safety and Regu...

Page 4 - Getting Started Guide

- Trademarks Organization of this manual This manual is organized as follows. CHAPTER 1 Installation Information Chapter 1 provides various useful information on PRIMEQUEST 1000 series installation. The informationincludes device configuration details, device outline drawings, installation specifica...

Page 5 - Related manuals

Title Description Manual code SPARC Enterprise/ PRIMEQUEST Common Installation Planning Manual Provides the necessary information and concepts you should understand for installation and facility planning for SPARC Enterprise and PRIMEQUEST installations. C120-H007EN PRIMEQUEST 1000 Series Hardware I...

Other Fujitsu Models

All Fujitsu Other