Bunn TB6Q - Manuals

Bunn TB6Q – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11

Summary

Page 3 - INTRODUCTION; CONTENTS; USER NOTICES; WA; OT L; WARNING

Page 3 #00831.0000 #00656.0001 #03408.0000 #03409.0000 #37881.0000 • FILL WATER TANK BEFORE ENERGIZING • DO NOT OVERLOAD CIRCUIT • KEEP AWAY FROM COMBUSTIBLES • DO NOT DEFORM PLUG OR CORD • FAILURE TO COMPLY RISKS EQUIPMENT DAMAGE, FIRE OR SHOCK • BREWER ENERGIZED UNLESS UNPLUGGED SEE INSTRUCTIONS W...

Page 5 - PLUMBING REQUIREMENTS

Page 5 120V MODELS These brewers must be connected to a cold water system with a minimum 1.0 gpm flow rate, and operating pressure between 20 and 90 psi (138 and 620 kPa) from a ½˝ or larger supply line. A shut-off valve should be installed in the line before the brewer. Install a regulator in the l...

Page 8 - AUTO SWEETENER SET-UP

Page 8 AUTO SWEETENER SET-UP CAUTION - The brewer must be disconnected from the power source throughout the Initial Set-Up, except when specified in the instructions. 1. Remove the top lid and both rear panels. 2. Make sure the brewer water supply is off. 3. Connect sweetener hose from the bag in a ...

Bunn Manuals