InfraStruXure System—Installation and Start-Up i About this Manual This manual is intended for APC Field Service Engineers or APC-trained installers of a 60 kW InfraStruXure system. It covers basic installation and start-up. For information about installing specific components in your InfraStruXure ...
Page 5 - Contents
Contents InfraStruXure System—Installation and Start-Up iii Safety ......................................................................1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Save these instructions . . . . . . . . . . . . . . . . . . . . . . ...
Page 9 - Safety; Overview; Save these instructions
InfraStruXure System—Installation and Start-Up 1 Safety Overview Save these instructions This manual contains important instructions that must be followed during installation, operation, and maintenance of the InfraStruXure System. Safety symbols used in this manual Cross-reference symbols used in t...
Page 10 - Warnings; Installation/Maintenance; Maintenance performed while the PDU is receiving input power
2 InfraStruXure System—Installation and Start-Up Warnings Receiving/moving Do not tilt the PDU greater than 45° from its vertical axis. Never lay the PDU on its side. Installation/Maintenance Only a certified electrician can: • Connect the PDU to its power source• Connect a switch to the EPO interfa...
Page 11 - Total Power Off; Main Input; EMI
Safety: Warnings InfraStruXure System—Installation and Start-Up 3 Total Power Off 1. Set the PDU Main Input to OFF. 2. Set the upstream power source feeding the PDU to OFF. Emergency Power Off (EPO) Hazardous voltage from the branch circuit must be isolated from the 24 VAC, 24 VDC, and contact closu...
Page 13 - Site Planning; Dimensions; InfraStruXure PDU
InfraStruXure System—Installation and Start-Up 5 Site Planning Dimensions InfraStruXure PDU NetShelter VX Enclosure PDU Shielding Trough 7.2 in (183 mm) 23 in (584 mm) 23.5 in (597 mm) 34.5 in (876 mm) 81.5 in (2070 mm) 88.8 in (2255 mm) Including PDU Shielding Trough: Without PDU Shielding Trough: ...
Page 14 - Space Considerations
6 InfraStruXure System—Installation and Start-Up Space Considerations Study the figure below to determine your space requirements for installing the InfraStruXure PDU. Consult your local codes and the NEC for additional requirements. 12 3 >12 in (304 mm) Ceiling Clearance Minimum Rear Clearance 2...
Page 15 - Weight Considerations; Component
InfraStruXure System—Installation and Start-Up 7 Weight Considerations Ensure that the floor and sub-floor can support the total weight of the configuration when concentrated on the leveling feet. If you are placing equipment on a raised floor, consult the flooring manufacturer for loading requireme...
Page 16 - Heat Output; Voltage
8 InfraStruXure System—Installation and Start-Up Heat Output Consider the heat dissipation ratings of equipment to determine cooling requirements. Additional cooling equipment may be required. Heat output of the InfraStruXure PDU is shown below. Voltage InfraStruXure PDU with a transformer 208 V inp...
Page 17 - Electrical Requirements and Specifications; Procedures requiring a licensed electrician; Procedures requiring a licensed electrician include:
InfraStruXure System—Installation and Start-Up 9 Electrical Requirements and Specifications Procedures requiring a licensed electrician Electrical requirements Electrical Hazard Procedures requiring a licensed electrician include: • Connection of utility conductors• Installation of a 225-, 90-, or 7...
Page 18 - P D U; S w it c h; U P S
10 InfraStruXure System—Installation and Start-Up Emergency Power Off (EPO) Overview To provide a mechanism for emergency power off, attach a remote switch to the EPO interface on the PDU monitoring unit through the user connection plate. The EPO interface ( ) is connected to the PDU Main Input sw...
Page 19 - Basic Installation Procedure; A licensed electrician must connect the power source.; rating that will support the full weight of the
InfraStruXure System—Installation and Start-Up 11 Basic Installation Procedure This section provides the basic steps that you need to perform when installing InfraStruXure power and rack components. Follow the references provided with each step for detailed instructions. 1. Unpack the components acc...
Page 21 - Installation Procedures; Level the PDU and NetShelter Enclosures
InfraStruXure System—Installation and Start-Up 13 Installation Procedures Level the PDU and NetShelter Enclosures Leveling feet are attached under the enclosure at each corner. The leveling feet can help provide a stable base if the selected floor space is uneven, but they are not intended to compen...
Page 22 - Connect the Power Source to the PDU; Access the PDU Main Input switch
14 InfraStruXure System—Installation and Start-Up Connect the Power Source to the PDU Access the PDU Main Input switch Open the back doors of the PDU, unlock the top, smaller door, using the provided red key, and loosen the two screws holding the larger, hinged door in place. Attach conduit to the P...
Page 24 - Install a circuit breaker; Torque specs and tools required; Terminal
Installation Procedures: Connect the Power Source to the PDU 16 InfraStruXure System—Installation and Start-Up Install a circuit breaker Determine the amperage of circuit breaker that you need to install: Route the input conductors to the Main Input circuit breaker (or switch) 1. Route the input con...
Page 25 - Connect input conductors; A licensed electrician must connect input conductors to the PDU; GEC; 08 V input without a transformer:
Installation Procedures: Connect the Power Source to the PDU InfraStruXure System—Installation and Start-Up 17 Connect input conductors At the Main Input circuit breaker (or switch), connect the input wiring according to the labels on the circuit breaker (or switch) and the illustrations below. See ...
Page 26 - Connect an Emergency Power Off Switch; Connecting the switch.; Configuring and testing.
18 InfraStruXure System—Installation and Start-Up Connect an Emergency Power Off Switch Overview Connecting the switch. The Emergency Power Off (EPO) switch connects to the PDU user connection plate. The figure on the right shows the location of the user connection plate on the roof of the PDU. Conn...
Page 27 - – Contact Closure—Normally Open; Normally
Installation Procedures: Connect an Emergency Power Off Switch InfraStruXure System—Installation and Start-Up 19 Connect an EPO switch to the user connection plate and test the switch 1. Connect the switch to the EPO connection point terminals located on the bottom side of the PDU user connection pl...
Page 28 - Test
Installation Procedures: Connect an Emergency Power Off Switch 20 InfraStruXure System—Installation and Start-Up 3. Test the EPO switch to ensure that it is wired and working correctly: a. Place the Arm/Test rocker switch in the Test position. The EPO state LEDs will be off and the PDU display inter...
Page 29 - Safety warnings
Installation Procedures: Connect an Emergency Power Off Switch InfraStruXure System—Installation and Start-Up 21 Safety warnings Hazardous voltage from the branch circuit must be isolated from the 24 VAC, 24 VDC, and contact closure. 24 VAC and 24 VDC are considered Class 2 circuits as defined in Ar...
Page 31 - How to connect contacts to the PDU Monitoring Unit; Contacts; Relay output specifications
Installation Procedures: Connect User Input Contacts and Relay Outputs InfraStruXure System—Installation and Start-Up 23 How to connect contacts to the PDU Monitoring Unit 1. Choose one or more contact numbers on the user connection plate to which you will connect the contacts. The user connection p...
Page 32 - Shielding Trough accessories.
24 InfraStruXure System—Installation and Start-Up Install Shielding Troughs, Shielding Partitions, and Cable Ladders Shielding Troughs and Shielding Partitions for overhead wiring along rows If you ordered APC Shielding Troughs, Shielding Partitions, and Cable Ladders to route overhead wiring for yo...
Page 33 - Shielding Partitions.; Cable Ladders for overhead wiring across rows
Installation Procedures: Install Shielding Troughs, Shielding Partitions, InfraStruXure System—Installation and Start-Up 25 Shielding Partitions. There are two types of Shielding Partitions, each of which forms a side wall of a trough for data cables. You can customize the width of the trough for ea...
Page 34 - Install InfraStruXure Rack-Mount Devices; Install the Rack Automatic Transfer Switches (ATS)
26 InfraStruXure System—Installation and Start-Up Install InfraStruXure Rack-Mount Devices Install the Rack Automatic Transfer Switches (ATS) Install a Rack ATS in the top of each enclosure for overhead wiring, and in the bottom of each enclosure for wiring under the floor. The Rack ATS is an option...
Page 35 - Route and Attach Overhead Wiring; Route and attach power cables to equipment racks
InfraStruXure System—Installation and Start-Up 27 Route and Attach Overhead Wiring Route and attach power cables to equipment racks If you ordered overhead wiring, connect the prewired power cables of the PDU as follows: 1. Install the Shielding Troughs, Shielding Partitions, and Cable Ladders so th...
Page 38 - Wiring Under the Floor
30 InfraStruXure System—Installation and Start-Up Wiring Under the Floor If you are routing power cables to the enclosures under a raised floor, you must provide the appropriate power cables and equipment for installation, and a licensed electrician must route and connect the power cables to the PDU...
Page 40 - Automatic Transfer Switch
32 InfraStruXure System—Installation and Start-Up Route Data Cables to the InfraStruXure Manager Hub (or Switch) 1. Connect a Cat-5 network cable (provided) to the network or 10Base-T ports on your APC InfraStruXure devices. The following devices need to be connected: 2. Run the connected Cat-5 netw...
Page 42 - Apply power to the system
Start-Up Procedure: InfraStruXure System 34 InfraStruXure System—Installation and Start-Up Apply power to the system 1. Set the upstream input circuit breaker (utility or UPS) to ON. 2. Ensure A-B-C clockwise phase rotation at the top of the Main Input on the PDU, using a phase rotation meter. 3. Se...
Page 43 - distribution panel; Main Output
Start-Up Procedure: InfraStruXure System InfraStruXure System—Installation and Start-Up 35 6. If applicable, set the Main Output circuit breaker on the PDU to ON. 7. Close (turn ON) the PDU distribution panel circuit breakers. Note When the Main Output circuit breaker is closed, the power distributi...
Page 44 - Configure the InfraStruXure Manager
36 InfraStruXure System—Installation and Start-Up Configure the InfraStruXure Manager Once all equipment is installed, the network cables are connected to the InfraStruXure Manager hub (or switch), and start-up of the system is complete, configure the InfraStruXure Manager. See also For instructions...
Page 45 - Appendix A: Operation; How to Apply Power to the System; power source; Main
InfraStruXure System—Installation and Start-Up 37 Appendix A: Operation How to Apply Power to the System This procedure instructs on how to apply power to a system that has already been installed. For initial start-up instructions, see the Start-up section of this manual. 1. Close (turn ON) the main...
Page 47 - How to Ensure Total Power Off
InfraStruXure System—Installation and Start-Up 39 How to Ensure Total Power Off 1. Open (turn OFF) the main circuit breaker on the power source feeding the PDU. 2. Set the Main Input on the PDU to OFF. 3. For PDU with transformer : Set the Main Output circuit breaker on the front of the PDU to OFF.
Page 49 - Appendix B: Changes in This Manual; Changes by page number
InfraStruXure System—Installation and Start-Up 41 Appendix B: Changes in This Manual Overview The following list references the specific changes made to this manual since its last release (990-1638A). General changes An index was added to the end of this manual. See pages 43–44. Changes by page numb...
Page 51 - Index
Index InfraStruXure System—Installation and Start-Up 43 A automatic transfer switch, installing , 25 C cable ladders, installing , 24 circuit breaker size, determining by input voltage , 2 E electrical requirements , 9 Emergency Power Off (EPO) connect the switch , 18 – 20 overview , 10 troubleshoot...
Page 60 - APC Worldwide Customer Support
*990-1638B* APC Worldwide Customer Support Customer support for this or any other APC product is available at no charge in any of the following ways: • Visit the APC Web site to access documents in the APC Knowledge Base and to submit customer support requests.– www.apc.com (Corporate Headquarters) ...