APC 60kW InfraStruXureTM System - Manual

APC 60kW InfraStruXureTM System

APC 60kW InfraStruXureTM System – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
57 Page 57
58 Page 58
59 Page 59
60 Page 60
Page: / 60

Table of Contents:

  • Page 3 – About this Manual; User Manuals; Support
  • Page 5 – Contents
  • Page 9 – Safety; Overview; Save these instructions
  • Page 10 – Warnings; Installation/Maintenance; Maintenance performed while the PDU is receiving input power
  • Page 11 – Total Power Off; Main Input; EMI
  • Page 13 – Site Planning; Dimensions; InfraStruXure PDU
  • Page 14 – Space Considerations
  • Page 15 – Weight Considerations; Component
  • Page 16 – Heat Output; Voltage
  • Page 17 – Electrical Requirements and Specifications; Procedures requiring a licensed electrician; Procedures requiring a licensed electrician include:
  • Page 18 – P D U; S w it c h; U P S
  • Page 19 – Basic Installation Procedure; A licensed electrician must connect the power source.; rating that will support the full weight of the
  • Page 21 – Installation Procedures; Level the PDU and NetShelter Enclosures
  • Page 22 – Connect the Power Source to the PDU; Access the PDU Main Input switch
  • Page 24 – Install a circuit breaker; Torque specs and tools required; Terminal
  • Page 25 – Connect input conductors; A licensed electrician must connect input conductors to the PDU; GEC; 08 V input without a transformer:
  • Page 26 – Connect an Emergency Power Off Switch; Connecting the switch.; Configuring and testing.
  • Page 27 – – Contact Closure—Normally Open; Normally
  • Page 28 – Test
  • Page 29 – Safety warnings
  • Page 31 – How to connect contacts to the PDU Monitoring Unit; Contacts; Relay output specifications
  • Page 32 – Shielding Trough accessories.
  • Page 33 – Shielding Partitions.; Cable Ladders for overhead wiring across rows
  • Page 34 – Install InfraStruXure Rack-Mount Devices; Install the Rack Automatic Transfer Switches (ATS)
  • Page 35 – Route and Attach Overhead Wiring; Route and attach power cables to equipment racks
  • Page 38 – Wiring Under the Floor
  • Page 40 – Automatic Transfer Switch
  • Page 42 – Apply power to the system
  • Page 43 – distribution panel; Main Output
  • Page 44 – Configure the InfraStruXure Manager
  • Page 45 – Appendix A: Operation; How to Apply Power to the System; power source; Main
  • Page 47 – How to Ensure Total Power Off
  • Page 49 – Appendix B: Changes in This Manual; Changes by page number
  • Page 51 – Index
  • Page 60 – APC Worldwide Customer Support
Loading the manual

Installation and Start-Up

60 kW InfraStruXure

TM

System

Large Data Centers

208/480/600 V Input

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 3 - About this Manual; User Manuals; Support

InfraStruXure System—Installation and Start-Up i About this Manual This manual is intended for APC Field Service Engineers or APC-trained installers of a 60 kW InfraStruXure system. It covers basic installation and start-up. For information about installing specific components in your InfraStruXure ...

Page 5 - Contents

Contents InfraStruXure System—Installation and Start-Up iii Safety ......................................................................1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Save these instructions . . . . . . . . . . . . . . . . . . . . . . ...

Page 9 - Safety; Overview; Save these instructions

InfraStruXure System—Installation and Start-Up 1 Safety Overview Save these instructions This manual contains important instructions that must be followed during installation, operation, and maintenance of the InfraStruXure System. Safety symbols used in this manual Cross-reference symbols used in t...