APC 400kW1MW - Manuals
APC 400kW1MW – Manual in PDF format online.
Manuals:
Manual APC 400kW1MW
Summary
Contents Battery Rack Assembly and Installation Manual i Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Safety warnings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Safety precautions . . . . . . . . . . . . . . . . . . . . . . ....
Battery Rack Assembly and Installation Manual 1 Safety Safety warnings Safety precautions Warn in g • Only QUALIFIED ELECTRICIANS may perform this installation! Battery installation must be performed in accordance with all applicable codes! • Observe all WARNING and CAUTION notices! Failure to do so...
Safety 2 Battery Rack Assembly and Installation Manual Additional considerations C au tion • Observe all requirements and limitations pertaining to floor loading! • Remove watches, rings, and other metal objects from your body. • DO NOT lay tools or metal parts on top of batteries! • To avoid static...
Battery Rack Assembly and Installation Manual 3 Specifications Rack/battery options The racks are deployed in multiples of two, with each rack housing one battery string. A maximum of eight racks (battery strings) can be used to support a single Symmetra MW UPS. The total number of strings deployed ...
4 Battery Rack Assembly and Installation Manual Shipping and Receiving Shipping Rack assemblies are shipped in corrugated boxes. Battery cables, battery boots, terminal blocks, and labels are also included in the shipment. Each pallet can support a maximum of two (2) units. Boxes are shrink-wrapped ...
Battery Rack Assembly and Installation Manual 5 Placement Positioning The racks should ideally be positioned so that the batteries can easily be connected to the appropriate breaker in the battery breaker box(es). The graphic below shows a typical UPS system, and how the battery racks fit into the o...
6 Battery Rack Assembly and Installation Manual Installation Site Installation considerations The installation site should adhere to the following requirements: • There should be ample room for performing rack assembly, battery installation, maintenance, and possible battery replacement. • Aisle spa...
Battery Rack Assembly and Installation Manual 7 Parts List This section provides a listing of parts needed to assemble each battery rack. Do not proceed with this installation until all parts are in your possession. Description APC P/N Qty Top Side Subassembly 870-1657A 2 Bottom Side Subassembly 870...
8 Battery Rack Assembly and Installation Manual Battery Cabling Batteries are arranged in the rack in accordance with Wiring Style E. The wiring diagrams for this style are detailed in “Appendix A: Battery Wiring Style E” on page 35. The (included) battery cabling kit was designed to suit the specif...
Battery Rack Assembly and Installation Manual 9 Rack Assembly Assembling the bottom section The bottom section of the rack will contain shelves #3 and #4. 1. Bolt Cross Bar #1 to Bottom Side Subassembly #1 at hole position #2 (from front) on the LOWER horizontal support of the Subassembly. Use (1) 3...
Rack Assembly 10 Battery Rack Assembly and Installation Manual 3. Bolt Cross Bar #1 to Bottom Side Subassembly #2 at its opposite hole position #2 (from front). Use (1) 3/8-16 x 1” bolt and related hardware: (2) 3/8 washers and (1) 3/8 KEPS nut. Refer to graphic in step 4 below. 4. Bolt Cross Bar #2...
Rack Assembly Battery Rack Assembly and Installation Manual 11 9. Bolt Cross Bar #4 to Bottom Side Subassembly #2 at its opposite hole position #6 (from front). Use (1) 3/8-16 x 1” bolt and related hardware: (2) 3/8 washers and (1) 3/8 KEPS nut. Assembling the top section The top section of the rack...
Rack Assembly Battery Rack Assembly and Installation Manual 13 5. Bolt Cross Bar #6 to Top Side Subassembly #1 at hole position #6 (from front) on the LOWER horizontal support of the Subassembly. Use (1) 3/8-16 x 1” bolt and related hardware: (2) 3/8 washers and (1) 3/8 KEPS nut. Refer to graphic in...
Rack Assembly Battery Rack Assembly and Installation Manual 15 Stabilizing the rack Bolt (4) Rear Cross Braces to rack at designated hole positions. Use (8) M12 x 35 bolts and related hardware: (16) 12mm washers, (8) 12mm lockwashers and (8) M12 nuts. Note that lower bolts on Brace #1 and Brace #2 a...
Rack Assembly 16 Battery Rack Assembly and Installation Manual Anchoring the rack (optional) For added stability, any or all of the racks can optionally be bolted to a concrete floor. To anchor the rack, chalk mark four (4) pre-cut holes (at the base of the assembly) in the facility floor, drill, an...
Rack Assembly Battery Rack Assembly and Installation Manual 17 Positioning rails on shelves Apply your Battery Type (Power or Fiamm) to the Rail Spacing Matrix below to determine initial positioning of rails. Take into consideration that this information represents “suggested” starting points for pl...
Rack Assembly 18 Battery Rack Assembly and Installation Manual 3. Using a rated lifting device, load batteries onto BOTTOM shelf rails in accordance with your wiring diagram for that shelf. Take note of where each numbered battery should be placed, and the proper positioning of its positive and nega...
Rack Assembly Battery Rack Assembly and Installation Manual 19 2. Working left to right (from front of rack), connect the last battery in the first row to the first battery in the second row using the supplied row-to-row cable. – Refer to your wiring diagrams for proper cabling and termination point...
Rack Assembly 20 Battery Rack Assembly and Installation Manual Connecting to batteries. There are three types of battery terminals for connecting cables: 1) Stud terminal, 2) Insert terminal, and 3) L (or I) terminal. The application of hardware for making the connection varies according to the type...
Rack Assembly Battery Rack Assembly and Installation Manual 21 Covering battery connections. After each lug has been connected to its battery terminal, snap the boot down over the lug/terminal. Addressing the third shelf The THIRD shelf is addressed only after bottom shelf batteries have been loaded...
Rack Assembly 22 Battery Rack Assembly and Installation Manual 2. Screw (1) Terminal Block Assembly to the SECOND shelf Cross Bar at the front of the rack. Secure to cross bar with the (2) supplied M6 socket-head cap screws and flange nuts. Select a location on the bar that does not conflict with ba...
Rack Assembly Battery Rack Assembly and Installation Manual 23 3. Using a rated lifting device, load batteries onto TOP shelf rails in accordance with your wiring diagram. Take note of where each numbered battery should be placed, and the proper positioning of its positive and negative terminals. Re...
Rack Assembly 24 Battery Rack Assembly and Installation Manual 5. Remove protective boot and connect this same cable end to the open positive (+) terminal on the first battery in the lower shelf. Snap cable boot over connected lug/terminal. Assembling the second rack The battery racks must be deploy...
Rack Assembly Battery Rack Assembly and Installation Manual 25 Labelling the terminal blocks Each rack is equipped with (1) terminal block assembly. The left (+) and right (-) segments of each terminal block must be appropriately labelled. 1. Remove the snap-off cover from the front face of each ter...
Rack Assembly 26 Battery Rack Assembly and Installation Manual Connecting terminal blocks to battery breakers To minimize risk, terminal block-to-battery breaker connections are made prior to battery-to- terminal block connections. TOP entry of 120 mm 2 [#4/0] cable (not supplied) is recommended for...
Rack Assembly Battery Rack Assembly and Installation Manual 27 2. Using one (1) 120 mm 2 [#4/0] cable, connect the appropriate (top or bottom) BAT 1- terminal in Terminal Block #1 to the BAT 1- terminal in Battery Breaker #1. At Terminal Block #1: If using top cable entry, connect to top terminal (a...
Rack Assembly 28 Battery Rack Assembly and Installation Manual 4. Using one (1) 120 mm 2 [#4/0] cable, connect the appropriate (top or bottom) BAT 2- terminal in Terminal Block #2 to the BAT 2- terminal in Battery Breaker #2. At Terminal Block #2: If using top cable entry, connect to top terminal (a...
Rack Assembly Battery Rack Assembly and Installation Manual 29 1. Using specified cable, connect the open BAT 1+ terminal in Terminal Block #1 to the open positive (+) terminal on Battery #1. Before making connections, apply ONE cable boot. If lug sizes are different, apply boot to the cable end wit...
Rack Assembly 30 Battery Rack Assembly and Installation Manual 2. Using specified cable, connect the open BAT 1- terminal in Terminal Block #1 to the open negative (-) terminal on Battery #32. Before making connections, apply ONE cable boot. If lug sizes are different, apply boot to the cable end wi...
Rack Assembly Battery Rack Assembly and Installation Manual 33 Reattaching terminal block covers Reattach the snap-off cover to the front face of each terminal block. Applying warning labels Labels must be applied to the more visible areas of the racks to warn of the dangers associated with live bat...
34 Battery Rack Assembly and Installation Manual Glossary AH Ampere-hour in-lbs Inch-pounds APC American Power Conversion kg Kilogram battery rails Adjustable rails that rest on cross bars and hold batteries lb Pound BOM Bill of Materials mm Millimeter C Centigrade (degrees) Ohmmeter Instrument used...
Battery Rack Assembly and Installation Manual 35 Appendix A: Battery Wiring Style E Style E, rack #1, shelf #1 (top) The following connections must be made to the TOP shelf in Rack #1: • Battery-to-battery: cables 1-6 • Row-to-row: cable 49 • Shelf-to-shelf: cable 57 • Battery-to-terminal block: cab...
Appendix A: Battery Wiring Style E Battery Rack Assembly and Installation Manual 37 Style E, rack #1, shelf #3 The following connections must be made to the THIRD shelf in Rack #1: • Battery-to-battery: cables 13-18 • Row-to-row: cable 51 • Shelf-to-shelf: cable 59 • Battery-to-terminal block: none ...
Appendix A: Battery Wiring Style E Battery Rack Assembly and Installation Manual 39 Style E, rack #2, shelf #1 (top) The following connections must be made to the TOP shelf in Rack #2: • Battery-to-battery: cables 25-30 • Row-to-row: cable 53 • Shelf-to-shelf: cable 60 • Battery-to-terminal block: c...
Appendix A: Battery Wiring Style E Battery Rack Assembly and Installation Manual 41 Style E, rack #2, shelf #3 The following connections must be made to the THIRD shelf in Rack #2: • Battery-to-battery: cables 37-42 • Row-to-row: cable 55 • Shelf-to-shelf: cable 62 • Battery-to-terminal block: none ...
Battery Rack Assembly and Installation Manual 43 Appendix B: Battery Cabling Kits References for Power battery cables: References for Fiamm battery cables: Product SKU: SYR400k1000HxR Ref Des Qty Use Length P/n 1-48 48 Battery-to-Battery 356 mm 0W01883 49-56 8 Row-to-Row 914 mm 0W02422 57-62 6 Shelf...
44 Battery Rack Assembly and Installation Manual Appendix C: Employing Sidecars Sidecar overview Battery racks can be situated in one or more locations separate and apart from the battery breakers. In these instances, a sidecar should be employed at each separated location to prevent distance from c...
Appendix C: Employing Sidecars Battery Rack Assembly and Installation Manual 45 Positioning and accessing the sidecar The sidecar is typically positioned alongside one of the separated racks it supports, and ideally should be positioned closest (of all units in the group) to the battery breakers. Si...
Appendix C: Employing Sidecars 46 Battery Rack Assembly and Installation Manual Connecting terminal blocks to sidecars To minimize risk, terminal block-to-sidecar connections are made prior to sidecar-to-battery breaker connections and battery-to-terminal block connections. TOP entry of 120 mm 2 [#4...
Appendix C: Employing Sidecars Battery Rack Assembly and Installation Manual 47 2. Using one (1) 120 mm 2 [#4/0] cable, connect the BAT 1- terminal in Terminal Block #1 to either of the two BAT 1- vertical bars in the Sidecar. At Terminal Block #1: If using top cable entry, connect to top terminal (...
Appendix C: Employing Sidecars 48 Battery Rack Assembly and Installation Manual 3. Using one (1) 120 mm 2 [#4/0] cable, connect the BAT 2+ terminal in Terminal Block #2 to either of the two BAT 2+ vertical bars in the Sidecar. At Terminal Block #2: If using top cable entry, connect to top terminal (...
Appendix C: Employing Sidecars Battery Rack Assembly and Installation Manual 49 4. Using one (1) 120 mm 2 [#4/0] cable, connect the BAT 2- terminal in Terminal Block #2 to either of the two BAT 2- vertical bars in the Sidecar. At Terminal Block #2: If using top cable entry, connect to top terminal (...
Appendix C: Employing Sidecars 50 Battery Rack Assembly and Installation Manual Connecting sidecars to battery breakers To minimize risk, sidecar-to-battery breaker connections are made prior to battery-to-terminal block connections. TOP entry of 253 mm 2 [500 MCM] cable (not supplied) is recommende...
Appendix C: Employing Sidecars Battery Rack Assembly and Installation Manual 51 2. Using three (3) 253 mm 2 [500 MCM] cables, connect the BAT 2+ horizontal bar in the Sidecar to the specified BAT 2+ bus in Battery Breaker #2. At Battery Breaker #2: Refer to the battery breaker’s wiring diagram for t...
Appendix C: Employing Sidecars 52 Battery Rack Assembly and Installation Manual 3. Using three (3) 253 mm2 [500 MCM] cables, connect the BAT 1- horizontal bar in the Sidecar to the specified BAT 1- bus in Battery Breaker #1. At Battery Breaker #1: Refer to the battery breaker’s wiring diagram for th...
Appendix C: Employing Sidecars Battery Rack Assembly and Installation Manual 53 4. Using three (3) 253 mm 2 [500 MCM] cables, connect the BAT 1+ horizontal bar in the Sidecar to the specified BAT 1+ bus in Battery Breaker #1. At Battery Breaker #1: Refer to the battery breaker’s wiring diagram for t...
Battery Rack Assembly and Installation Manual 57 APC Warranty on Batteries APC warrants that its supplied High-Rate series of Valve Regulated Lead Acid batteries will be free of defects in material and workmanship for a period of one (1) year from date of shipment. This amounts to the same basic war...
® *990-4194A* APC Worldwide Customer Support Customer support for this or any other APC product is available at no charge in any of the following ways: • Visit the APC Web site to access documents in the APC Knowledge Base and to submit customer support requests. – www.apc.com (Corporate Headquarter...
APC Manuals
-
APC AR8163ABLK
Manual
-
APC 1500 VA
Manual
-
APC PRO 1200/1500
Manual
-
APC DP300E Series
Manual
-
APC 1500RMXL2U
Manual
-
APC 1400VA XL
Manual
-
APC VA 1000
Manual
-
APC SUA24XLBP
Manual
-
APC 1000
Manual
-
APC RBC9
Manual
-
APC 450
Manual
-
APC 2000
Manual
-
APC RBC9I
Manual
-
APC AP9604S
Manual
-
APC AP9554
Manual
-
APC RS 540W
Manual
-
APC Smart-UPS 1000
Manual
-
APC H10
Manual
-
APC SURTA2000XL
Manual
-
APC 4075KVA208V
Manual