Zephyr CBE-1000 - Manual

Zephyr CBE-1000

Zephyr CBE-1000 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
Page: / 5

Table of Contents:

  • Page 2 – READ AND SAVE THESE INSTRUCTIONS
  • Page 4 – BEFORE INSTALLING; Top View
  • Page 5 – Tape and screw all joints to prevent air leaks. See Fig - 4.; Check for; The ground wire shall have a suitable gauge according to the; External Blower; noi
Loading the manual

External Blower

CBE-1000

Model number: CBE-1000

Serial number:

U

se

,

C

a

re

,

a

n

d

In

st

a

lla

tion

G

u

id

e

MAY07.0101 © Zephyr Corporation.

www.zephyronline.com

Date of Purchase:

Sales Dealer:

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - READ AND SAVE THESE INSTRUCTIONS

www.zephyronline.com Im p o rt a n t s a fe ty N ot ic e 1 READ AND SAVE THESE INSTRUCTIONS WARNING TO RE DUC E TH E R IS K O F F IR E O R E L E C TR IC SHOC K, D O N O T US E TH IS FAN W ITH ANY S O L ID-S TATESP E E D C O NTRO L D EV IC E. WARNING TO RE DUC E TH E R IS K O F F IR E, E L E C TR IC ...

Page 4 - BEFORE INSTALLING; Top View

www.zephyronline.com 3 In s ta lla ti o n - Ex te rn a l B lo w e r 1. Remove and discard shipping brackets and wood support (attached to sides of motor and inlet collar). Fig. - 7 BEFORE INSTALLING , check to see if blower wheel turns freely and does not rub on motor brackets. Check damper door to ...

Page 5 - Tape and screw all joints to prevent air leaks. See Fig - 4.; Check for; The ground wire shall have a suitable gauge according to the; External Blower; noi

4. Connect the blower to exhaust system with a 10” diameter metal duct only. Use 10” adjustable elbow to adjust to roof angle. IMPORTANT: You must run 10” round duct work from the external blower to the ceiling. Before the duct work passes through the ceiling b racket, use a 10” to 8” transition ada...

Other Zephyr Models

All Zephyr Other