Xantrex PV100S-480 - Manual

Xantrex PV100S-480

Xantrex PV100S-480 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
57 Page 57
58 Page 58
59 Page 59
60 Page 60
61 Page 61
62 Page 62
63 Page 63
64 Page 64
65 Page 65
66 Page 66
67 Page 67
68 Page 68
69 Page 69
70 Page 70
71 Page 71
72 Page 72
73 Page 73
74 Page 74
75 Page 75
76 Page 76
77 Page 77
78 Page 78
79 Page 79
80 Page 80
81 Page 81
82 Page 82
83 Page 83
84 Page 84
85 Page 85
86 Page 86
87 Page 87
88 Page 88
89 Page 89
90 Page 90
Page: / 90

Table of Contents:

  • Page 3 – Planning and Installation Manual
  • Page 5 – About This Manual; Purpose; Scope
  • Page 6 – Conventions Used; WARNING
  • Page 7 – Abbreviations and Acronyms
  • Page 9 – Important Safety Instructions; SAVE THESE INSTRUCTIONS - DO NOT DISCARD; WARNING: Shock Hazard
  • Page 10 – General Safety Precautions
  • Page 12 – Operational Safety Procedures; servicing
  • Page 13 – To isolate the PV100S:; Interconnection Standards Compliance
  • Page 15 – Contents
  • Page 16 – Installation
  • Page 17 – Tables
  • Page 19 – Figures
  • Page 21 – Introduction; Chapter 1, “Introduction”
  • Page 22 – Description of the PV100S
  • Page 24 – System Specifications; Over Voltage, Under Voltage and Frequency Ranges; CAUTION: Equipment Damage
  • Page 25 – System Ground Requirements
  • Page 27 – Operator Interface Controls; Main Enclosure Door Interlock Switch
  • Page 29 – AC and DC Disconnect Switches; Communication Features
  • Page 30 – System Status and Fault Reporting
  • Page 31 – Communication Methods; Universal Front Panel Control Unit (UFCU)
  • Page 32 – PC Connection Methods
  • Page 34 – Direct Access
  • Page 35 – Planning; Chapter 2, “Planning”
  • Page 36 – Overview of PV100S Installation
  • Page 37 – PV Planning
  • Page 38 – Ground Requirements; POTS Connect Kit; Direct Connect Kit; Utility Side Isolation Transformer Requirements
  • Page 39 – Electrical Diagrams and Schematics
  • Page 40 – Layout Options
  • Page 42 – Conduit Penetration
  • Page 45 – Conductor and Conduit Sizing; To calculate the proper conduit size:; Step 1. Determine the required cable ampacity.
  • Page 50 – Equipment Required; WARNING: Heavy Equipment
  • Page 51 – To move the PV100S while it is still inside the shipping crates:
  • Page 52 – Removing the Pallet and Moving the PV100S; To move the PV100S using a forklift:; Lift Here
  • Page 53 – Mounting and Anchoring the Units; To mount and anchor the PV100S:
  • Page 54 – Opening or Closing Access Doors; To lock or unlock the front door on the main inverter:
  • Page 55 – To Close Access Door:; To Close Access Door:
  • Page 57 – Conduit Installation; To install the conduits:
  • Page 60 – Wire Gauge and Torque Requirements
  • Page 61 – System Neutral Requirements
  • Page 62 – AC Connections
  • Page 65 – To connect the utility service to AC Interface Enclosure:
  • Page 67 – PV Array Connections
  • Page 68 – PC Communications
  • Page 69 – Establishing a POTS Connection; To connect a personal computer using the POTS Connection:
  • Page 70 – Establishing Wireless Connection; To connect a personal computer using the GSM Wireless modem:; Establishing an Ethernet LAN Connection; To connect a personal computer using the Ethernet LAN Connection:; IP A
  • Page 71 – Direct Connection; If connecting the PC directly to the inverter:
  • Page 73 – Verification
  • Page 74 – Verification Procedure Summary; WARNING: Electrocution Hazard
  • Page 75 – Visual Inspection of Mechanical Connections
  • Page 76 – Visual Inspection, Isolation Transformer Wye/Wye
  • Page 77 – Schematics; Appendix A contains useful schematics to aid with installation.
  • Page 78 – This page intentionally left blank.
  • Page 87 – Index
  • Page 90 – Xantrex Technology Inc.
Loading the manual

PV100S 100 kW
Grid-Tied
Photovoltaic
Inverter

PV100S-208
PV100S-480

Planning and Installation Manual

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 3 - Planning and Installation Manual

PV100S 100 kW Grid-Tied Photovoltaic Inverter Planning and Installation Manual

Page 5 - About This Manual; Purpose; Scope

152315 Rev C iii About This Manual Purpose The purpose of this Planning and Installation Manual is to provide explanations and procedures for planning and installing the PV100S 100 kW Grid-Tied Photovoltaic Inverter. Scope The Manual provides safety guidelines, detailed planning and setup informatio...

Page 6 - Conventions Used; WARNING

About This Manual iv 152315 Rev C Conventions Used The following conventions are used in this guide. This Manual contains information for two models of the PV100S 100 kW Grid-Tied Photovoltaic Inverter. One model is designed to operate with a 208 Vac utility input, and the other model is designed to...

Other Xantrex Models

All Xantrex Other