Verizon Network Manager Nodes - Manual

Verizon Network Manager Nodes

Verizon Network Manager Nodes – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
57 Page 57
58 Page 58
59 Page 59
60 Page 60
61 Page 61
62 Page 62
63 Page 63
64 Page 64
65 Page 65
66 Page 66
67 Page 67
68 Page 68
69 Page 69
Page: / 69

Table of Contents:

  • Page 3 – Table of Contents; Perform Quick Percent Allocations and Termination Changes 8-1
  • Page 5 – System Requirements; What are the site software requirements?; FAQs; SECTION
  • Page 7 – Provides a hierarchical view of network and routing options.; Features and Benefits; Construct, edit, and delete plans for greater routing flexibility.
  • Page 9 – Review the Network Control System; The following three components form the NCS System:
  • Page 10 – Network Control System; The following steps outline the process followed by the NCS:
  • Page 11 – Analyze Nodes-Based Routing; Provides flexibility when routing toll-free numbers.; Node; A set of values that are connected by branches.
  • Page 12 – Label
  • Page 13 – Routing Node Types
  • Page 15 – Identify Details in the Navigation Tree; Home; Search; Number; Continue
  • Page 16 – Navigation Tree Node Details; Expand
  • Page 17 – Navigation Tree Node Details, cont’d; The; Corporation Details; Lists the Corp ID in which you are working.; Plan Level
  • Page 18 – Set Details
  • Page 19 – View and Print a Plan; side of the; View; icon on the toolbar. The; Print; icon on the toolbar to print the tree view diagram.
  • Page 20 – View Plan Details; Change Plan; from the; Plan Details; Cancel; Routing Plan Maintenance
  • Page 21 – View the Details of a Parent or Child Node; Select the node you want to view from the; View Model; View Label; to see the values on a label.; OK; to return to the
  • Page 22 – View Termination Details; Termination Details; Node Routing Maintenance
  • Page 23 – View Termination Details, cont’d; Detail Tab
  • Page 24 – View a Structure; You can view a structure in a plan while in; STR
  • Page 25 – Implement a Plan; Select the plan you want to implement.; to NLP
  • Page 26 – Implementation Details; Activate Trigger Points; Trigger Point; As soon as possible; Effective Date and Time; Rollback; Rollback Date and; Submit; Results of the IMPL request
  • Page 27 – Implement Order Results; Refresh; For Your Information
  • Page 29 – Perform a Quick; Quick
  • Page 30 – Change the Percent Allocation; Close; Approve
  • Page 31 – Set a Rollback Date and Time; Remarks; Select rollback date
  • Page 32 – Replace a Termination; Select a toll-free number from the navigation tree on the; Replace with TRM; Lterm Select
  • Page 34 – Add Termination; LTerm Select; Quick Change
  • Page 35 – Add a Termination, cont’d; to permanently save and complete the termination(s) changes.; Rollback Order; option to go back to the original percent allocation and
  • Page 36 – Delete a Termination or Treatment (Quick)
  • Page 37 – Redefine a DAL Termination; Redefine DAL TRM; DAL Termination Node
  • Page 38 – Redefine a DAL Termination, cont’d
  • Page 39 – Limited Quick
  • Page 40 – Limited Quick, cont’d; Submit Quick; Type remarks in the
  • Page 41 – Perform a Quick from the Integrated Call Tree (ICT); do not; have this option; ICT
  • Page 42 – Perform a Quick from the ICT, cont’d; Enter; Quick Orders
  • Page 43 – Submit an ICT Quick Order; Quick Order
  • Page 45 – View Plan History and Compare; View the Order History for a Plan; Select a plan from the navigation tree on the; Show History; Order List
  • Page 46 – Ctrl; key to select the two orders you want to compare.; Show Differences; Order Differences
  • Page 47 – Text; icon to view the values/labels on the plan branches.; Blue; icon. The difference for each branch appear in the
  • Page 48 – Order Differences Toolbar; The following example describes each icon on the
  • Page 49 – Plan Compare; You can compare two plans to view the differences between them.; Mark for Differences; Select the second plan you want to compare.; Value Differences
  • Page 51 – Copy Classic to Nodes; plan to a Nodes plan.
  • Page 52 – Copy Classic to Nodes, cont’d; Copy To Nodes; Copy Plan; Create a node to block Canadian traffic; . This option is not available if; Create Order; Click; Create Inventory; to copy, create, and approve the nodes routing plan and make it
  • Page 53 – Edit; to approve the order and create your plan. The; on the number until the order completes.
  • Page 54 – Change Your Main Plan; Right-click on the plan name and select
  • Page 55 – Delete a Classic Plan; Order; Delete; Delete Plan; Order Manager
  • Page 57 – View and Maintain Orders; Pending; Orders
  • Page 58 – Use the Order Filter; on the; Effective Date + Time; tab to filter orders by the effective date and time.; Save this filter as default; if you want this to be your default order filter.; Columns; to add or remove columns from the
  • Page 59 – Set Column Preferences; Up; Order Filter
  • Page 60 – View the Order List
  • Page 61 – Interpret the Order List
  • Page 62 – View the Details of an Order; View Details
  • Page 63 – Edit an Order
  • Page 64 – View the Order Calendar; Order | Calendar View
  • Page 65 – Access Help; Help
  • Page 67 – Obtain Customer Support; Select
  • Page 69 – Index
Loading the manual

Network Manager Nodes

Module 1 -

Introduction to Nodes, IMPLs, & Quicks

User Guide

Version 1.08

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 3 - Table of Contents; Perform Quick Percent Allocations and Termination Changes 8-1

Table of Contents Networx Universal Customer Center Overview ...................... 1-1Product Overview ...................................................................... 2-1Review the Network Control System ....................................... 3-1 Network Control System ........................

Page 5 - System Requirements; What are the site software requirements?; FAQs; SECTION

January 15, 2008 Version 1.08 1-1 Networx Universal Customer Center Overview The Networx Universal Customer Center (NUCC) is a single source solution for fVerizon and fMCI tools. Access all of the tools you need to manage your network 24 X 7 with a single login. • Create and track online orders for ...

Page 7 - Provides a hierarchical view of network and routing options.; Features and Benefits; Construct, edit, and delete plans for greater routing flexibility.

January 15, 2008 Version 1.08 2-1 Product Overview Network Manager Overview Network Manager provides near real-time traffic management for both basic and advanced toll-free services. This is accomplished by providing definition and control of origination, routing, and termination features. Dynamical...

Other Verizon Models

All Verizon Other