Sterling SSL - Manual

Sterling SSL

Sterling SSL – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
57 Page 57
58 Page 58
59 Page 59
60 Page 60
61 Page 61
62 Page 62
63 Page 63
64 Page 64
65 Page 65
66 Page 66
Page: / 66

Table of Contents:

  • Page 3 – Shipping Information; Unpacking and Inspection; According to the contract terms and conditions of the Carrier,; Do not return any goods to the manufacturer
  • Page 4 – contact the manufacturer immediately; Returns; Do not return any damaged or incorrect items
  • Page 5 – Table of Contents; CHAPTER 5: SERIES ONE PLUS CONTROLLER OPERATION
  • Page 8 – Chapter 2: Functional Description; Documents
  • Page 9 – IL; -5 Standard Operational Features
  • Page 10 – separately; sight
  • Page 11 – only; Options
  • Page 15 – Figure 4: Typical SSIL/CSIL Series Sight Glass Hopper Loader
  • Page 17 – Chapter 3: Installation; Rules; OFF; Considerations; Tools
  • Page 18 – Tips; rivets; -6 Attaching the Pickup Wand; Electrical
  • Page 19 – Make sure all connections are; -9 Installing the Remote Control Box; WARNING; before; installing this option!; -10 Adjusting the Proximity Switch
  • Page 21 – Chapter 4: Series One Controller Operation; Checklist; Can the material level switch activate without obstruction?; Sequence
  • Page 22 – Figure 6: Series One Graphic Panel; O F F; MPBEFS; BVUP; T M; O N
  • Page 23 – -3 Starting the Hopper Loader; ON; -4 Changing the Conveying Sequence; DANGER; DISCONNECT POWER; BEFORE; OPENING THE CONTROL BOX.; CAPABLE OF; ONLY; Make sure you avoid over-filling the hopper!
  • Page 24 – -5 Selecting the Most Efficient Loading Sequence
  • Page 27 – Chapter 5: Series One Plus Controller Operation; optional; Can the material discharge valve swing without obstruction?
  • Page 28 – Figure 9: Series One Plus Graphic Panel; SERIES ONE PLUS; MENU ADJUSTMENTS AND INSTRUCTIONS:
  • Page 31 – Press; key and; key together; PLUS
  • Page 32 – You can adjust the maximum vacuum time from 0 to 360; FULL
  • Page 33 – and hold
  • Page 34 – The; -5 Operating a Hopper Loader at Factory Defaults
  • Page 35 – PP; -6 Operating the Proportioning Feature
  • Page 36 – -7 Using the Batch Counter
  • Page 37 – -9 Customizing Series One Plus Controller Operations
  • Page 38 – -10 Navigating Series One Plus Controller Menus; AEC
  • Page 39 – -11 Series One Plus Operating Parameter Menus; Maximum Vacuum Cycle Time
  • Page 41 – Figure 10: Proportioning Cycle
  • Page 43 – Clear
  • Page 44 – Chapter 6: Series One Plus SPI Communications; -1 SPI Network Functions; -2 Setting Up the SPI Function; SERVICE
  • Page 46 – -3 Operating under SPI Control; SPI; SPI; Typical SPI Network Wiring Diagram
  • Page 47 – Chapter 7: Maintenance; Maintenance; CAUTION; Do not lift the cover assembly by the motor, piping, or accumulator.
  • Page 48 – WEAR SAFETY GLASSES; performing this; Removing Old Motor Brushes
  • Page 49 – Replacement and Reassembly
  • Page 50 – Seating Motor Brushes
  • Page 52 – Figure 12: Typical SSL/CSL 03 Series Hopper Loader - Exploded View
  • Page 55 – Figure 15: Typical SLC Series Hopper Loader Parts List, Version 2
  • Page 57 – Figure 17: SSIL/CSIL Series Sight Glass Hopper Loader Parts List
  • Page 60 – Chapter 8: Troubleshooting; Problem
  • Page 62 – Series One Plus Controllers
Loading the manual

Operation, Installation & Service Manual

SSL and SSIL Series

Sight Glass Hopper Loaders

Important!

Read Carefully Before Attempting to Install or Operate Equipment

Part No. 882.00149.00

Revision C

Bulletin No. CV1-600


"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 3 - Shipping Information; Unpacking and Inspection; According to the contract terms and conditions of the Carrier,; Do not return any goods to the manufacturer

3 Shipping Information Unpacking and Inspection You should inspect your SSL/CSL or SSIL/CSIL hopper loader for possible shipping damage. If the container and packing materials are in reusable condition, save them for reshipment if necessary. Thoroughly check the equipment for any damage that might h...

Page 4 - contact the manufacturer immediately; Returns; Do not return any damaged or incorrect items

4 If the Shipment is Not Complete Check the packing list. The apparent shortage may be intentional. Back-ordered items are noted on the packing list. You should have: ; SSL/CSL Series or SSIL/CSIL Series hopper loader(s) with controller(s) ; Bill of lading ; Packing list ; Operating and Installation...

Page 5 - Table of Contents; CHAPTER 5: SERIES ONE PLUS CONTROLLER OPERATION

5 Table of Contents CHAPTER 1: SAFETY ................................................................ 7 CHAPTER 2: FUNCTIONAL DESCRIPTION.............................. 8 2-1 Introduction....................................................................................................................

Other Sterling Models

All Sterling Other