Siemens Open Processor - User Manual

Siemens Open Processor

Siemens Open Processor – User Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
Page: / 6

Table of Contents:

  • Page 2 – Prerequisites; For Installations Requiring CE Compliance; APOGEE Wiring Guidelines for Field Panels; Installation
  • Page 3 – Figure 2. Installation of the Power Open Processor/Open Processor.
  • Page 4 – Figure 4. Rear View of the Power Open Processor.; Align the Power Open Processor/Open
Loading the manual

Installation Instructions

Document No. 545-461

July 30, 2008

Power Open Processor/Open Processor

Item Number 545-461-06, Rev. CA

Page 1 of 6

CAUTION:

The Power Open Processor/Open
Processor MMI and MMI/Modem ports
cannot be connected to a public telephone
network without an authorized modem.

Connecting such equipment to a public
telecommunications network in a European
Community Member State is in violation of
the national law implementing Directive
91/263/EEC on the approximation of the
laws of the Member States concerning
telecommunication terminal equipment,
including the mutual recognition of their
conformity.

Product Description

The Open Processor or Power Open Processor
attaches to the mounting rails, Module Bus (M-Bus)
rails, and Communications Bus (C-Bus). The Power
Open Processor/Open Processor contains the main
processor, memory, and communications for the
Modular Building Controller (MBC) or the Remote
Building Controller (RBC).

Product Numbers

562-040

APOGEE Power Open Processor/
BACnet

uses the EALN port to

communicate on a BACnet/IP ALN.

562-001

APOGEE Power Open Processor/
Protocol 2

uses the ALN port to

communicate on a P2 ALN. A firmware
change allows you to use the Ethernet
ALN (EALN) port in place of the P2
ALN.

562-002

APOGEE Power Open Processor/
Ethernet

uses the EALN port to

communicate on an Ethernet ALN. A
firmware change allows you to use the
ALN port in place of the EALN port to
communicate on a P2 ALN.

545-730

APOGEE Open Processor/Protocol 2

,

8 MB total memory (4 MB flash, 4 MB
RAM) with Firmware 2.

x

(repaired only).

545-726

APOGEE Open Processor/Stand-alone

,

6 MB total memory (4 MB flash, 2 MB
RAM) with Firmware 2.

x

(repaired only).

545-719

APOGEE Open Processor/Protocol 2

,

4 MB memory with Firmware 2.

x

(repaired only).

545-718

APOGEE Open Processor/Protocol 2

,

3 MB memory with Firmware 2.

x

(repaired only).

545-720

APOGEE Open Processor/Stand-alone

,

3 MB memory with Firmware 2.

x

(repaired only).

545-715

Open Processor/Protocol 2

,

4 MB memory with Firmware 1.

x

(repaired only).

545-716

Open Processor/Protocol 2

,

3 MB memory with Firmware 1.

x

.

545-717

Open Processor/Stand-alone,
3 MB memory with Firmware 1.

x

.

565-300 Series

Open Processor pre-APOGEE drivers

.

See the pre-APOGEE

Open Processor

Drivers Application Manual

(125-3140)

for additional requirements.

Accessories

545-712

MMI extension Cable. See

Installation

Instructions

(545-407).

549-510 Modem

Cable.

Warning/Caution Notation

WARNING

Personal injury or property
damage may occur if you do not
follow a procedure as specified.

CAUTION:

Equipment damage or loss of
data may occur if you do not
follow a procedure as specified.

Required Tools

None

Expected Installation Time

7 minutes

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 2 - Prerequisites; For Installations Requiring CE Compliance; APOGEE Wiring Guidelines for Field Panels; Installation

Document No. 545-461 Installation Instructions July 30, 2008 Prerequisites • MBC or RBC mounted and AC power connected. • All wiring terminated. • CE Compliance requirements met, if needed. • Power Module installed. • Termination blocks installed, if any. • Ethernet port installed, if any. • Authori...

Page 3 - Figure 2. Installation of the Power Open Processor/Open Processor.

Document No. 545-461 Installation Instructions July 30, 2008 WARNING: Open Processor/Protocol 2 or Controller Module - Lithium Battery Only qualified service personnel or an authorized Siemens Building Technologies, Inc. representative can enable the Open Processor/Protocol 2 or Controller Module li...

Page 4 - Figure 4. Rear View of the Power Open Processor.; Align the Power Open Processor/Open

Document No. 545-461 Installation Instructions July 30, 2008 Figure 3. Front View of the Open Processor/Protocol 2. MBC0358R1 CAUTION oiesogerngoaoperogv poirvoaiovganbsorgbososfnbov rvgmvea0cpkc]tynaaco C-BUS CARD EDGE MMI AND BLN CONNECTORS M-BUS CONNECTOR MOUNTING GUIDES WARNING LABEL LATCH Figur...

Other Siemens Models