Page 5 - BLANK
Page 6 - Table of Contents; SAFETY SUMMARY
Table of Contents i II L 01 Table of Contents SAFETY SUMMARY 1. General Safety Guidelines …………………………………………………………………. Safety-12. Hazard Warning Statements ……………………………………………………………… Safety-2 2.1 WARNING Statement …………………………………………………………………. Safety-2 CHAPTER 1. INSTALLATION REQUIREMENTS ....................
Page 8 - Safety 1; General Safety Guidelines; Follow all the installation procedures provided in this manual.
SAFETY SUMMARY Safety 1 II L 00 The hazard warnings which appear on the warning labels on the machine or in the manual have one ofthe following alert headings consisting of an alert symbol and a signal word, DANGER, WARINIG, orCAUTION. This is the safety alert symbol. It is used to alert you to pote...
Page 9 - Hazard Warning Statements; WARNING Statement; Perform unpacking where there is no dust or water leaking.
SAFETY SUMMARY (Continued) Safety 2 II L 00 2. Hazard Warning Statements The following are the hazard warning statements contained in this manual. 2.1 WARNING Statement • Leave over than 400mm at the rear of the Printer for ventilation. Otherwise print quality may be degraded. (Section 1.2,Page 1-1)...
Page 12 - Chapter 1. Installation Requirements; Installation Area; Table 1.1 Installation area; Installation Unit; WARNING; II
Installation Requirements 1-1 II L 00 Chapter 1. Installation Requirements 1.1 Application This specification is applied to the DDP70 Printer for Unpacking, Installing and Adjustment. 1.2 Installation Area Installation area is shown in Appendix 1.1–1.12 corresponding to Table 1.1. Table 1.1 Installa...
Page 14 - Chapter 2. Unpacking; Unpacking of the Engine; device, hit it against something, or turn it over on its side.
Unpacking 2-1 II L 00 Chapter 2. Unpacking 2.1 Unpacking of the Engine 1) Be careful when unpacking using the crane or forklift. Do not to drop device, hit it against something, or turn it over on its side. 2) Perform unpacking where there is no dust or water leaking. 3) Do not place heavy objects w...
Page 19 - Unpacking of the Finisher
Unpacking 2-6 II L 00 2.2 Unpacking of the Finisher 1) Be careful when unpacking using the crane or forklift. Do not to drop device, hit it against something, or turn it over on its side. 2) Perform unpacking where there is no dust or water leaking. 3) Do not place heavy objects which weigh 5 kg or ...
Page 24 - Unpacking of the High Capacity Hopper; ) Perform unpacking where there is no dust or water leaking.; Cap
Unpacking 2-11 II L 00 2.3 Unpacking of the High Capacity Hopper 1) Perform unpacking where there is no dust or water leaking. 2) Do not place heavy objects which weight 5 kg or more on device. 3) Observe the speed limit of 300 mm/sec. (1.08 km/hr) when moving device. Do not move device on unleveled...
Page 26 - Unpacking of the Container Stacker 1 or 2
Unpacking 2-13 II L 00 2.4 Unpacking of the Container Stacker 1 or 2 1) Be careful when unpacking using the crane or forklift. Do not to drop device, hit it against something, or turn it over on its side. 2) Perform unpacking where there is no dust or water leaking. 3) Do not place heavy objects whi...
Page 28 - ramp
Unpacking 2-15 II L 00 6) Remove the tape for leveling bolt, and take out four wood spacers from accessory box, it puts on the bottom of leveling bolts (under plastic bag), turned the leveling bolt by using theAdjustable Open End Wrench, and raised the Container Stacker. 7) Remove the four base pack...
Page 30 - Unpacking of the Transit Pass Unit Type DDP; Confirmation of the Accessories Parts; Relay Cable; Relay Cable x
Unpacking 2-17 II L 00 2.5 Unpacking of the Transit Pass Unit Type DDP 1) Perform unpacking where there is no dust or water leaking. 2) Do not place heavy objects which weight 5 kg or more on device. 3) Observe the speed limit of 300 mm/sec. (1.08 km/hr) when moving device. 4) Choose the location to...
Page 33 - Chapter 3. Preparation for Installation; Preparation for Installation of the Printer; Removing the Protection Tape and Mat from the Engine
Preparation for Installation 3-1 II L 00 Chapter 3. Preparation for Installation 3.1 Preparation for Installation of the Printer 3.1.1 Removing the Protection Tape and Mat from the Engine 1) Remove the Tapes and Mats from the Engine. 2) Open the Front Cover.3) Remove the Tapes and TH Packing. Front ...
Page 34 - Set the PS Air Filter for the Engine Rear Cover
Preparation for Installation 3-2 II L 00 4) Turn the TH handle clockwise to open the TH Unit.5) Remove the Tapes and Mat. 6) Turn the TH Handle counterclockwise to close the TH Unit. 3.1.2 Set the PS Air Filter for the Engine Rear Cover 1) Take out the PS Air Filter from Accessory Box.2) Install the...
Page 35 - Removing the Protection Tape from 500 Sheet Hopper 2 portion
Preparation for Installation 3-3 II L 00 3.1.3 Removing the Protection Tape from 2000 Sheet Hopper. 3.1.4 Removing the Protection Tape from 500 Sheet Hopper ; 2 portion Tape 500 Sheet Hopper Tape 2000 Sheet Hopper 2000 Sheet Hopper Tape Tape
Page 36 - Preparation for Installation of the Finisher
Preparation for Installation 3-4 II L 00 3.2 Preparation for Installation of the Finisher [FS-104H] (No RoHS Compliance Unit) 1) Remove the Protection Tapes from the Finisher.2) Remove the Shift Tray and Screws from the Finisher. II L 01
Page 40 - CAUTION; Shift Tray
Preparation for Installation 3-8 II L 00 8) Install the Shift Tray to the up-down portion (paper exit side) of Finisher. (Truss screw M4x6: 2) CAUTION When installing the Shift tray, fit the four auxiliary fittings to the guide holes of theMain tray before fixing screws. Shift Tray
Page 43 - Main tray
Preparation for Installation 3-11 II L 00 6) Install the Main tray on the up-down portion (paper exit side) of the Finisher. (Truss screw M4x6: 2) CAUTION When installing the Main tray, fit the four auxiliary fittings to the guide holes of theMain tray before fixing screws. Main tray II L 01
Page 44 - Preparation for Installation of the High Capacity Hopper
Preparation for Installation 3-12 II L 00 3.3 Preparation for Installation of the High Capacity Hopper 1) Remove the Protection Tapes from the High Capacity Hopper.2) Remove the Paper. 3) Remove the Protection Tape and Mirror Mat from the High Capacity Hopper. Paper Tape Tape High Capacity Hopper Ta...
Page 45 - Open the Front door, and remove two M4 Screws.
Preparation for Installation 3-13 II L 00 4) Confirm the Paper Guide position of the High Capacity Hopper. (LT or A4) Usually, Paper Guide position is set in “LT” at the shipment. When the customer wish to usethe High Capacity Hopper in A4 paper, change the Paper Guide position according to thefollo...
Page 46 - Preparation for installation of the Container Stacker 1 or 2; < Opening procedure of the Front Cover L >
Preparation for Installation 3-14 II L 00 3.4 Preparation for installation of the Container Stacker 1 or 2 1) Peel off the Protection Tapes and cushion from the Container Stacker 1 or 2.2) Open the Front Cover L and peel off the Protection Tapes.3) Peel off the mat under the Basket. < Opening pro...
Page 48 - Preparation for installation of the Transit Pass Unit Type DDP; ) Remove the Protection Tapes from the Transit Pass Unit Type DDP.
Preparation for Installation 3-16 II L 00 3.5 Preparation for installation of the Transit Pass Unit Type DDP 1) Remove the Protection Tapes from the Transit Pass Unit Type DDP. Tape Tape Tape
Page 49 - Chapter 4. Installation; ) Releasing the Rear Cover
Preparation for Installation 4-1 II L 00 Chapter 4. Installation 4.1 Installation in the composition of the Printer and Finisher / Finisher SR5000 CAUTION Don't install the Printer in any place where it will be subjected to direct sunlight sinceit may cause adverse effects on performance of the Prin...
Page 55 - interna; FG
Preparation for Installation 4-7 II L 00 1) Unplug the Power Supply Cable prior to connecting. 2) Be careful not to have other personnel plug in the power cable while performing the connecting. 3) Be sure to use power supply cable which complies with the following specification : Power plug rating ;...
Page 57 - protect the cable from the flame edge.
Preparation for Installation 4-9 II L 00 10) Connect the connectors of Printer with the Finisher. CAUTION 1) When connecting the connectors of printer with the finisher, pass the cable through the Hole of the Printer and clamp the cable with the cable clamp to protect the cable from the flame edge. ...
Page 59 - Confirm the SB cover opens and shuts smoothly after attaching.
Preparation for Installation 4-11 II L 00 [FS-108R] (RoHS Compliance Unit) 13) Install the Finisher to the Printer. (4) Fit the hooks on the main body installation plates (upper and lower) into the upper and lower holes on the Finisher as illustrated below, then lock them by pushing the Finisherto t...
Page 65 - not
Preparation for Installation 4-17 II L 00 19) Connect the connector of cables to the Printer and Transit Pass Unit Type DDP. (1) Pass the three cables through the Hole of Printer and Transit Pass Unit Type DDP from Transit Pass Unit Type DDP to Printer. - AC cable (white 2pin connector) x2- Signal c...
Page 69 - Installation in the composition with the High Capacity Hopper
Preparation for Installation 4-21 II L 00 4.2 Installation in the composition with the High Capacity Hopper 1) Install components other than the High Capacity Hopper.2) Draw the 2000 Sheet Hopper of the Engine.3) Remove the two M4 screws and Side Cover.
Page 72 - Connection of the Engine and Container Stacker 1 or 2
Preparation for Installation 4-24 II L 00 4.3 Installation in the composition with the Container Stacker 1 or 2 4.3.1 Connection of the Engine and Container Stacker 1 or 2 1) Drawer the 2000 Sheets Hopper and set the paper guide at the position of 8.5” paper size.2) Remove the M4 Screw and the 2000 ...
Page 75 - Important
Preparation for Installation 4-27 II L 00 12) Attach the Container Stacker to the Engine. (1) Pass the AC Relay cable (2-pin white connector) and FNS IF cable (20-pin black connector) through opening “A” in the Engine, and then through opening “B” in theContainer Stacker. (2) Pass the CST FG cable a...
Page 80 - Connection of the Container Stacker 1 and Container Stacker 2
Preparation for Installation 4-32 II L 00 4.3.2 Connection of the Container Stacker 1 and Container Stacker 2 1) Perform item 4.3.1.2) Remove the two M3x8 Screws and Electrostatic Eraser from the Container stacker 2.3) Install the Guide plate (U) with the Electrostatic Eraser (“FRONT” letter is surf...
Page 87 - Container Stacker 2; Standard Finisher
Preparation for Installation 4-39 II L 00 6) Connect the FNS IF cable (4 pin white connector) coming from the Container Stacker 2 to the 4 pin white connector in the Finisher (Connection 1 on the below figure). 7) Connect the FNS IF cable (20 pin black connector) coming from the Container Stacker 2 ...
Page 100 - Confirmation of the paper size indication
Installation 5-1 II L 00 Chapter 5. Checks 5.1 Confirmation of the paper size indication 1) Adjust the size guide of tray 1 to the A4 size or the Letter size. 2) Adjust the sensor plate of tray 1 to A4 or LTR. 3) Place the A4 size paper or the Letter size paper into the tray 1. II L 01 Size Guide Se...
Page 103 - Printing of the status reports; Reports
Installation 5-4 II L 00 5.2 Printing of the status reports 1) Push the [Reports] switch in the main menu screen. 2) Push the [Status] switch in the reports menu screen. 3) It is returned automatically to the main menu, and the Status page is printed. Reports [Main Menu] [Reports Menu] Status
Page 104 - Check the print contamination; Confirmation of the stapling; ) The way of test printing is as follows.
Installation 5-5 II L 00 5.3 Check the print contamination 1) Push the [Printer] switch in the main menu screen. 2) Push the [Test Print] switch in the printer menu screen. 3) The way of test printing is as follows. Printer / Test Print / Print Quality / Text File 4% / Tray * / Elevator Tray /Color ...
Page 105 - Adjustment of paper feeding position of Tray 1; , there is no need to add Hopper Spacer.
Installation 5-6 II L 00 5.5 Adjustment of paper feeding position of Tray 1 When Container Stacker 1 or Container Stacker 2 was installed.This adjustment is applied to DDP70 and DDP92.When container stacker 1 and container stacker 2 are installed, confirm paper feeding position incontainer stacker 2...
Page 108 - Appendix 1.Installation Area Information; Installation/maintenance area of the Printer and Finisher.
Appendix 1 II L 00 Appendix 1.Installation Area Information CAUTION * Don't install the Server in the following place. The position in which the Cover and the Tray cannot be opened.Under the tray of the Finisher.Front of exhaust fan.Top of the Printer. Appendix 1.1 Installation/maintenance area of t...
Page 120 - Appendix 2. Locations of the Leveling Bolt and Caster; Locations of the Leveling Bolt and Caster of the Printer
Appendix 13 II L 00 Appendix 2. Locations of the Leveling Bolt and Caster Appendix 2.1 Locations of the Leveling Bolt and Caster of the Printer CAUTION Make sure that the ground under the floor where the Leveling Bolt is installed isreinforced by the stand or other. If the ground is not reinforced, ...