Raypak 120 - Manual

Raypak 120

Raypak 120 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
57 Page 57
58 Page 58
59 Page 59
60 Page 60
61 Page 61
62 Page 62
63 Page 63
64 Page 64
65 Page 65
66 Page 66
67 Page 67
68 Page 68
Page: / 68

Table of Contents:

  • Page 3 – CONTENTS
  • Page 4 – You must also observe:; PAY ATTENTION TO THESE TERMS
  • Page 6 – - BEFORE INSTALLATION; Product Receipt; Water
  • Page 7 – Ratings and Certifications; WARNING; : Altering any Raypak pressure vessel by installing; Installations at Elevation; GUIDELINES; Operating Limits of the boiler:
  • Page 9 – Pressure gauge
  • Page 10 – TECHNICAL DATA
  • Page 13 – Legend; A - boiler in connection
  • Page 15 – PACKAGING AND TRANSPORTATION; TRANSPORTING THE BOILER
  • Page 17 – XPAK PIPING
  • Page 19 – XPAK INSTALLATION DIAGRAMS; The following illustrations are simplified conceptual; Key for installation sample diagrams
  • Page 22 – MAKING THE GAS CONNECTION
  • Page 23 – Wall Mounting Information
  • Page 24 – All Air from Inside the Building (room air)
  • Page 25 – INSTALLATIONS OF SUPPLIED VENT COMPONENTS; VENT SYSTEMS; Country
  • Page 26 – MINIMUM CLEARANCES FROM VENT/AIR INLET TERMINATION; Canadian Installations2
  • Page 31 – Two pipes vent adaptors; TWO PIPES SINGLE WALL
  • Page 34 – - ELECTRICAL CONNECTIONS; EXTERNAL CONNECTION BOARD CONNECTIONS; ELECTRICAL SHOCK HAZARD — For your; The boiler must be grounded.; Pipe ventilation must take place between the; CONDENSATE CONNECTION; RISQUE DE CHOC ÉLECTRIQUE —
  • Page 36 – TERMINAL STRIP DETAILS
  • Page 37 – The 3-way valve is continuously powered even
  • Page 38 – WIRING FUNCTIONAL DIAGRAM
  • Page 39 – There are several steps involved in starting up the boiler.
  • Page 42 – INSTRUCTING THE USER
  • Page 43 – tes the storage; Winter mode; - The boiler produces hot water for heating; Winter mode tank temperature; - The boiler produces; Adjusting heating water temperature; DHW mode
  • Page 44 – INDICATOR LEDS AND FAULTS
  • Page 45 – For AL41 faults; - Fill the system until the pressure indicated on the water gauge; For alarm AL91
  • Page 46 – NOTICE; 1 - CHECKS, ADJUSTMENTS AND FAULT FINDING
  • Page 49 – JUMPER IN POSITION 5:; JUMPER IN POSITION 6:; unused; JP; TYPE OF HEAT REQUEST; (this parameter can only be
  • Page 52 – 2 - SERVICING INSTRUCTIONS; genuine XPak spare parts
  • Page 56 – This conversion kit shall; CHANGE THE GAS INJECTOR
  • Page 57 – Gas pressure; MAX
  • Page 59 – 4 - EXPLODED DIAGRAMS; Drawing 1
  • Page 60 – Drawing 2
  • Page 61 – Drawing 3
  • Page 65 – LIMITED WARRANTY; MODULATING - CONDENSING BOILER; APPLICABLE WARRANTY PERIODS
  • Page 67 – RAYPAK PRODUCTS
Loading the manual

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 3 - CONTENTS

3 CONTENTS 1 - WARNINGS 4 PAY ATTENTION TO THESE TERMS 4 2 - GENERAL SAFETY 6 TIME/TEMPERATURE RELATIONSHIPS IN SCALDS 6 3 - BEFORE INSTALLATION 6 4 - REGULATIONS AND GUIDELINES 7 5 - INTRODUCTION 8 TECHNICAL DATA 10 PRINCIPLE COMPONENTS 12 MODE OF OPERATION (AT REST) 12 MODE OF OPERATION 12 SAFETY ...

Page 4 - You must also observe:; PAY ATTENTION TO THESE TERMS

4 CAUTION : This boiler requires forced water circulation when the burner is operating. See minimum and maximum flow rates.Severe damage will occur if the boiler is operated without properwater flow circulation. NOTE : Minimum 18 AWG, 105°C, stranded wire must be used for all low voltage (less than ...

Page 6 - - BEFORE INSTALLATION; Product Receipt; Water

6 3 - BEFORE INSTALLATION Raypak strongly recommends that this manual be reviewedthoroughly before installing your XPak boiler. Please review theGeneral Safety information before installing the boiler. Factorywarranty does not apply to boilers that have been improperlyinstalled or operated. (Refer t...

Other Raypak Models

All Raypak Other