Pioneer 2LG110 - User Manual
Pioneer 2LG110 – User Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 2 – Thank you for purchasing this Pioneer quality product.; Tools Required; Adjustable; Prior to Installation; Observe all local plumbing and building codes before you begin
- Page 3 – Faucet Installation; Make sure both sides of mounting nuts (D) are securely tighten.
- Page 4 – Main Supply Connection; Flush and allow water to run at full flow for at least one minute.
- Page 5 – Engineering Excellence; E ng ine e r ing E xc e l l e nc e
Installation Guide
Two Handle Kitchen Faucet:
2LG100 • 2LG120*
•
2LG101 • 2LG230*
•
2LG100B • 2LG231*
•
2LG110* • 2LG240*
•
2LG111*
•
This product meets the following standards:
ASME A112.18.1
•
ANSI A117.1
•
ANSI / NSF 61, SECTION 9
•
CUPC / IAPMO LISTED / ADA COMPLIANT
•
CONTAINS NO MORE THAN 0.25% WEIGHTED
•
AVERAGE LEAD CONTENT
REV-11 19, 12
Engineering Excellence
Pioneer Industries, Inc. © 2012
Engineering Excellence
E ng ine e r ing E xc e l l e nc e
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
2 REV-11 19, 12 Thank you for purchasing this Pioneer quality product. Tools Required Adjustable Wrench Teflon Tape Rags 3/32” Allen Wrench Prior to Installation Observe all local plumbing and building codes before you begin • installation.Carefully shut off both hot and cold water supplies from und...
3 REV-11 19, 12 Faucet Installation Place deck base plate (B) underneath the faucet. • Apply adequate amount of plumbers putty or sealant underneath the • base plate (B) if necessary. Lead the faucet inlet (A) through faucet holes. Make sure ‘Pioneer’ logo • face toward the front and ensure that han...
4 REV-11 19, 12 Main Supply Connection Connect the faucet inlet (A) to inlet supply lines (J). Then connect the • supply stops (K) to the inlet supply lines (J) (left is hot water supply and right is cold water supply). Make sure inlet supply lines (I) are securely tighten. Do not over tighten.Turn ...