HP GS80 - Manual

HP GS80

HP GS80 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40
41 Page 41
42 Page 42
43 Page 43
44 Page 44
45 Page 45
46 Page 46
47 Page 47
48 Page 48
49 Page 49
50 Page 50
51 Page 51
52 Page 52
53 Page 53
54 Page 54
55 Page 55
56 Page 56
57 Page 57
58 Page 58
59 Page 59
60 Page 60
61 Page 61
62 Page 62
63 Page 63
64 Page 64
65 Page 65
66 Page 66
67 Page 67
68 Page 68
69 Page 69
70 Page 70
71 Page 71
72 Page 72
73 Page 73
74 Page 74
75 Page 75
76 Page 76
77 Page 77
78 Page 78
79 Page 79
80 Page 80
81 Page 81
82 Page 82
83 Page 83
84 Page 84
85 Page 85
86 Page 86
87 Page 87
88 Page 88
Page: / 88

Table of Contents:

  • Page 5 – Contents; Preface; ix; Chapter 1 Overview
  • Page 6 – vi
  • Page 7 – Tables
  • Page 9 – Intended Audience; This manual has four chapters and two appendixes.
  • Page 10 – Documentation Titles; Table 1 HP AlphaServer GS80 Documentation; Title Order; Information on the Internet
  • Page 11 – Overview; Chapter 1
  • Page 12 – AlphaServer GS80 Upgrade Manual; Figure 1–1 A GS80 System
  • Page 13 – System Upgrades; A system upgrade is achieved in three ways:; CPU Upgrades
  • Page 14 – System Drawer 1
  • Page 15 – GS80 Physical Diagram
  • Page 16 – Table 1– 1 Cabinet Models and Power Requirements; Cabinet Model
  • Page 17 – System Upgrade; Chapter 2; Install the power subrack for the second drawer
  • Page 18 – Installing a Power Subrack; Figure 2–1 Installing the Power Subrack
  • Page 20 – Installing the Second Drawer; Figure 2–2 Installing Second Drawer
  • Page 22 – Installing the Distribution Board Assembly; Figure 2–3 Installing the Distribution Board Assembly
  • Page 24 – Global Port, Clock, and Ground Connections; Figure 2–4 Cable Connections-1
  • Page 27 – Figure 2– 5 Cable Connections-2; Connect the global port cables of the upper and lower drawers
  • Page 28 – Figure 2– 6 Cable Connections-3
  • Page 29 – Figure 2– 7 Cable Connections-4
  • Page 30 – Figure 2– 8 Power, Signal, and CSB Connections
  • Page 33 – PCI Box Installation; Chapter 3
  • Page 34 – Installing a PCI Box; Figure 3–1 PCI Box
  • Page 35 – Table 3–1 PCI Box Mounting Hardware; Part Number; assembly
  • Page 36 – Preparing the PCI Box for Installation; Figure 3–2 shows how to prepare the PCI box for installation.; Figure 3–2 Preparing the PCI Box for Installation
  • Page 38 – Preparing the Cabinet for PCI Box Installation; Figure 3–3 Preparing the Cabinet for Installation; Front
  • Page 40 – Installing the PCI Box and Making Cable Connections; Figure 3– 4 Cable Connections of the PCI Box
  • Page 42 – Cabinet; Figure 3– 5 Configurations Based on the Starlight Storage Shelf; Dual AC Cord - Starlight Configurations
  • Page 43 – Dual AC Cord - BA356 Configurations
  • Page 44 – Figure 3– 7 Mounting Locations for the Starlight Storage Shelves
  • Page 46 – Figure 3– 9 Mounting Locations for the PCI Box
  • Page 47 – Figure 3– 10 Mounting Locations for the Memory Channel; Memory Channel - Hole Locations; Use Memor
  • Page 49 – Chapter 4; Control Panel Keyswitch
  • Page 50 – Control Panel Keyswitch; Figure 4–1 Operator Control Panel
  • Page 51 – Table 4–1 explains the functions selected by the keyswitch.; Table 4–1 Keyswitch Functions on the Control Panel; Keyswitch Position
  • Page 52 – Installing the System Management Console; Steps to Install the SMC; Install the SMC terminal server in the GS80 system.; Before you power up the system, inspect the modules
  • Page 53 – Powering Up the System; Example 4– 1 Power-Up Display
  • Page 62 – Q-VET Installation Verification; Q-VET is to be used by Q-VET knowledgeable HP Service Personnel only.
  • Page 63 – Q-VET must be de-installed upon completion of system installation; Swap or Pagefile Space
  • Page 65 – must reboot the system before starting Q-VET.; OpenVMS; QVETAXPxxx.A or QVETAXPxxx.EXE file from the current
  • Page 66 – IVP; and; Long IVP (the IVP tests will then load into the; the; Start All button to begin IVP testing.
  • Page 67 – Graphical Interface
  • Page 68 – Reviewing Results of the Q-VET Run
  • Page 70 – Delete QVETAXP0xx.A and QVETAXPxxx.EXE if they are still on the
  • Page 71 – GS80 Interconnection Diagram; Appendix A
  • Page 72 – Figure A–1 GS80 Interconnection Diagram
  • Page 74 – B.1 Upgrades Retaining Older CPUs; Figure B–1 Installing a CPU
  • Page 75 – Table B– 1 Comparison of CPUs
  • Page 76 – Table B– 1 Comparison of CPUs (Continued); Table B– 2 Comparison of System Drawers
  • Page 77 – Configuration Rules; CPUs are not supported with the 9.0 ns system clock.
  • Page 78 – B.2 Upgrades Replacing Older CPUs; Example B– 1 Updating the Firmware
  • Page 80 – B.3 Changing the Clock Module Switch Settings; Figure B– 2 System Clock Switch Packs
  • Page 81 – Figure B– 3 Accessing the Clock Module
  • Page 83 – Figure B– 4 Setting the B4168 Switch
  • Page 85 – B.6 Replacing the System Cosmetics; Figure B– 5 GS80 Cabinet
  • Page 87 – Index
Loading the manual

Hewlett-Packard Company

AlphaServer GS80

Upgrade Manual

Order Number: EK-GSR80-UP. C01

This manual is for service providers of HP AlphaServer GS80
systems. It discusses system expansion and upgrade of an
original system with faster CPUs.

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Summary

Page 5 - Contents; Preface; ix; Chapter 1 Overview

v Contents Preface ix Chapter 1 Overview 1.1 The System............................................................................................ 1-2 1.2 GS80 Block Diagram ............................................................................. 1-3 1.3 GS80 Physical Diagram ....................

Page 6 - vi

vi 4.4.3 Reviewing Results of the Q-VET Run ................................................. 4-20 4.4.4 De-Installing Q-VET ........................................................................... 4-22 Appendix A GS80 Interconnection Diagram Appendix B Upgrades Using B4166 and B4168CPUs B.1 Upgr...

Page 7 - Tables

vii 3–6 Configurations Based on the StorageWorks Storage Shelf................. 3-11 3–7 Mounting Locations for the Starlight Storage Shelves ....................... 3-12 3–8 Mounting Locations for the StorageWorks Storage Shelves............... 3-13 3–9 Mounting Locations for the PCI Box..............

Other HP Models

All HP Other