Graco 1206 - Manual
Graco 1206 – Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.
Table of Contents:
- Page 3 – GENERAL INFORMATION; SAFETY INFORMATION; WARNING; ILLUSTRATION REFERENCES
- Page 4 – DESCRIPTION OF OPERATION; SETUP PROCEDURE; MOUNTING DISPENSE VALVE
- Page 5 – OPERATING PROCEDURES; WET SYSTEM CHECKOUT
- Page 6 – OPERATION ADJUSTMENTS; PERIODIC MAINTENANCE; DISASSEMBLY
- Page 7 – MODEL 1206 GENERAL ILLUSTRATION
- Page 8 – ASSEMBLY
- Page 9 – TROUBLESHOOTING
- Page 10 – Luer Lock Hub Replacement Needles for Single Needle Block Models; Quantity
- Page 11 – ACCESSORIES; GENERAL ACCESSORIES
- Page 12 – Ring Guidelines
Instructions
Dispensit 1206
332091A
EN
Dispense Valve
Important Safety Instructions
Read all warnings and instructions in this manual.
Save these instructions.
"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.
Summary
GENERAL INFORMATION The Model 1206 Dispense Valve is engineered for applications which require volumetric consistency. The 1206 allows operation with material supply pressures up to 100 psi (6.9 bar). Material viscosity dis pensing capabilities range from very thin material to high - viscosity epoxi...
DESCRIPTION OF OPERATION The 1206 Dispense Valve is a positive displacement valve that requires continuous material feed. The operation of the valve is as follows: Material enters the Dispense Valve through the material inlet port located on the metering rod/sleeve assembly and fills the dispense ca...
OPERATING PROCEDURES DRY SYSTEM CHECKOUT This is an initial checkout to find if the system setup is complete. Conduct the dry system checkout without material in the system. Attach the pneumatic pressure lines from the dispense valve to the air supply controller. Turn on the electric and air supply....