Page 2 - Note to Installer; IMPORTANT; CAUTION; CAUTION; MODELS AVAILABLE; Design Information
Safety Information 2 BEFORE YOU BEGIN Read these instructions completely and carefully. IMPORTANT — Save these instructions for local inspector’s use. IMPORTANT — Observe all governing codes and ordinances. • Note to Installer — Be sure to leave these instructions with the Consumer. • Note to Consum...
Page 3 - PRODUCT DIMENSIONS AND CLEARANCES; Accessory; : HIGH SKILL LEVEL IN
Design Information 3 PRODUCT DIMENSIONS AND CLEARANCES NOTE: Appearance will vary by model. TOOLS AND PARTS REQUIRED (NOT SUPPLIED ) • #2 Phillips screwdriver • Hand-held drill • High speed drill bit, 3/32 Ǝ diameter • 3/8 Ǝ slot-head screwdriver • Level • Saw • 3/8 Ǝ min. plywood for floor (if requ...
Page 4 - Installation Preparation; ELECTRICAL REQUIREMENTS; GROUNDING; WARNING; Improper use of the; DO NOT USE AN EXTENSION CORD.
Installation Preparation 4 ELECTRICAL REQUIREMENTS Single Advantium/Convection 120 Installation: This product requires a 120-volt, 60 Hz, 15-amp circuit and draws 1.8 kilowatts. This product must be connected to a supply circuit of the proper voltage and frequency. • Wire size must conform to the re...
Page 5 - Standard Installation Preparation; Additional clearances between the cutouts; PREPARE THE OPENING; combined installation unless plastic trim is installed.
5 Standard Installation Preparation PREPARE THE OPENING (CONT.) Installation over a GE Appliances/Monogram Warming Drawer: NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location does not obstruct the required interior dep...
Page 6 - Additional clearances between the; For personal safety, the
Standard Installation Preparation 6 PREPARE THE OPENING (CONT.) Installation over a GE Appliances/Monogram Oven and Warming Drawer: NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location does not obstruct the required int...
Page 8 - Installation under a GE Appliances/Monogram 30
PREPARE THE OPENING (cont.) Installation beside another GE Appliances/Monogram Built-in Speedcook Oven: • If you are mounting a GE Appliances/ Monogram Built-In SpeedCook Oven beside another, use the dimensions shown. The middle rail separating the two openings may need to be larger than the 4-1/2 Ǝ...
Page 9 - PREPARE THE INTERIOR; Cut and install side cleats:; minus; Flush Mount Installation Preparation (Monogram Only); TOP; Single Advantium 120 Installation:; • The support must be level and rigidly mounted,
9 PREPARE THE INTERIOR Cut and install side cleats: • Cut side wood cleats to height of cabinet opening and approx. 2-1/2” in depth. Install, on each side, 1-3/8” from the front face of the cabinet. Cut and install bottom cleat: • Cut bottom wood cleat to a height of 1-1/8”, a depth of the cabinet m...
Page 10 - Double Advantium/Convection 120
PREPARE THE OPENING The Advantium/Convection 120 can be installed beside another Advantium/Convection 120 in a side-by-side combination. Double Advantium/Convection 120 Installation: Cut the opening in a cabinet to the dimensions shown. • Center divider acts as cleat for side of each respective unit...
Page 11 - WITH; an Accessory Storage Drawer; without an accessory storage drawer for this model.; STANDARD MOUNT; overlap on the top and 7/8
11 Installation Preparation Preparation WITH an Accessory Storage Drawer • PSB9120 and PWB7030 are the only approved models to be installed under 36-3/4” height with a storage drawer. CSB9120, ZSC1201, ZSC1202 and CWB7030 are not approved. • As needed, see the Standard Mount Installation Preparation...
Page 12 - REMOVE THE PACKAGING AND PARTS; Installation Instructions
1 REMOVE THE PACKAGING AND PARTS 12 Installation Instructions • Remove all packing material and tape.• Locate parts package containing mounting screws. • Remove the oven from the carton. Do not lift unit by handle or conduit. Two people are required to lift this oven. • Open the door and remove any ...
Page 13 - SLIDE THE OVEN INTO THE; DOOR TRIM REMOVAL FOR
Installation Instructions 13 3 SLIDE THE OVEN INTO THE CUTOUT CAUTION Two people are required to lift the oven into the opening. Grasp the bottom at front and rear. DO NOT USE THE HANDLE TO LIFT THE OVEN. DAMAGE WILL OCCUR. • Lift and hold the oven at the front of the opening. Hold the oven at an an...
Page 14 - INSTALL MOUNTING SCREWS; INSTALL BOTTOM TRIM WITH
14 Installation Instructions 6 INSTALL MOUNTING SCREWS • Slide the oven the remaining way into the opening so that the side flanges and control panel are against the cabinet frame. Make sure that the oven is centered in the opening. • Open the door, place a turntable tray in the oven and make sure t...
Page 15 - Notes
Page 18 - Nota para el Instalador; IMPORTANTE; MODELOS DISPONIBLES; Información de Diseños
Información sobre Seguridad 2 ANTES DE COMENZAR Lea estas instrucciones en su totalidad y atentamente. IMPORTANTE — Conserve estas instrucciones para uso del inspector local. IMPORTANTE — Cumpla con todos los códigos y ordenanzas gubernamentales. • Nota para el Instalador — Asegúrese de que el Compr...
Page 19 - DIMENSIONES Y ESPACIOS DE DESPEJE DEL PRODUCTO; El aspecto variará dependiendo del modelo.; PLANIFICACIÓN ANTICIPADA
Información de Diseños 3 DIMENSIONES Y ESPACIOS DE DESPEJE DEL PRODUCTO NOTA: El aspecto variará dependiendo del modelo. HERRAMIENTAS Y PIEZAS REQUERIDAS (NO SUMINISTRADAS) • Destornillador Phillips nº 2 • Perforadora manual • 7DODGURGHDOWDYHORFLGDGGLiPHWURGHƎ • 'HVWRUQLOODGRUFRQSXQWD3KLOOLSVGHƎ • N...
Page 20 - Preparación de la Instalación; REQUISITOS ELÉCTRICOS; UBICACIÓN ELÉCTRICA; ADVERTENCIA; NO USE UN PROLONGADOR.
Preparación de la Instalación 4 REQUISITOS ELÉCTRICOS Instalación Simple del Advantium/Convección 120: Este producto requiere un circuito de 120 voltios, 60 Hz, 15 amperes y consume 1.8 kilowatts. Este producto se debe conectar a un circuito con un suministro correcto de voltaje y frecuencia. • El t...
Page 21 - Preparación de la Instalación Estándar; PREPARACIÓN DE LA ABERTURA
5 Preparación de la Instalación Estándar PREPARACIÓN DE LA ABERTURA (CONT.) Instalación sobre un Cajón para Calentar de GE Appliances/Monogram: NOTA: Se podrán requerir despejes adicionales entre los recortes. Asegúrese de que los soportes del horno sobre la ubicación del Cajón para Calentar no obst...
Page 22 - Preparación para la Instalación Estándar
Preparación para la Instalación Estándar 6 PREPARACIÓN DE LA ABERTURA (CONT.) Instalación sobre un Horno de GE Appliances/Monogram y un Cajón para Calentar: NOTA: Se podrán requerir despejes adicionales entre los recortes. Asegúrese de que los soportes del horno sobre la ubicación del Cajón para Cal...
Page 24 - Mín de 1 1⁄2”
PREPARACIÓN DE LA ABERTURA (cont.) Instalación junto a otro Horno con Velocidad de Cocción Incorporada de GE Appliances/ Monogram: • Si montará un horno de Velocidad de Cocción Incorporado de GE Appliances/ Monogram junto a otro, use las dimensiones mostradas. Es posible que el riel intermedio que s...
Page 25 - PREPARE EL INTERIOR; Corte e instale los ristreles laterales:; Corte e instale el ristrel inferior:; Preparación de la Instalación para el Montaje al Ras; VISTA; Instalación Simple de Advantium 120
9 PREPARE EL INTERIOR Corte e instale los ristreles laterales: • Corte los ristreles de madera laterales a la altura de la abertura del gabinete y a aproximadamente 2 1/2” de profundidad. Instale, a cada lado, a 1 3/8” desde la cara frontal del gabinete. Corte e instale el ristrel inferior: • Corte ...
Page 26 - Altura de
PREPARACIÓN DE LA ABERTURA El Advantium/Convección 120 puede ser instalado junto a otro Advantium/Convección 120 combinando uno al lado del otro. Instalación del Advantium/Convección 120 Doble: Corte la abertura en un gabinete siguiendo las dimensiones mostradas. • El divisor central actúa como un r...
Page 27 - MONTAJE ESTÁNDAR; INSTALACIÓN DEL MONTAJE AL RAS
11 Preparación de la Instalación Preparación CON un Cajón de Almacenamiento de Accesorios • PSB9120 y PWB7030 son los únicos modelos aprobados para su instalación debajo de una altura de 36 3/4” con un cajón de almacenamiento. CSB9120, ZSC1201, ZSC1202 y CWB7030 no están aprobados. • Según sea neces...
Page 28 - RETIRE EL EMBALAJE Y LAS PIEZAS; Instrucciones de Instalación
1 RETIRE EL EMBALAJE Y LAS PIEZAS 12 Instrucciones de Instalación • Retire todo el material de embalaje y la cinta. • Ubique el paquete de piezas que contiene los tornillos de montaje. • Retire el horno del cartón. No levante la unidad de la manija ni del conducto. Es necesario que el horno sea leva...
Page 29 - DESLICE EL HORNO POR LA; RETIRO DE LA MOLDURA DE
Instrucciones de Instalación 13 3 DESLICE EL HORNO POR LA ABERTURA PRECAUCIÓN Se requiere contar con dos personas para colocar el horno en la abertura. Se deberá tomar la parte inferior sobre la parte frontal y trasera. NO USE LA MANIJA PARA LEVANTAR EL HORNO. SE PRODUCIRÁN DAÑOS. • Levante y sosten...
Page 31 - Notas