GE Entelli-Switch 250 - User Manual

GE Entelli-Switch 250

GE Entelli-Switch 250 – User Manual, read for free online in PDF format. We hope this helps you resolve any issues you may have. If you have further questions, please contact us through the contact form.

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
Page: / 32

Table of Contents:

  • Page 2 – Table of Contents
  • Page 3 – Safety / Installation; DA N G E R; HAZARDOUS VOLTAGE; C AU T I O N; W A R N I N G
  • Page 4 – Installation; Initial Energization; C AU T I O N S; GE Zenith Controls
  • Page 6 – Control Connections
  • Page 7 – Entelli-Switch 250 Controller; Microprocessor
  • Page 8 – S 1 O K; M O R E C F G T E S T S E T
  • Page 9 – User Setting for Voltage & Frequency; Source 1
  • Page 10 – Accessory Group Packages; Accessories
  • Page 11 – Accessory Definitions; LNP
  • Page 13 – - If S2 Frequency is greater than S1 Frequency,; UMD
  • Page 14 – How to Set the System Clock; Set System Clock, time and date; Press SAVE (This will enter this value and complete; YEN
  • Page 15 – EXERCISER; How to initiate a new exercise start time; CDT One Event Timer Exerciser
  • Page 16 – CDP Clock Exerciser; How to check the next exercise event
  • Page 17 – Enter six digit access code
  • Page 19 – Entelli-Switch 250 User Setup - System Info; View System Data
  • Page 20 – Testing; Introduction; Test Options
  • Page 21 – N OT I C E; ATS Testing; Standard Transition; Restoration of Source 1 Power:; Delayed Transition; Source 1 Power Failure:
  • Page 22 – Closed Transition
  • Page 23 – ZTSCT Transfer Switch
  • Page 24 – Sequence of Operation; Timer Designations as they appear in the SET menu; ATS Type
  • Page 26 – Transformer Usage; Bill of Material; Bill of Material
  • Page 27 – Delayed / Closed Transition
  • Page 28 – Standard Transition R/T Box Schematic
  • Page 29 – Troubleshooting and Diagnostics; Symptom; General Troubleshooting
  • Page 30 – Maintenance and Testing; Inspection and Cleaning; Insert the handle and operate the
  • Page 32 – USA
Loading the manual

71R-2000

5/03

Operation and Maintenance Manual

Entelli-Switch 250

Microprocessor Controller

Transfer Switch Control Panel

GE Zenith Controls

e

"Loading the manual" means you need to wait until the file loads and becomes available for online reading. Some manuals are very large, and the time they take to appear depends on your internet speed.

Was this manual helpful?

About this manual

Brand
GE
Model
Entelli-Switch 250
Document type
User Manual
Language(s)
English
Pages
32
File size
622.6 KB
Format
PDF

Summary

Page 2 - Table of Contents

Page Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2 Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 3 Equipment Inspection and Storage . . . . . . . . 1 3 Final Equipment Inspection . . . . . . . . . . . . . . 1 3 Installation . . . . . . ...

Page 3 - Safety / Installation; DA N G E R; HAZARDOUS VOLTAGE; C AU T I O N; W A R N I N G

■ GE Zenith Controls 3 ■ Entelli-Switch 250 Operation and Maintenance Manual (71 R -2000) Each GE Zenith transfer switch is factory wired and tested. A complete information package is furnishedwith each switch which includes: a. Sequence of operation. b. Description and operation of all accessories ...

Page 4 - Installation; Initial Energization; C AU T I O N S; GE Zenith Controls

■ 4 GE Zenith Controls ■ Entelli-Switch 250 Operation and Maintenance Manual (71 R -2000) Installation (cont’d) Engine Start Control Connections The engine-start terminals are clearly identified by alabel on the microcontroller backplate. In the case ofmanual transfer switches, or in other applicati...