York D2EB - Manuals

York D2EB – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16

Summary

Page 2 - TABLE 1; - UNIT APPLICATION DATA; TABLE 2; INSTALLATION

LIMITATIONS These units must be installed in accordance with the followingnational and local safety codes. 1. National Electrical Code ANSI/NFPS No. 70 or Canadian Electrical Code Part 1, C22.1 (latest editions). 2. Local plumbing and waste water codes and other applica- ble local codes. Refer to Ta...

Page 4 - Loosen compressor mounting bolts; Unitary Products Group; - TYPICAL FIELD WIRING DIAGRAM; POWER WIRING; 4 VOLT TRANSFORMER; UNIT TERMINAL STRIP; CONTROL WIRING; supplemental electric heat.

POWER AND CONTROL WIRING Field wiring to the unit must conform to provisions of the currentN.E.C. ANSI/NFPA No. 70 or C.E.C. and/or local ordinances.The unit must be electrically grounded in accordance with localcodes or, in their absence, with the N.E.C./C.E.C. Voltage toler-ances which must be mai...

Page 7 - Checking Supply Air CFM; Remove the two 1⁄4 inch dot plugs in the duct panel.; NOTE; : De-energize the compressors before taking any test; DEB Coil Delta P vs Airflow; ID Coil Delta P

Checking Supply Air CFM To check the supply air CFM after the initial balancing has beencompleted: 1.Remove the two ¼ inch dot plugs in the duct panel. 2.Insert at least 8 inches of ¼ inch tubing into each of theseholes for sufficient penetration into the airflow on both sides ofthe indoor coil. 3.U...

York Manuals