Wayne WCP85 - Manuals

Wayne WCP85 – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12

Summary

Page 2 - Installation; STEP 1: INSTALLATION OF PIPE

will void the warranty and makethe pump inoperable. Where a 2-prong wall receptacle isencountered, it must be replaced witha properly grounded 3-prong re cep ta -cle installed in accordance with the NECand local codes and ordinances. 12. All wiring should be performed by a qualified elec tri cian. 1...

Page 3 - TIPS FOR EASY INSTALLATION

3 WCP85 Installation (Continued) furnace drain (if applicable), to theinlet holes on the pump. Refer toFigure 5. STEP 4: INSTALLATION OFDISCHARGE LINE NOTE: Use 3/8” I.D. (max.) flexible tubing.. A hose clamp is recommended(not provided). A. Extend discharge pipe from barbed check valve to the highe...

Page 4 - Maintenance; CLEANING CHECK VALVE

Operating Instructions 4 for efficient operation. 5. Avoid overtightening of check valve after cleaning. (Refer toMaintenance gudelines.) 6. Use constant voltage power source. Do not plug into a device that runsintermittently. 7. Locate model number and date code on pump and take note ofthem. 8. To ...

Wayne Manuals