US Stove Company ASA7 - Manuals

US Stove Company ASA7 – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20

Summary

Page 2 - SAFETY PRECAUTIONS; OR

2 USSC SAFETY PRECAUTIONS PLEASE READ THIS ENTIRE MANUAL BEFORE YOU INSTALL AND USE YOUR NEW HEATING APPLIANCE. FAIL-URE TO FOLLOW INSTRUCTIONS MAY RESULT IN PROPERTY DAMAGE, BODILY INJURY, OR EVEN DEATH. THIS HEATING APPLIANCE SHOULD BE INSTALLED ONLY BY AN EXPERIENCED COAL HEATER INSTALLER. IFTHIS...

Page 3 - Shaker Handle Assembly:; Attach to the unit with the bolts removed in step 1.; Flue Collar Assembly:

USSC 3 Before Assembly, inspect the heater thoroghly formissing parts or shipping damage. If any damage ormissing parts are detected, report it to your heater dealer. DO NOT INSTALL OR USE A DAMAGED ORINCOMPLETE HEATER Shaker Handle Assembly: 1. First, remove the two(2) bolts from the left side of t...

Page 4 - MASONRY CHIMNEY REQUIREMENTS

4 USSC FIGURE 1 -MASONRY CHIMNEYREQUIREMENTS FLUE MINIMUM 1/2" AIR SPACE FOUNDATION CHIMNEY WALL 4"NOMINAL 5/8" FIRECLAY ORSTAINLESS STEALFLUE LINER If the heater is to be connected to a masonry chimney, the heater should not be installed until it is determined that thechimney is safe fo...

US Stove Company Manuals