Skil PE Series - Manuals

Skil PE Series – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18
19 Page 19
20 Page 20
21 Page 21
22 Page 22
23 Page 23
24 Page 24
25 Page 25
26 Page 26
27 Page 27
28 Page 28
29 Page 29
30 Page 30
31 Page 31
32 Page 32
33 Page 33
34 Page 34
35 Page 35
36 Page 36
37 Page 37
38 Page 38
39 Page 39
40 Page 40

Summary

Page 2 - Ordering Replacement or Extra Parts; LOADING INSTRUCTIONS; OPERATING INSTRUCTIONS

2 Mechanical Operation • Series FM 1.) Remove the lever from right side of bumper box andinsert it into the socket of the back plate (the socket ison right hand side). 2.) Pull the handle back until the leveler plate is fullyextended and leaning back towards the ramp. 3.) Push the handle forward to ...

Page 3 - INSTALLATION INSTRUCTIONS; Height Differential

3 Recommended dock edge for new construction The recommended dock edge for newconstruction is a well anchored 6 inchchannel (8.2 lb. minimum). Concrete "J"anchors shall be 1½ inches wide with alength of 6 inches plus 1½ inches bent at90 degrees on the end. Minimum materialthickness shall be ...

Page 4 - Bolt On Installation

4 Weld On Installation (dock edge steel is 6" or greater) Bolt And Weld On Installation (dock edge steel is less than 6") 1. Remove all material and protrusions from the faceof the dock. 2. Center the ramp in the doorway and tack weld ateach end. Be certain the mounting plate does notextend ...

Skil Manuals