Page 2 - Thank You For Choosing Pioneer Products; Care Instructions
2 REV-11 19, 12 Thank You For Choosing Pioneer Products Thank you for purchasing this quality product. Pioneer products are rigorously tested to provide long service under normal conditions. Prior to installation, familiarize yourself with this products diagram. Make sure that you have all of the il...
Page 5 - Parts Breakdown Drawing-4MT200T
Page 7 - Parts Breakdown Drawing-4MT300T
Page 8 - Engineering Excellence; E ng ine e r ing E xc e l l e nc e
8 REV-11 19, 12 3325 S. Garfield Ave. | Commerce, CA 90040 Telephone: (800) 338-9468 | (323) 888-8873 | Fax: (323) 888-9515 Hours: M - F, 7:30am to 5:00pm PST www.pioneerind.com Engineering Excellence E ng ine e r ing E xc e l l e nc e
Page 2 - Thank you for purchasing this Pioneer quality product.; Tools Required; Strap Wrench; Prior to Installation; Observe all local plumbing and building codes before you begin; Caution
2 REV-12 2, 13 Thank you for purchasing this Pioneer quality product. Tools Required Strap Wrench Teflon Tape Thermometer Allen Wrench Plumbers Putty Prior to Installation Observe all local plumbing and building codes before you begin • installation. The finished wall and tub/shower valve (4020B or ...
Page 3 - CXC Installation
3 REV-12 2, 13 Trim Installation (For 4MT100T, 4MT200T) Remove the temporary nipple. • IPS Installation:- • The 1/2” threaded pipe nipple must be kept with a length of 1-3/8” from • finished wall. For tub spout(A) with tub spout escutcheon(B) slide the spout • escutcheon(B) along the threaded pipe n...
Page 4 - Remove the temporary nipple.; Note:- The 1/2” threaded pipe nipple must be kept with a length of; Apply teflon tape at the threaded connection. Screw diverter tub
4 REV-12 2, 13 Trim Installation(For 4MT110T, 4MT120T) Remove the temporary nipple. • IPS Installation:- • Note:- The 1/2” threaded pipe nipple must be kept with a length of • 7/16” from finished wall. Apply teflon tape at the threaded connection. Screw diverter tub • spout(C) onto the pipe nipple a...
Page 6 - Trim Installation; Turn off the main water supply
6 REV-12 2, 13 Trim Installation Turn off the main water supply 1. Remove test cap (G) with the help of 1-11/32” socket, relive the water 2. pssure ensure all the debris are flushed out of the system. Thread sleeve (H) to the valve body. Insert the cartridge (I) to the valve 3. body. Ensure to insta...
Page 8 - placed behind the face plate (N) to form water tight seal. Slide the es
8 REV-12 2, 13 Trim Installation Place the face plate(N) on the valve. Ensure the rubber gasket(M) is • placed behind the face plate (N) to form water tight seal. Slide the es - cutcheon (O) on the valve.Use silicon to caulk around the face plate (N). • Secure the handle (R) by tightening the allen ...
Page 10 - Engineering Excellence; E ng ine e r ing E xc e l l e nc e
10 REV-12 2, 13 3325 S. Garfield Ave. | Commerce, CA 90040 Telephone: (800) 338-9468 | (323) 888-8873 | Fax: (323) 888-9515 Hours: M - F, 7:30am to 5:00pm PST www.pioneerind.com Engineering Excellence E ng ine e r ing E xc e l l e nc e
Page 2 - Thank You For Choosing Pioneer Products; Thank you for purchasing this quality product.; Care Instructions; to the following simple care instructions:
2 REV-11 15, 12 Thank You For Choosing Pioneer Products Thank you for purchasing this quality product. Pioneer products are rigorously tested to provide long service under normal conditions. Prior to installation, familiarize yourself with this products diagram. Make sure that you have all of the il...
Page 4 - Parts Breakdown-4BR8X0; Brentwood Porcelain Lever Handles (For 4BR810)
4 REV-11 15, 12 Parts Breakdown-4BR8X0 ITEM# DESCRIPTION A X-1400008C,H* Brentwood Lever Handles (For 4BR800) B X-1400009C,H* Brentwood Porcelain Lever Handles (For 4BR810) C X-1400010C,H* Brentwood Porcelain Cross Handles (For 4BR820) D X-1400011C,H* Brentwood Beaux Lever Handles (For 4BR830) E X-4...
Page 5 - Parts Breakdown Drawing-4BR8X0
Page 6 - Engineering Excellence; E ng ine e r ing E xc e l l e nc e
6 REV-11 15, 12 3325 S. Garfield Ave. | Commerce, CA 90040 Telephone: (800) 338-9468 | (323) 888-8873 | Fax: (323) 888-9515 Hours: M - F, 7:30am to 5:00pm PST www.pioneerind.com Engineering Excellence E ng ine e r ing E xc e l l e nc e