La Crosse Technology WT-5720 - Manuals

La Crosse Technology WT-5720 – Manual in PDF format online.

Manuals:

1 Page 1
2 Page 2
3 Page 3
4 Page 4
5 Page 5
6 Page 6
7 Page 7
8 Page 8
9 Page 9
10 Page 10
11 Page 11
12 Page 12
13 Page 13
14 Page 14
15 Page 15
16 Page 16
17 Page 17
18 Page 18

Summary

Page 2 - Detailed Set-Up Guide; Program Mode; Features & Operations

2 TABLE OF CONTENTS Topic Page Inventory of Contents/ Additional Equipment 3 About WWVB 3 Quick Set-Up Guide 4 Detailed Set-Up Guide Battery Installation 5 Program Mode Programming Sequence 6 Function Buttons 6 Time Zone Setting 6-7 DST (Daylight Saving Time) Setting 7 Adjustable Snooze 7-8 Time Set...

Page 3 - INVENTORY OF CONTENTS; AC adapter/transformer

3 INVENTORY OF CONTENTS 1) WT-5720 projection alarm 2) AC adapter/transformer 3) Instruction manual and warranty card. ADDITIONAL EQUIPMENT (not included) 1) Two fresh 1.5V AA batteries (optional for projection alarm) ABOUT WWVB (Radio Controlled Time) The NIST (National Institute of Standards and T...

Page 5 - Remove the battery cover.

5 DETAILED SET-UP GUIDE I. BATTERY INSTALLATION A. Projection Alarm 1. Remove the battery cover. 2. Observe the correct polarity, and install 2 AA batteries. 3. In addition or instead of inserting batteries, the AC adapter can be used. Simply plug the adapter into the receptacle on the underneath of...

La Crosse Technology Manuals