60kW InfraStruXure PDU—Operation and Configuration i About This Manual Audience This manual is intended for end-users of a 60 kW InfraStruXure PDU. It covers the operation, customization, and quick configuration of the PDU, and includes basic InfraStruXure system operation. Companion manuals For add...
Page 5 - Contents
Contents 60kW InfraStruXure PDU—Operation and Configuration iii Safety ......................................................................1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Save these instructions . . . . . . . . . . . . . . . . . . . . ...
Page 9 - Safety; Overview; Save these instructions
60kW InfraStruXure PDU—Operation and Configuration 1 Safety Overview Save these instructions This manual contains important instructions that must be followed during installation, operation, and maintenance of the PDU. Safety symbols used in this manual Cross-reference symbols used in this manual El...
Page 10 - Warnings; Installation/maintenance; Maintenance performed while the PDU is receiving input power; Total Power Off; Main Input
2 60kW InfraStruXure PDU—Operation and Configuration Warnings Unpacking/moving DO NOT tilt the PDU greater than 45° from its vertical axis. Never lay the PDU on its side. Installation/maintenance Only a certified electrician can perform these tasks: • Connect the PDU to its power source• Connect a s...
Page 11 - EMI
Safety 60kW InfraStruXure PDU—Operation and Configuration 3 Emergency Power Off (EPO) This InfraStruXure PDU is provided with an Emergency Power Off switch connection. When this EPO switch is energized, electrical power to the units is de-energized and the system will not transfer to on-battery oper...
Page 13 - PDU Display Interface
60kW InfraStruXure PDU—Operation and Configuration 5 PDU Display Interface Overview Use the display interface to configure settings, set alarm thresholds, and provide audible and visual alarms. ESC ? LoadPowered Chec kLog Bypass Alarm Load Powered LED When green, all output phase...
Page 14 - Top-level status screens; Navigating through screens
PDU Display Interface 6 60kW InfraStruXure PDU—Operation and Configuration Top-level status screens After displaying a brief start-up screen after system start-up, the display interface scrolls automatically and continuously through four screens of basic status information. Press the Up and Down arr...
Page 15 - Password-protected screens
PDU Display Interface 60kW InfraStruXure PDU—Operation and Configuration 7 On some screens, continue arrows ( indicate that there are additional screens to view in the category. Press the Up or Down arrow key to view the additional screens. Password-protected screens When configuring or changing ...
Page 17 - Output Voltage; Input Voltage
60kW InfraStruXure PDU—Operation and Configuration 9 Volt-Meter Screen From the Volt-Meter screen, you can select the following items: Output Voltage Displays each phase-to-phase output voltage (e.g., L1-2 for phase L1 to phase L2) and each phase-to-neutral output voltage (e.g., L1 for phase L1 to n...
Page 18 - Contacts Screen
10 60kW InfraStruXure PDU—Operation and Configuration Contacts Screen Overview The PDU can monitor external contact closure events. Possible applications include the following: • Magnetic contact switches• Window foil• Tamper switches• Heat detectors• Water sensors• Pressure sensors• Building smoke ...
Page 20 - How to connect contacts to the PDU monitoring unit
PDU Display Interface 12 60kW InfraStruXure PDU—Operation and Configuration How to connect contacts to the PDU monitoring unit 1. Choose one or more contact numbers on the user connection plate to which you will connect the contacts. The user connection plate connects to the User/EPO port on the PDU...
Page 21 - Breakers Screen; Open; Closed
60kW InfraStruXure PDU—Operation and Configuration 13 Breakers Screen Use the Breakers screen to view the status of the system and PDU circuit breakers. Main Input Reports status of PDU Main Input switch ( Open or Closed ). Under normal operation, this switch is Closed .
Page 22 - Alarms Screen; View Active Alarms; Alarms; Entire Log; Clear Log
14 60kW InfraStruXure PDU—Operation and Configuration Alarms Screen View Active Alarms Use this option of the Alarms screen to display active alarms (alarms that have not been resolved). Scroll through the list to view each active alarm. Alarm/Event Log Use this selection of the Alarms screen to acc...
Page 23 - Alarm Setup
PDU Display Interface 60kW InfraStruXure PDU—Operation and Configuration 15 Alarm Setup Use this option of the Alarms screen to access the following options: Alarm Beeper Use this option of the Alarms screen to turn the alarm beeper ON or OFF. Loading Limits Configure the following in amps and as a ...
Page 24 - PDU Alarms; All Possible Alarms
PDU Display Interface 16 60kW InfraStruXure PDU—Operation and Configuration PDU Alarms This table lists all alarms that can be generated by the PDU, as displayed by the All Possible Alarms option, with numeric variables between the < > characters. Logged alarms will display specific numbers in...
Page 25 - Panel Screen; Branch Ckt Loading; Branch Ckt Limits
60kW InfraStruXure PDU—Operation and Configuration 17 Panel Screen Branch Ckt Loading You can display Branch Ckt Loading (Branch Circuit Loading) status if the option to measure current at the distribution circuit breakers is installed. You can view data for each individual panel position on the dis...
Page 26 - Panel Configuration; Pos
PDU Display Interface 18 60kW InfraStruXure PDU—Operation and Configuration Panel Configuration Configure the branch metering settings for each circuit breaker on the distribution panel, or configure both panels simultaneously. To configure a circuit breaker, select the range that includes the circu...
Page 27 - Global Panel Config; Poles; Apply Now; YES
PDU Display Interface 60kW InfraStruXure PDU—Operation and Configuration 19 Global Panel Config Configures the same number of poles or circuit breaker ratings for all circuit breakers in both distribution panels simultaneously. For example, if your system uses only 3-pole, 16-amp circuit breakers, c...
Page 28 - Config Screen
20 60kW InfraStruXure PDU—Operation and Configuration Config Screen System/Network Use this option of the Config screen to access these options: System Password • Password : Change the system password required to access protected screens and fields in the display interface. Enter a string of up to e...
Page 29 - Electrical Config
PDU Display Interface 60kW InfraStruXure PDU—Operation and Configuration 21 Electrical Config This option of the Config screen displays information about the electrical service that provides input to the PDU. All of the values displayed on this screen are set at the factory. Use this information whe...
Page 30 - System ID
PDU Display Interface 22 60kW InfraStruXure PDU—Operation and Configuration System ID Use this option of the Config screen to identify your PDU. The following fields can be configured: Factory Defaults Use this option of the Config screen to reset all PDU settings to their factory default values. Fi...
Page 31 - InfraStruXure PDU; Front view; PDU Shielding Trough
60kW InfraStruXure PDU—Operation and Configuration 23 Overview InfraStruXure PDU Front view The PDU Shielding Trough accommodates the power cables exiting the roof of the PDU, and separates power cables from data cables. The PDU power cables supply power to equipment racks; they are fed through ...
Page 32 - 2-position circuit breaker panels
Overview 24 60kW InfraStruXure PDU—Operation and Configuration Front view (interior) The two 42-position circuit breaker panels provide 84 total single pole positions. Each single pole provides power at 230 volts L-N. The amperage each position provides depends on the size of the circuit breaker u...
Page 33 - Rear view of PDU with transformer (interior); Main input
Overview 60kW InfraStruXure PDU—Operation and Configuration 25 Rear view of PDU with transformer (interior) The Main input switch connects to your main power source. The switch accepts 400V input and requires L1, L2, L3, and PE input conductors. The PDU monitoring unit has several current and vo...
Page 34 - Rear view of PDU without transformer (interior); PDU monitoring unit
Overview 26 60kW InfraStruXure PDU—Operation and Configuration Rear view of PDU without transformer (interior) The Main input circuit breaker connects to either the upstream UPS or Mains. The circuit breaker accepts 400V input and requires L1, L2, L3, N, and PE input conductors. Note : This breake...
Page 36 - User connection plate; ethernet port; input contact connections; relay output connections; EPO connections
Overview 28 60kW InfraStruXure PDU—Operation and Configuration User connection plate For a detailed description of the user connection plate, see ( ) on page 24. For clarity, the user connection plate in the following illustration is shown in greater detail. Connect the InfraStruXure PDU to the ...
Page 37 - System Operation; How to Apply Power to the System
60kW InfraStruXure PDU—Operation and Configuration 29 System Operation How to Apply Power to the System 1. Close (turn ON) the main circuit breaker of the power source supplying power to the PDU. 2. Close (turn ON) the Main Input on the PDU. 3. Power the PDU distribution circuit breakers . For PDUs ...
Page 38 - How to Ensure Total Power Off; power source; Main Output
30 60kW InfraStruXure PDU—Operation and Configuration How to Ensure Total Power Off 1. Open (turn OFF) the main breaker on the power source feeding the PDU. 2. Open (turn OFF) the Main Input switch on the PDU. 3. For PDU with transformer : Open (turn OFF) the Main Output circuit breaker on the front...
Page 39 - Communication Configuration; InfraStruXure PDU Management Options
60kW InfraStruXure PDU—Operation and Configuration 31 Communication Configuration InfraStruXure PDU Management Options Overview You have two management options for the InfraStruXure PDU. You can manage the InfraStruXure PDU along with the rest of your InfraStruXure equipment through the InfraStruXur...
Page 40 - Configuring the InfraStruXure Manager; Connect the InfraStruXure PDU to the InfraStruXure Manager
32 60kW InfraStruXure PDU—Operation and Configuration Configuring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure Manager 1. Connect a Cat-5 network cable to the surge-protected ethernet port on the PDU user connection plate. You can make connections from inside the encl...
Page 41 - Connect the InfraStruXure PDU to your network
60kW InfraStruXure PDU—Operation and Configuration 33 Configuring the Network Management Interface Connect the InfraStruXure PDU to your network 1. Connect a Cat-5 network cable to the surge-protected ethernet port on the PDU user connection plate. You can make connections from inside the enclosure,...
Page 42 - TCP/IP configuration methods; Start; Start a Web browser when finished
Communication Configuration 34 60kW InfraStruXure PDU—Operation and Configuration TCP/IP configuration methods Use one of the following methods to define the TCP/IP settings needed by the InfraStruXure PDU: • Device IP Configuration Wizard (See “Device IP Configuration Wizard” on this page.) • BOOTP...
Page 43 - BOOTP & DHCP configuration
Communication Configuration 60kW InfraStruXure PDU—Operation and Configuration 35 BOOTP & DHCP configuration The Boot Mode setting, a TCP/IP option in the InfraStruXure PDU’s Network menu, identifies how the TCP/IP settings will be defined. The possible settings are Manual , DHCP only , BOOTP on...
Page 44 - User Name; DHCP Cookie Is
Communication Configuration 36 60kW InfraStruXure PDU—Operation and Configuration 3. When the InfraStruXure PDU reboots, the BOOTP server provides it with the TCP/IP settings. – If you specified a bootup file name, the InfraStruXure PDU attempts to transfer that file from the BOOTP server using TFTP...
Page 45 - Local access to the control console; Remote access to the control console
Communication Configuration 60kW InfraStruXure PDU—Operation and Configuration 37 Local access to the control console You can use a local computer that connects to the InfraStruXure PDU through the console port on the InfraStruXure PDU monitoring unit to access the control console. 1. Select a seria...
Page 46 - Control console
Communication Configuration 38 60kW InfraStruXure PDU—Operation and Configuration 2. Use Ping with a size of 113 bytes to assign the IP address defined by the ARP command. For the IP address defined in step 1, use one of the following Ping commands: – Windows command format: ping 156.205.14.141 -l 1...
Page 47 - Web interface
60kW InfraStruXure PDU—Operation and Configuration 39 How to Access a Network Management Interface on a Configured InfraStruXure PDU Web interface As your browser, you can use Microsoft ® Internet Explorer 5.0 (and higher) or Netscape ® 4.0.8 (and higher, except Netscape 6. x ) to access the InfraSt...
Page 48 - Telnet for basic access.; SNMP
Communication Configuration 40 60kW InfraStruXure PDU—Operation and Configuration Telnet for basic access. Telnet provides the basic security of authentication by user name and password, but not the high-security benefits of encryption. To use Telnet to access an InfraStruXure PDU’s control console ...
Page 49 - FTP and SCP
Communication Configuration 60kW InfraStruXure PDU—Operation and Configuration 41 FTP and SCP You can use FTP (enabled by default) or Secure CoPy (SCP) to transfer new firmware to the InfraStruXure PDU, or to access a copy of the InfraStruXure PDU’s event logs. SCP provides the higher security of en...
Page 51 - Customizing and Updating the PDU; Important Safety Instructions; in the hazards of live electrical installation.
60kW InfraStruXure PDU—Operation and Configuration 43 Customizing and Updating the PDU Important Safety Instructions Electrical Hazard APC does not recommend that you perform maintenance of the PDU while it is receiving input power. However, due to the critical nature of data center loads, this may ...
Page 52 - PDU Orderable Part List; Breakers; Power Cables
44 60kW InfraStruXure PDU—Operation and Configuration PDU Orderable Part List Breakers 0M-1293 10 A, single-pole breaker 0M-1706 32 A with 100 mA ELCB, three-pole breaker 0M-1304 16 A, single-pole breaker 0M-1707 32 A with 30 mA ELCB, three-pole breaker 0M-1703 16 A with 30 mA ELCB, two-pole breaker...
Page 53 - Add a circuit breaker on the PDU
60kW InfraStruXure PDU—Operation and Configuration 45 How to Add Circuit Breakers and Power Cables Add a circuit breaker on the PDU 1. Move the clip on the back of the circuit breaker to correspond to the phase to which you are connecting to ( L1 , L2 , or L3 ). 2. Snap the new single-pole circuit b...
Page 54 - P E
Customizing and Updating the PDU 46 60kW InfraStruXure PDU—Operation and Configuration 4. At the front of the PDU, connect the power cord’s individual wires: a. If you have branch current monitoring installed, route the phase conductor through a current sensor. b. Connect the line wire to the circui...
Page 57 - Connecting the switch.; Test
60kW InfraStruXure PDU—Operation and Configuration 49 How to Test the Emergency Power Off Switch Overview Connecting the switch. The Emergency Power Off (EPO) switch connects to the PDU user connection plate. The figure on the right shows the location of the user connection plate on the roof of the ...
Page 58 - Configuring and testing.; Testing the switch
Customizing and Updating the PDU 50 60kW InfraStruXure PDU—Operation and Configuration Configuring and testing. Configuring and testing of the switch is done through the EPO interface on the PDU monitoring unit. The figure to the right shows the PDU monitoring unit and the location of the EPO LEDs a...
Page 59 - Arm; Problem
Customizing and Updating the PDU 60kW InfraStruXure PDU—Operation and Configuration 51 c. Observe the EPO LEDs. If the switch is wired and working properly, when the switch is engaged, both of the EPO state LEDs are red. d. If the test was successful, place the Arm/Test rocker switch back to the Arm...
Page 60 - How to Download Firmware Upgrades; Upgrading the PDU monitor processor
52 60kW InfraStruXure PDU—Operation and Configuration How to Download Firmware Upgrades Upgrading the PDU monitor processor You can download available PDU monitor processor upgrades through the PDU display interface. The most obvious indication that a firmware upgrade is necessary occurs when the Ne...
Page 61 - Control Console
Customizing and Updating the PDU 60kW InfraStruXure PDU—Operation and Configuration 53 6. From the Control Console menu, select System , then Tools , then File Transfer , then XMODEM . 7. The system will prompt you with Perform transfer with XMODEM -CRC? Type Yes and press E NTER . 8. The system wil...
Page 63 - Specifications
60kW InfraStruXure PDU—Operation and Configuration 55 Specifications InfraStruXure PDU Electrical With Transformer Without Transformer Output Voltage AC L1, L2, L3, N, PE 400/230 V: 3W, N, PE Full Load Rating 60 kVA 100 A Nominal Current 167 A 180 A Number of Distribution Panels 2 × 225 A, 42-positi...
Page 65 - Product Information; InfraStruXure Standard Warranty
60kW InfraStruXure PDU—Operation and Configuration 57 Product Information InfraStruXure Standard Warranty APC warrants that all components of the InfraStruXure system will be free from defect in material and workmanship for a period of two years from the date of start up when start up has been perfo...
Page 67 - APC Three-Phase Systems
60kW InfraStruXure PDU—Operation and Configuration 59 Life-Support Policy APC Three-Phase Systems As a general policy, American Power Conversion Corporation and its affiliates and subsidiaries worldwide (APC) do not recommend the use of any of its products in life support applications where failure ...
Page 68 - How to Obtain Service; How to Contact APC
60 60kW InfraStruXure PDU—Operation and Configuration How to Obtain Service How to Contact APC Customer support for this or any other APC product is available at no charge in any of the following ways: • Visit the APC Web site to access documents in the APC Knowledge Base and to submit any customer ...
Page 69 - Appendix A: Changes in This Manual
60kW InfraStruXure PDU—Operation and Configuration 61 Appendix A: Changes in This Manual Overview The following list documents the specific changes made to this manual since its last release (990-1662B). General changes Communication configuration instructions were added. See pages 31–41. Changes by...
Page 71 - Index
Index 60kW InfraStruXure PDU—Operation and Configuration 63 A Alarm beeper , 20 Alarm LED , 11 Alarm relay map , 17 Alarm types , 22 Alarm/event log , 20 Alarms screen , 20 – 22 B BOOTP configuration , 35 Branch current monitor ports , 9 Breakers screen , 19 Bypass LED , 11 C Cable access holes , 5 ...
Page 76 - APC Worldwide Customer Support
*990-1662C-001* APC Worldwide Customer Support Customer support for this or any other APC product is available at no charge in any of the following ways: • Visit the APC Web site to access documents in the APC Knowledge Base and to submit customer support requests.– www.apc.com (Corporate Headquarte...