APC PD80KG6FK1-M - Manuals
APC PD80KG6FK1-M – Manual in PDF format online.
Manuals:
Manual APC PD80KG6FK1-M
Summary
80kW InfraStruXure PDU—Operation and Configuration i About This Manual Audience This manual is intended for end-users of an 80 kW InfraStruXure PDU. It covers the operation, customization, and quick configuration of the InfraStruXure PDU. It also includes basic InfraStruXure system operation. Compan...
Contents 80kW InfraStruXure PDU—Operation and Configuration iii Safety ......................................................................1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 Save these instructions . . . . . . . . . . . . . . . . . . . . ...
iv 80kW InfraStruXure PDU—Operation and Configuration Contacts Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Breakers Screen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Alarms Screen . . . . . . . . . . . . . . . . . . . . . . . . . . ...
80kW InfraStruXure PDU—Operation and Configuration v Configuring the Network Management Interface . . . . . . . . . . . 45 Connect the InfraStruXure PDU to your network . . . . . . . . . 45 Configuration Overview . . . . . . . . . . . . . . . . . . . . . . . . . . 45 TCP/IP configuration methods . ....
80kW InfraStruXure PDU—Operation and Configuration 1 Safety Overview Save these instructions This manual contains important instructions that must be followed during installation, operation, and maintenance of the PDU. Safety symbols used in this manual Cross-reference symbols used in this manual El...
2 80kW InfraStruXure PDU—Operation and Configuration Warnings Installation/Maintenance Only a certified electrician can perform these tasks: • Connect the InfraStruXure PDU to utility power• Connect the cross tie output breaker to another InfraStruXure PDU• Connect a switch to the EPO interface on t...
Safety 80kW InfraStruXure PDU—Operation and Configuration 3 Total Power Off 1. Set the Symmetra PX UPS System Enable switch to Off. 2. Set the DC Disconnect breaker of each Battery Enclosure to Off. 3. Set the PDU Main Input ( A ) switch to Off. 4. If applicable, set the PDU Bypass Input ( B ) switc...
Safety 4 80kW InfraStruXure PDU—Operation and Configuration EMI This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equi...
80kW InfraStruXure PDU—Operation and Configuration 5 Overview InfraStruXure PDU Components The APC 80 kW InfraStruXure PDU provides distribution and management of electrical power. The InfraStruXure PDU has the capacity of 80 kW, accepts 208, 480, or 600 V, 3-phase input, and distributes 208 V, 3-ph...
Overview 6 80kW InfraStruXure PDU—Operation and Configuration PDU front view (exterior) PDU wide shielding troughs— The PDU shielding troughs accommodate the power cables exiting the roof of the PDU. Power Cables— These power cables feed equipment racks; they are fed through knockout panels on t...
Overview 80kW InfraStruXure PDU—Operation and Configuration 7 Front view (interior) Ground lugs — Ground lugs are provided for the Main Input switch, Bypass Input switch, and Cross Tie Output breaker. The main input lug has two holes: one for a main ground and one for the GEC. See the instruction ...
Overview 8 80kW InfraStruXure PDU—Operation and Configuration Front view (door open) Wraparound maintenance bypass panel — The maintenance bypass panel has three circuit breakers that allow the UPS to be electrically isolated from the main power source, while maintaining the power panels. The inpu...
Overview 80kW InfraStruXure PDU—Operation and Configuration 9 Rear view (interior) 42-position circuit breaker panel —Each PDU has a circuit breaker panel with 42 pole positions. Each pole provides power at 120 volts L-N or 208 volts L-L. The amperage each position provides depends on the size of ...
Overview 10 80kW InfraStruXure PDU—Operation and Configuration PDU monitoring unit This connection provides the input power for the PDU monitoring unit. The power is supplied by the monitoring unit circuit breaker on the front of the PDU. If the panel is on, and the monitoring unit circuit breaker...
Overview 80kW InfraStruXure PDU—Operation and Configuration 11 User connection plate For a description and location of the user connection plate, see ( ) on page 8. For clarity, the user connection plate is shown in the following illustration in greater detail. \ Connect the InfraStruXure PDU to...
80kW InfraStruXure PDU—Operation and Configuration 13 PDU Display Interface Overview You can use the display interface to configure settings, set alarm thresholds, and provide audible and visual alarms. ESC ? LoadPowered Chec kLog Bypass Alarm Load On LED When green, all output p...
PDU Display Interface 14 80kW InfraStruXure PDU—Operation and Configuration Top-level status screens After system start-up, the display interface displays a brief start-up screen and then scrolls automatically and continuously through four screens of basic status information. Press the Up and Down a...
PDU Display Interface 80kW InfraStruXure PDU—Operation and Configuration 15 On some screens, continue arrows ( indicate that there are additional screens to view in the category. Press the Up or Down arrow key to view the additional screens. Password-protected screens When configuring or changing...
80kW InfraStruXure PDU—Operation and Configuration 17 Volt-Meter Screen From the Volt-Meter screen, you can select the following items: Output Voltage Displays each phase-to-phase output voltage (e.g., L1-2 for phase L1 to phase L2) and each phase-to-neutral output voltage (e.g., L1 for phase L1 to ...
18 80kW InfraStruXure PDU—Operation and Configuration Contacts Screen Overview The PDU can monitor external contact closure events. Possible applications include the following: • Magnetic contact switches• Window foil• Tamper switches• Heat detectors• Water sensors• Pressure sensors• Building smoke ...
PDU Display Interface 20 80kW InfraStruXure PDU—Operation and Configuration How to connect contacts to the PDU monitoring unit 1. Choose one or more contact number on the User/EPO contacts port on the user connection plate to which you will connect the contacts. The user connection plate is connecte...
80kW InfraStruXure PDU—Operation and Configuration 21 Breakers Screen Use the Breakers screen to view the status of the system and PDU circuit breakers. UPS & System Bypass Reports the operation mode of the UPS and the state of the Q1, Q2, and Q3 circuit breakers on the PDU. Main Input Reports s...
22 80kW InfraStruXure PDU—Operation and Configuration Alarms Screen View Active Alarms Use this option of the Alarms screen to display active alarms (alarms that have not been resolved). Scroll through the list to view each active alarm. Alarm/Event Log Use this selection of the Alarms screen to acc...
PDU Display Interface 80kW InfraStruXure PDU—Operation and Configuration 23 Alarm Setup Use this option of the Alarms screen to access the following options: Alarm Beeper Use this option of the Alarms screen to turn the alarm beeper ON or OFF. Loading Limits Configure the following in amps and as a ...
PDU Display Interface 24 80kW InfraStruXure PDU—Operation and Configuration PDU Alarms This table lists all alarms that can be generated by the InfraStruXure PDU, as displayed by the All Possible Alarms option, with numeric variables between the < > characters. Logged alarms will display speci...
80kW InfraStruXure PDU—Operation and Configuration 25 Panel Screen Branch Ckt Loading You can display Branch Ckt Loading (Branch Circuit Loading) status if the option to measure current at the distribution breakers is installed. You can view data for each individual panel position on the distributio...
PDU Display Interface 26 80kW InfraStruXure PDU—Operation and Configuration Panel Configuration Configure the branch metering settings for each breaker on the distribution panel. The panel position numbers on the screen correspond to the numbers on the distribution panel. (Odd numbers are on the lef...
PDU Display Interface 80kW InfraStruXure PDU—Operation and Configuration 27 Global Panel Config Configures the same number of poles or breaker ratings for all circuit breakers simultaneously. For example, if your system uses only 3-pole, 20-amp breakers, choose this option, scroll to the value 3 for...
28 80kW InfraStruXure PDU—Operation and Configuration Config Screen System/Network Use this option of the Config screen to access these options: System Password • Password : Change the system password required to access protected screens and fields in the display interface. Enter a string of up to e...
PDU Display Interface 80kW InfraStruXure PDU—Operation and Configuration 29 Electrical Config This option of the Config screen displays information about the electrical service that provides input to the InfraStruXure PDU. All of the values displayed on this screen are set at the factory. Use this i...
PDU Display Interface 30 80kW InfraStruXure PDU—Operation and Configuration Manufacturer Data Use this option of the Config screen to display a scrollable list containing information about the InfraStruXure PDU. This information is useful when requesting service or product updates. The following inf...
80kW InfraStruXure PDU—Operation and Configuration 31 System Operation How to Transfer the UPS into Maintenance Bypass Operation When servicing the UPS, transfer the UPS into maintenance bypass operation. When the UPS is operating in maintenance bypass, input power flows directly to the PDU and out ...
System Operation 80kW InfraStruXure PDU—Operation and Configuration 33 The UPS is now in maintenance bypass operation. 5. Open (turn OFF) the XR Battery Enclosure DC Disconnect circuit breaker. 6. Open (turn OFF) the Q1 circuit breaker on the PDU. 7. If applicable, open (turn OFF) the PDU Q10 Bypass...
34 80kW InfraStruXure PDU—Operation and Configuration How to Return from Maintenance Bypass Operation Note Select Help from the top-level menu screen on the PDU display interface and select the second help topic, Returning from PDU Maintenance Bypass , or follow the procedure below: 1. Close (turn O...
System Operation 36 80kW InfraStruXure PDU—Operation and Configuration c. Select UPS Into Bypass on the Control menu, and press the E NTER key. Control Menu d. Confirm the selection on the next screen: select Yes, UPS into Bypass , and press the E NTER key. Confirmation Screen Note The H2 LED above ...
80kW InfraStruXure PDU—Operation and Configuration 37 How to Ensure Total Power Off 1. Command the UPS to turn off power to the load: a. Press the E SC key at the top-level status screen to open the top-level menu and have access to eight submenus. b. Select Control , and press the E NTER key. Top-L...
System Operation 38 80kW InfraStruXure PDU—Operation and Configuration 3. Set the XR Battery Enclosure DC Disconnect circuit breaker to the OFF position. 4. Pull out all battery units in the XR Battery Enclosures to the red battery disconnect line. 5. Set the Main Input switch ( A ), and, if applica...
80kW InfraStruXure PDU—Operation and Configuration 39 How to Apply Power to the System This procedure instructs on how to apply power to a system that has already been installed. For initial start-up instructions, see the InfraStruXure 80 kW Installation and Start-Up manual. 1. Set the upstream util...
System Operation 40 80kW InfraStruXure PDU—Operation and Configuration 4. Ensure that all battery units are pushed all the way into the XR Battery Enclosures and locked into position. 5. Set the XR Battery Enclosure DC Disconnect circuit breaker to ON. 6. Set the UPS System Enable switch to ON When ...
System Operation 80kW InfraStruXure PDU—Operation and Configuration 41 7. Read the messages displayed on the UPS display interface: a. Note any alarms, and verify that they are appropriate for start-up conditions. b. Verify that the UPS accepts the input. Top-Level Status Screen 8. Command the UPS t...
System Operation 42 80kW InfraStruXure PDU—Operation and Configuration 9. To apply power to the PDU distribution panel, close (turn ON) the Q2 circuit breaker on the PDU. 10. To apply power to the PDU power cords and connected equipment, close (turn ON) the distribution panel breakers. 11. If applic...
80kW InfraStruXure PDU—Operation and Configuration 43 Communication Configuration InfraStruXure PDU Management Options Overview You have two management options for the InfraStruXure PDU. You can manage the InfraStruXure PDU along with the rest of your InfraStruXure equipment through the InfraStruXur...
44 80kW InfraStruXure PDU—Operation and Configuration Configuring the InfraStruXure Manager Connect the InfraStruXure PDU to the InfraStruXure Manager 1. Connect a Cat-5 network cable to the surge-protected ethernet port on the PDU user connection plate. You can make connections from inside the encl...
80kW InfraStruXure PDU—Operation and Configuration 45 Configuring the Network Management Interface Connect the InfraStruXure PDU to your network 1. Connect a Cat-5 network cable to the surge-protected ethernet port on the PDU user connection plate. You can make connections from inside the enclosure,...
Communication Configuration 46 80kW InfraStruXure PDU—Operation and Configuration TCP/IP configuration methods Use one of the following methods to define the TCP/IP settings needed by the InfraStruXure PDU: • Device IP Configuration Wizard (See “Device IP Configuration Wizard” on this page.) • BOOTP...
Communication Configuration 80kW InfraStruXure PDU—Operation and Configuration 47 BOOTP & DHCP configuration The Boot Mode Setting, a TCP/IP option in the InfraStruXure PDU’s Network menu, identifies how the TCP/IP settings will be defined. The possible settings are Manual , DHCP only , BOOTP on...
Communication Configuration 48 80kW InfraStruXure PDU—Operation and Configuration 3. When the InfraStruXure PDU reboots, the BOOTP server provides it with the TCP/IP settings. – If you specified a bootup file name, the InfraStruXure PDU attempts to transfer that file from the BOOTP server using TFTP...
Communication Configuration 80kW InfraStruXure PDU—Operation and Configuration 49 Local access to the control console You can use a local computer that connects to the InfraStruXure PDU through the console port on the InfraStruXure PDU monitoring unit to access the control console. 1. Select a seria...
Communication Configuration 50 80kW InfraStruXure PDU—Operation and Configuration 2. Use Ping with a size of 113 bytes to assign the IP address defined by the ARP command. For the IP address defined in step 1, use one of the following Ping commands: – Windows command format: ping 156.205.14.141 -l 1...
80kW InfraStruXure PDU—Operation and Configuration 51 How to Access a Network Management Interface on a Configured InfraStruXure PDU Web interface As your browser, you can use Microsoft ® Internet Explorer 5.0 (and higher) or Netscape ® 4.0.8 (and higher, except Netscape 6. x ) to access the InfraSt...
Communication Configuration 52 80kW InfraStruXure PDU—Operation and Configuration Telnet for basic access. Telnet provides the basic security of authentication by user name and password, but not the high-security benefits of encryption. To use Telnet to access an InfraStruXure PDU’s control console ...
Communication Configuration 80kW InfraStruXure PDU—Operation and Configuration 53 FTP and SCP You can use FTP (enabled by default) or Secure CoPy (SCP) to transfer new firmware to the InfraStruXure PDU, or to access a copy of the InfraStruXure PDU’s event logs. SCP provides the higher security of en...
80kW InfraStruXure PDU—Operation and Configuration 55 Customizing and Updating the PDU Important Safety Instructions Electrical Hazard APC does not recommend that you perform maintenance of the PDU while it is receiving input power. However, due to the critical nature of data center loads, this may ...
56 80kW InfraStruXure PDU—Operation and Configuration PDU Orderable Part List Circuit Breakers PD1P20ABBSD single-pole, 20-amp breaker PD3P20ABBSD three-pole, 20-amp breaker PD1P50ABBSD single-pole, 50-amp breaker PD3P80ABBSD three-pole, 80-amp breaker PD2P20ABBSD two-pole, 20-amp breaker PD3P100ABB...
Customizing and Updating the PDU 80kW InfraStruXure PDU—Operation and Configuration 57 Power Cables 30 A, 3-wire power cables PDW7L6-30C 7-foot power cable PDW43L6-30C 43-foot power cable PDW9L6-30C 9-foot power cable PDW45L6-30C 45-foot power cable PDW11L6-30C 11-foot power cable PDW47L6-30C 47-foo...
58 80kW InfraStruXure PDU—Operation and Configuration How to Add Circuit Breakers and Power Cables Add a circuit breaker on the PDU 1. Snap and bolt the new circuit breaker into a position on the panel. 2. Remove the corresponding plastic blanking plate on the front panel of the PDU. Add a power cab...
Customizing and Updating the PDU 80kW InfraStruXure PDU—Operation and Configuration 59 4. At the front of the PDU, connect the power cord’s individual wires: a. If you have branch current monitoring installed, route the phase conductor through a current sensor. If it is a three-phase cable, route th...
60 80kW InfraStruXure PDU—Operation and Configuration How to Test the EPO Switch Overview After a certified electrician has connected an EPO switch to the PDU monitoring unit by way of the user connection plate, you can easily test the switch to make sure it is wired and working properly. The illust...
Customizing and Updating the PDU 80kW InfraStruXure PDU—Operation and Configuration 61 4. If the test was successful, place the Arm/Test rocker switch back to the Arm position. The PDU display interface will clear the EPO test mode alarm. If the test was not successful, see the troubleshooting chart...
Customizing and Updating the PDU 64 80kW InfraStruXure PDU—Operation and Configuration How to connect contacts to the PDU monitoring unit. 1. Choose one or more contact numbers on the User/EPO contacts port on the user connection plate to which you will connect the contacts. The user connection plat...
80kW InfraStruXure PDU—Operation and Configuration 65 How to Download Firmware Upgrades Upgrading the PDU monitor processor You can download available PDU monitor processor upgrades through the PDU display interface. The most obvious indication that a firmware upgrade is necessary occurs when the Ne...
80kW InfraStruXure PDU—Operation and Configuration 67 Specifications 80 kW InfraStruXure PDU Performance Transformer Efficiency (if installed) 97% System Full Load Output Rating 80kW System Monitoring Of Current Distribution branch monitoring (optional), subfeed Of Voltage AC main input, bypass inpu...
80kW InfraStruXure PDU—Operation and Configuration 71 Product Information InfraStruXure Standard Warranty APC warrants that all components of the InfraStruXure system will be free from defect in material and workmanship for a period of two years from the date of start up when start up has been perfo...
80kW InfraStruXure PDU—Operation and Configuration 73 Life-Support Policy APC Three-Phase Systems As a general policy, American Power Conversion Corporation and its affiliates and subsidiaries worldwide (APC) do not recommend the use of any of its products in life support applications where failure ...
80kW InfraStruXure PDU—Operation and Configuration 74 How to Obtain Service How to contact APC Customer support for this or any other APC product is available at no charge in any of the following ways: • Visit the APC Web site to access documents in the APC Knowledge Base and to submit any customer ...
InfraStruXure PDU—Operation and Maintenance 75 Appendix Changes in This Manual Overview The following list references the specific changes made to this manual since its last release (990-1468B). General Changes Updated manual to reflect the InfraStruXure PDU’s network management capabilities. Change...
Index 80kW InfraStruXure PDU—Operation and Configuration 77 A Access to the control console , 49 to the PDU through FTP , 53 to the PDU through SCP , 53 to the PDU through SNMP , 52 Access holes, for cables , 6 Active alarms , 22 Add circuit breakers and power cables, how to , 58 – 59 Agency approva...
*990-1468C* APC Worldwide Customer Support Customer support for this or any other APC product is available at no charge in any of the following ways: • Visit the APC Web site to access documents in the APC Knowledge Base and to submit customer support requests.– www.apc.com (Corporate Headquarters) ...
APC Manuals
-
APC AR8163ABLK
Manual
-
APC 1500 VA
Manual
-
APC PRO 1200/1500
Manual
-
APC DP300E Series
Manual
-
APC 1500RMXL2U
Manual
-
APC 1400VA XL
Manual
-
APC VA 1000
Manual
-
APC SUA24XLBP
Manual
-
APC 1000
Manual
-
APC RBC9
Manual
-
APC 450
Manual
-
APC 2000
Manual
-
APC RBC9I
Manual
-
APC AP9604S
Manual
-
APC AP9554
Manual
-
APC RS 540W
Manual
-
APC Smart-UPS 1000
Manual
-
APC H10
Manual
-
APC SURTA2000XL
Manual
-
APC 4075KVA208V
Manual