Page 3 - Contents
Contents NetShelter 24 U AV Enclosure Installation Manual i Introduction ..................................................................... 1 Safety Warnings and Cautions ...................................... 1 Unpacking the Enclosure ............................................... 2 Component I...
Page 5 - Introduction; Safety Warnings and Cautions
1 NetShelter 24 U AV Enclosure Installation Manual Introduction The American Power Conversion (APC ® ) NetShelter ® AV Enclosure is a high-quality enclosure for storage of industry-standard (EIA-310), 19-inch rack-mount hardware, which includes servers, voice, data, networking, security, audio-visua...
Page 6 - Unpacking the Enclosure
NetShelter 24 U AV Enclosure Installation Manual 2 Unpacking the Enclosure Disclaimer American Power Conversion is not responsible for damage sustained during reshipment of this product. Receiving inspection Inspect the package and contents for shipping damage, and make sure that all parts were sent...
Page 7 - Component Identification
3 NetShelter 24 U AV Enclosure Installation Manual Component Identification Enclosure Roof with cable access (AR7214) Removable side panel with lock (AR7376; Qty 2) Enclosure frame Hardware bag (see page 4) Side brace Adjustable leveling feet Key for doors and side panels Caster Re...
Page 8 - Hardware bag
NetShelter 24 U AV Enclosure Installation Manual 4 Hardware bag TORX ® T30/#2 Phillips wrench (1) #10-32 screws (60) M5 x 12 screws (4) 7-mm hole plugs (4) 5-mm hole plugs (5) Frame handle cutout cover (2) ns 17 26 a
Page 9 - Helpful Steps for Reinstalling a Door
5 NetShelter 24 U AV Enclosure Installation Manual Helpful Steps for Reinstalling a Door Note: Doors self-align on hinge pins when properly reinstalled. 1. At a 90-degree angle to the front of the enclosure, position the door over the hinge pins ( ). 2. Use slight pressure to pull the door away fr...
Page 10 - Removing and Reinstalling the Roof
NetShelter 24 U AV Enclosure Installation Manual 6 Removing and Reinstalling the Roof × 2 ns 17 24 a
Page 11 - Enclosure Installation; Moving the Enclosure
7 NetShelter 24 U AV Enclosure Installation Manual Enclosure Installation Moving the Enclosure Caution: To avoid damaging the enclosure and causing a tip hazard, make sure the leveling feet are up before moving the enclosure. Casters. The enclosure can be moved on its casters with up to 1021 kg (2,2...
Page 12 - Leveling the Enclosure
NetShelter 24 U AV Enclosure Installation Manual 8 Leveling the Enclosure Required tools: Warning: The leveling feet at the corners provide a stable base if the floor is uneven, but they cannot compensate for a badly sloped surface. To adjust the leveling feet after equipment has been installed, use...
Page 13 - Reversing the Front Door
9 NetShelter 24 U AV Enclosure Installation Manual Reversing the Front Door If desired, you can reverse the front door so the door opens from the opposite side of the enclosure. 1. Remove the APC nameplate from the front door. 2. Remove the grounding wire using the TORX wrench (provided). 3. Remove ...
Page 16 - Securing the Enclosure
NetShelter 24 U AV Enclosure Installation Manual 12 Securing the Enclosure For additional stabilization, secure the enclosure to the floor. Use fastener locations on the outside or inside of the enclosure, and choose from the accessories shown below. Accessory SKU Description Pallet/bolt-down bracke...
Page 17 - Grounding the Enclosure
13 NetShelter 24 U AV Enclosure Installation Manual Grounding the Enclosure Each enclosure should be grounded directly to the building ground using one of the designated grounding locations (two M6 threaded inserts) at the top or bottom of the enclosure. • Use a Common Bonding Network Jumper kit (fo...
Page 18 - Equipment Installation; Adjusting the Vertical Mounting Rails
NetShelter 24 U AV Enclosure Installation Manual 14 Equipment Installation Installing equipment in the NetShelter AV Enclosure may require adjusting the vertical mounting rails to the correct depth for your equipment and then installing equipment. Adjusting the Vertical Mounting Rails Audio-visual e...
Page 21 - Installing Equipment
17 NetShelter 24 U AV Enclosure Installation Manual Installing Equipment Warning: To prevent the enclosure from tipping over after equipment installation: • Make sure you have secured the enclosure before installing equipment. • Load the heaviest equipment first toward the bottom of the enclosure to...
Page 22 - Cable Routing and Cable Management; Vertical 0 U Accessory Channels
NetShelter 24 U AV Enclosure Installation Manual 18 Cable Routing and Cable Management Vertical 0 U Accessory Channels The vertical 0 U accessory channels provide toolless mounting capabilities for APC Rack Power Distribution Units (Rack PDU) and APC cable management accessories (see page 19). The v...
Page 23 - Accessories
19 NetShelter 24 U AV Enclosure Installation Manual Accessories For additional information, see the product page on the APC Web site, www.apc.com . Accessory Part Number Description Copper busbar AR8395 20 U copper busbar for NetShelter AV enclosures. Shelf AR8125 Adjustable, reversible shelf. 115 V...
Page 26 - Specifications
NetShelter 24 U AV Enclosure Installation Manual 22 Specifications Height 1199 mm (47.2 in) Width 600 mm (23.6 in) Depth 825 mm (32.5 in) Net weight 81.65 kg (180 lb) Total open area (front door) 345 808 mm 2 (536.0 in 2 ) Total open area (rear door) 375 870 mm 2 (582.6 in 2 ) Open area per U (front...
Page 27 - APC Limited Factory Warranty
23 NetShelter 24 U AV Enclosure Installation Manual APC Limited Factory Warranty The limited warranty provided by American Power Conversion (APC ® ) in this Statement of Limited Factory Warranty applies only to Products you purchase for your commercial or industrial use in the ordinary course of you...
Page 32 - APC Worldwide Customer Support
5/2010 990-4300 APC Worldwide Customer Support Customer support for this or any other APC product is available at no charge in any of the following ways: • Visit the APC Web site to access documents in the APC Knowledge Base and to submit customer support requests. – www.apc.com (Corporate Headquart...